For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (GGN)GURGAON to (NCB)NEW COOCH BEHAR


Address: 122006, India

Station Code: GGN

Station Name: GURGAON

Zone: NR/Northern

Train Frequency Weekly: 401

Station Traffic: High

Address: New Cooch Behar Railway Station, Cooch Behar, West Bengal 736101, India

Station Code: NCB

Station Name: NEW COOCH BEHAR

Zone: NFR/Northeast Frontier

Train Frequency Weekly: 301

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
15623BGKT KYQ EXPDEC03:46NCB17:1537:29TU2A,3A,SL,GN,15623 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
118/2023-24 25-05-2023
Chennai
Update on Katpadi Station Redevelopment works



Southern Railway has taken up Katpadi Station redevelopment in order to offer a world-class ambience, futuristic infra and airport-like facilities for passengers. Tender was awarded for the redevelopment in September 2022 and the redevelopment work is progressing at a steady pace.

Works executed recently

·Architectural & structural drawing of Phase-I & Phase II buildings.

·Environment monitoring survey completed.

·GRIHA rating for Katpadi station Redevelopment work.

·Project Management Site Office construction completed.

·Staff quarters footing work completed.

Other works in progress

·Site laboratory & mess construction work in progress.

·Setting up of a Batching plant in progress.

·Architectural & structural Design of the Station Buildings, Multi-level Car Parking, Multi-level Two-wheeler Parking, Foot-Over-Bridge, Air-Concourse & other buildings in progress.

·Staff quarters foundation backfilling in progress.

·Site cleaning & Marking for Scout, Artesian, RPF barrack in progress.

Works executed So far

·Master Plan Validation completed.

·Traffic Survey work completed.

·Utility Scanning completed.

·Preliminary works such as Mapping and Topographical survey, drone survey, DGPS Survey, Traffic survey, tree inventory, joint inventory of movable and immovable assets.

·All kind of Soil test (Geotechnical investigation) completed at various locations.

·Project management Services have commenced work.

·Site clearance work completed for building locations for Phase-I & Phase II.

·Right of way, which is a legal right to enter and carry out the work, has been provided to the EPC contractor for construction of Phase-I building for Staff quarters (Type-II - 16 units, 2 blocks), Barrack and Scout, P- way and Signal Warehouse, SSE Tele/Signal yard space, Gang tool cum Restroom Artisans room, Parcel/RMS office and Elevated trolley path, MLCP/MLTP and PWAY shed, Sump, STP , Solid waste management System including incinerator, External Service, Departure Air Concourse & Departure terminal building.

·On a regular basis project review meetings are held with the stakeholders of the project.

·Fabrication of Sign boards & barricades completed.

Katpadi (KPD) Station Redevelopment works

The work of redevelopment of Katpadi Railway station was awarded as EPC contract to M/s Engineering Projects (India) Ltd, Chennai at a cost of Rs. 329.32 Crore, setting a time frame of 36 months from D Date, i.e. from 01-12-2022, for completion of the project.  M/sVoyants Solutions Pvt Ltd, Gurgaon have been tasked with the work of Project Management services (PMS) at a cost of Rs.7.89 Crore.

Two terminals (Arrival & Departure) are proposed to be constructed in the southern side, connected by Air concourses while arrival & departure lobby will be constructed in the Northern side. The Terminal Buildings will be equipped with world class amenities like waiting lounge, ticketing area, commercial area and Roof plaza etc. Elevated skywalks and subways with adequate lifts/escalators will connect both of these terminals to the bus stand thus enabling hassle-free inter-modal connectivity.  A dedicated space for handling parcels will also be constructed.

                                                            

 Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer




2
99/2023-24 17-05-2023
Chennai
Superfast Special Trains between Erode and Rangapara North



Special Trains will be operated in Erode – Rangapara North to clear extra rush as detailed below:

Train No. 06073/06074 Erode – Rangapara North - Erode Superfast Specials:


Train No. 06073 Erode - Rangarapara North Superfast Special Fare Special will leave Erode at 02.30 hrs o­n 24th and 31st May, 2023 (Wednesday) and reach Rangapara North at 10.00 hrs, the third day (2 Services)


In return direction Train No. 06074 Rangapara North – Erode Superfast Special Fare Special will leave Rangapara North at 05.15 hrs o­n 27th May & 03rd June, 2023 (Saturday) and reach Erode at 13.15 hrs, the third day (2 Services)


Coach Composition: 2- AC First Class cum AC Two Tier Coaches, 1- AC Two Tier Coach, 14- Sleeper Class Coaches, 4- General Second Class Coaches & 2- Luggage cum Brake Vans: Total (23 Coaches)


The details of timings and stoppages of Train No. 06073/06074 Erode – Rangapara North- Erode Superfast Special Fare Specials are as follows (Timings in hours):


Train No. 06073 Erode-  Rangapara North Superfast Special Fare Special

↓

Station

↑

Train No. 06074 Rangapara North – Erode Superfast Special Fare Special

02.30 (Wednesday)

(d)

Erode

(a)

13.15 (Monday)

03.32/03.35

(a/d)

Salem

(a/d)

11.57/12.00

05.40/05.45

(a/d)

Jolarpettai

(a/d)

10.20/10.22

07.00/07.05

(a/d)

Katpadi

(a/d)

09.10/09.15

09.00/09.05

(a/d)

Perambur

(a/d)

07.00/07.05

11.13/11.15

(a/d)

Gudur

(a/d)

04.23/04.25

11.33/11.35

(a/d)

Nellore

(a/d)

02.30/02.32

13.06/13.08

(a/d)

Ongole

(a/d)

00.58/01.00

14.23/14.25

(a/d)

Tenali

(a/d)

23.50/23.52

15.05/15.15

(a/d)

Vijayawada

(a/d)

23.00/23.10

16.00/16.02

(a/d)

Gudivada

(a/d)

21.50/21.51

16.30/16.31

(a/d)

Kaikalur

(a/d)

21.20/21.22

16.47/16.48

(a/d)

Akividu

(a/d)

21.00/21.02

17.06/17.07

(a/d)

Bhimavaram Town

(a/d)

20.35/20.36

17.42/17.43

(a/d)

Tanuku

(a/d)

19.30/19.32

18.30/18.32

(a/d)

Rajamundry

(a/d)

18.38/18.40

19.12/19.14

(a/d)

Samalkot

(a/d)

17.54/17.56

23.18/23.20

(a/d)

Duvvada

(a/d)

16.30/16.32

23.45/00.05

(a/d)

Visakhapatnam

(a/d)

15.30/15.50

00.55/01.00

(a/d)

Vizianagaram

(a/d)

14.30/14.35

01.53/01.55

(a/d)

Srikakulam Road

(a/d)

13.35/13.37

03.05/03.07

(a/d)

Palasa

(a/d)

12.41/12.43

04.07/04.12

(a/d)

Berhampur

(a/d)

11.10/11.15

06.00/06.20

(a/d)

COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit