For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (GPD)GUMMIDIPUNDI to (VTM)VETAPALEMU


Address: National Highway 5, Gummidipundi, Tamil Nadu 601201, India

Station Code: GPD

Station Name: GUMMIDIPUNDI

Zone: SR/Southern

Train Frequency Weekly: 45

Station Traffic: Low

Address: Vetapalem Railway Station, Vetapalem, Andhra Pradesh 523187, India

Station Code: VTM

Station Name: VETAPALEMU

Zone: SCR/South Central

Train Frequency Weekly: 125

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
17643CIRCAR EXPGPD18:45VTM23:164:31M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17643 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
Press Release No.2714-04-2023
Hubballi
Press Release No.27, Regulation, Cancellation & Rescheduling / Regulation of trains

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No.27 Dt: 14.04.2023

I.REGULATION OF TRAIN

As notified by South Central Railway, due to engineering work for the commissioning of the third railway line between Chirala and Vetapalemu stations of Vijayawada division, Train No. 22818 Mysuru-Howrah Weekly Superfast Express, leaving from Mysuru o­n April 16, 2023 will be regulated for 140 minutes enroute.

II.CANCELLATION OF TRAINS

Due to the suspension of Road No. 3 and line block o­n all lines at Kalem yard for the launching of Bridge No. 188 B, Train Nos. 07379/07380 Kulem - Vasco-Da-Gama - Kulem DEMU Special will be cancelled o­n April 17, 2023.

III.RESCHEDULING / REGULATION OF TRAIN

Due to engineering work at Nekurseni station in connection with Narayangarh - Bhadrak third line work, South Eastern Railway has notified that Train No. 12246 Sir M. Visvesvaraya Terminal Bengaluru-Howrah Duronto Express, departing o­n April 18, 2023 will be rescheduled by 60 minutes and regulated for 30 minutes enroute.

                                                                                                                           Aneesh Hegde
                                                                         Chief Public Relations Officer                                                                                                   South Western Railway, Hubballi 





2
No.PUB/MAS/2020/07/04 06-07-2022
Chennai
GO GREEN MISSION: 21 RAILWAY STATIONS IN CHENNAI DIVISION WILL SPOT GREEN PATCHES

                                                               à¤šà¥‡à¤¨à¥à¤¨à¥ˆà¤®à¤‚डल/CHENNAI DIVISION

                                                 

             à¤ªà¥à¤°à¥‡à¤¸ विज्ञप्ति /PRESS RELEASE


Railway stations in Chennai Division will soon be beautified with green cover by planting low height plants, shrubs, creepers, Aromatic plants, herbs/medicinal plants, climbers, ornamental plants, flowering plants etc., which are suitable to the local soil and climatic condition.  Vacant spaces available in the Railway station approach roads and along the track of railway premises will be utilized for development of such green cover patches.

In this connection, the Engineering department of Chennai Division invited Expression of Interest (EOI) o­n 05.07.2022 from NGOs, Trusts, Charitable Institutions, Corporates, Government Bodies, Individuals and self help groups for the development of green cover patches in railway premises.

In the first phase, 21 railway stations (Mambalam, Tambaram, Chengalpet, Nungambakkam, Guindy, Chennai Egmore, Chennai Chetpet, Jolarpettai, Walajah Road, Katpadi, Tiruttani, Arakkonam, Perambur, Villivakkam, Ambattur, Avadi, Thiruninravur, Thiruvallur, Gummidipundi, Ponneri and Sullurpetta) in Chennai Division have been identified for beautification before the o­ncoming monsoon season. This beautification project will be implemented o­n Memorandum of Understanding (MoU) basis for a period of o­ne year where it may be extended up to 3 years with mutual consent based o­n their performance.

Some of the important prerequisites to be adhered by the parties during the development of green cover patches are given below

·The species of the plant selected for beautifying should not restrict the visibility of signals or interfere with electrical wire or train operations.

·Development work should not affect train operations in and around the stations.

·The development area should not damage any signal cables and other railway infrastructure.

·Mechanised excavation will not be permitted and such machinery will not be allowed near the railway track.

·The agency concerned would also be responsible for proper pruning and branch cutting.

Chennai Division makes relentless efforts to make its stations aesthetically pleasing and environment-friendly. Rail users are requested to join hands with Railways in maintaining cleanliness in train and Railway Stations.


Follow us

https://sr.indianrailways.gov.in/index.jsp

https://twitter.com/DrmChennai

https://www.facebook.com/Chennai-Division-Southern-Railway-103282828869816



(Elumalai A)
PRO/MAS





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit