For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








2 Trains from (GGN)GURGAON to (gjl)gajraula jn


Address: 122006, India

Station Code: GGN

Station Name: GURGAON

Zone: NR/Northern

Train Frequency Weekly: 401

Station Traffic: High

Address: Gajraula Jn, NH 24, Gajraula, Uttar Pradesh 244235, India

Station Code: GJL

Station Name: GAJRAULA JN

Zone: NR/Northern

Train Frequency Weekly: 251

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
14312ALA HAZRAT EXPGGN13:23GJL17:053:42M,TU,TH2A,3A,SL,GN,14312 Status
14322BAREILLY EXPRESSGGN13:23GJL17:053:42W,F,SA,SU2A,3A,SL,GN,14322 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
118/2023-24 25-05-2023
Chennai
Update on Katpadi Station Redevelopment works



Southern Railway has taken up Katpadi Station redevelopment in order to offer a world-class ambience, futuristic infra and airport-like facilities for passengers. Tender was awarded for the redevelopment in September 2022 and the redevelopment work is progressing at a steady pace.

Works executed recently

·Architectural & structural drawing of Phase-I & Phase II buildings.

·Environment monitoring survey completed.

·GRIHA rating for Katpadi station Redevelopment work.

·Project Management Site Office construction completed.

·Staff quarters footing work completed.

Other works in progress

·Site laboratory & mess construction work in progress.

·Setting up of a Batching plant in progress.

·Architectural & structural Design of the Station Buildings, Multi-level Car Parking, Multi-level Two-wheeler Parking, Foot-Over-Bridge, Air-Concourse & other buildings in progress.

·Staff quarters foundation backfilling in progress.

·Site cleaning & Marking for Scout, Artesian, RPF barrack in progress.

Works executed So far

·Master Plan Validation completed.

·Traffic Survey work completed.

·Utility Scanning completed.

·Preliminary works such as Mapping and Topographical survey, drone survey, DGPS Survey, Traffic survey, tree inventory, joint inventory of movable and immovable assets.

·All kind of Soil test (Geotechnical investigation) completed at various locations.

·Project management Services have commenced work.

·Site clearance work completed for building locations for Phase-I & Phase II.

·Right of way, which is a legal right to enter and carry out the work, has been provided to the EPC contractor for construction of Phase-I building for Staff quarters (Type-II - 16 units, 2 blocks), Barrack and Scout, P- way and Signal Warehouse, SSE Tele/Signal yard space, Gang tool cum Restroom Artisans room, Parcel/RMS office and Elevated trolley path, MLCP/MLTP and PWAY shed, Sump, STP , Solid waste management System including incinerator, External Service, Departure Air Concourse & Departure terminal building.

·On a regular basis project review meetings are held with the stakeholders of the project.

·Fabrication of Sign boards & barricades completed.

Katpadi (KPD) Station Redevelopment works

The work of redevelopment of Katpadi Railway station was awarded as EPC contract to M/s Engineering Projects (India) Ltd, Chennai at a cost of Rs. 329.32 Crore, setting a time frame of 36 months from D Date, i.e. from 01-12-2022, for completion of the project.  M/sVoyants Solutions Pvt Ltd, Gurgaon have been tasked with the work of Project Management services (PMS) at a cost of Rs.7.89 Crore.

Two terminals (Arrival & Departure) are proposed to be constructed in the southern side, connected by Air concourses while arrival & departure lobby will be constructed in the Northern side. The Terminal Buildings will be equipped with world class amenities like waiting lounge, ticketing area, commercial area and Roof plaza etc. Elevated skywalks and subways with adequate lifts/escalators will connect both of these terminals to the bus stand thus enabling hassle-free inter-modal connectivity.  A dedicated space for handling parcels will also be constructed.

                                                            

 Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer




2
17-05-2023
Cancellation /Short Termination/ Short Origination/Diversion / Rescheduling of trains due to traffic block on Moradabad- Saharanpur Section

New Delhi

Dated 17.05.2023

Cancellation /Short Termination/ Short Origination/Diversion / Rescheduling of trains due to traffic block o­n Moradabad- Saharanpur Section

 

It is notified for the information of the general public that due to traffic block for non- interlocking work at Chodiala Station in connection with commissioning of additional loop line station o­n Moradabad- Saharanpur section,the following trains shall remain temporarily cancelled/short terminated/short originate /diverted/ rescheduled as under:-

⮚Cancellation of trains

S. No.

Train

Between

JCO

Trips

1

04373

Dehradun–Saharanpur Special

21.05.23& 22.05.23

02

2

04374

Saharanpur – Dehradun Special

21.05.23 & 22.05.23

02

⮚Rescheduling of trains

S. No.

Train

Between

JCO

By Minutes

1

19020

Haridwar –Bandra Terminus

21.05.23 & 22.05.23

60 Minutes from Haridwar

2

14618

Amritsar – BanmankhiExpress

22.05.23

150 minutes from Amritsar

3

14305

Delhi-Haridwar Express

21.05.23 & 22.05.23

120 Minutes from Delhi

⮚Short Termination/Origination of trains

S. No.

Train

Between

JCO

At/From

1

14712/14711

Haridwar-Sriganganagar-Haridwar Express

22.05.23

Saharanpur

2

12054/12053

Haridwar- Amritsar- Haridwar Jhshtbdi

22.05.23

Saharanpur

⮚Diversion of train

S. No.

Train

Between

JCO

Diverted via

1

15011

Lucknow – Chandigarh express

21.05.23

Gajraula-Hapur-Meerut City- Saharanpur.

⮚Regulation of trains

S. No.

Train

Between

JCO

By Minutes

1

22355

Patliputra-Chandigarh Express

21.05.23

60 minutes.en-route

2

14317

Indore-Dehradun Express

20.05.23 & 21.05.23

60 minutes.in Delhi Division

 

Trains already Cancelled/Diverted due to 08.30 hrs. block in Saharanpur Yard

 

1

Train

Between

Effective from JCO

Cancelled/Diverted

1

14712

Sri Ganganagar -Rishikesh

21.05.23

Cancelled

2

12054

Amritsar-Haridwar

21.05.23

Cancelled

3

15012

Chandigarh-Lucknow

21.05.23

Cancelled

4

14618

Amritsar- Banmankhi

21.05.23

Diverted via Panipat-Hapur-Moradabad

5

22552

Jalandhar City-Darbhanga

21.05.23

Diverted via Panipat-Hapur-Moradabad

6

12017

New Delhi-Dehradun

21.05.23

COMMENTS
NO Comments. Be the first to Comment...

Add Comment






Submit