For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








2 Trains from (GGN)GURGAON to (AMRO)AMROHA


Address: 122006, India

Station Code: GGN

Station Name: GURGAON

Zone: NR/Northern

Train Frequency Weekly: 401

Station Traffic: High

Address: Amroha Railway Station, Amroha, Uttar Pradesh 244221, India

Station Code: AMRO

Station Name: AMROHA

Zone: NR/Northern

Train Frequency Weekly: 273

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
14312ALA HAZRAT EXPGGN13:23AMRO17:314:08M,TU,TH2A,3A,SL,GN,14312 Status
14322BAREILLY EXPRESSGGN13:23AMRO17:314:08W,F,SA,SU2A,3A,SL,GN,14322 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
118/2023-24 25-05-2023
Chennai
Update on Katpadi Station Redevelopment works



Southern Railway has taken up Katpadi Station redevelopment in order to offer a world-class ambience, futuristic infra and airport-like facilities for passengers. Tender was awarded for the redevelopment in September 2022 and the redevelopment work is progressing at a steady pace.

Works executed recently

·Architectural & structural drawing of Phase-I & Phase II buildings.

·Environment monitoring survey completed.

·GRIHA rating for Katpadi station Redevelopment work.

·Project Management Site Office construction completed.

·Staff quarters footing work completed.

Other works in progress

·Site laboratory & mess construction work in progress.

·Setting up of a Batching plant in progress.

·Architectural & structural Design of the Station Buildings, Multi-level Car Parking, Multi-level Two-wheeler Parking, Foot-Over-Bridge, Air-Concourse & other buildings in progress.

·Staff quarters foundation backfilling in progress.

·Site cleaning & Marking for Scout, Artesian, RPF barrack in progress.

Works executed So far

·Master Plan Validation completed.

·Traffic Survey work completed.

·Utility Scanning completed.

·Preliminary works such as Mapping and Topographical survey, drone survey, DGPS Survey, Traffic survey, tree inventory, joint inventory of movable and immovable assets.

·All kind of Soil test (Geotechnical investigation) completed at various locations.

·Project management Services have commenced work.

·Site clearance work completed for building locations for Phase-I & Phase II.

·Right of way, which is a legal right to enter and carry out the work, has been provided to the EPC contractor for construction of Phase-I building for Staff quarters (Type-II - 16 units, 2 blocks), Barrack and Scout, P- way and Signal Warehouse, SSE Tele/Signal yard space, Gang tool cum Restroom Artisans room, Parcel/RMS office and Elevated trolley path, MLCP/MLTP and PWAY shed, Sump, STP , Solid waste management System including incinerator, External Service, Departure Air Concourse & Departure terminal building.

·On a regular basis project review meetings are held with the stakeholders of the project.

·Fabrication of Sign boards & barricades completed.

Katpadi (KPD) Station Redevelopment works

The work of redevelopment of Katpadi Railway station was awarded as EPC contract to M/s Engineering Projects (India) Ltd, Chennai at a cost of Rs. 329.32 Crore, setting a time frame of 36 months from D Date, i.e. from 01-12-2022, for completion of the project.  M/sVoyants Solutions Pvt Ltd, Gurgaon have been tasked with the work of Project Management services (PMS) at a cost of Rs.7.89 Crore.

Two terminals (Arrival & Departure) are proposed to be constructed in the southern side, connected by Air concourses while arrival & departure lobby will be constructed in the Northern side. The Terminal Buildings will be equipped with world class amenities like waiting lounge, ticketing area, commercial area and Roof plaza etc. Elevated skywalks and subways with adequate lifts/escalators will connect both of these terminals to the bus stand thus enabling hassle-free inter-modal connectivity.  A dedicated space for handling parcels will also be constructed.

                                                            

 Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.13/2023-2419-04-2023
Secunderabad
PR No. 13 PM flags off Rajasthan’s first Vande Bharat Express between Ajmer and Delhi Cantt


Flags sixth Vande Bharat in last 2 months

“Rajasthan gets its first Vande Bharat Express today. This will significantly enhance connectivity and boost tourism”

“Vande Bharat realizes the spirit of ‘India First Always First’”

“Vande Bharat train has become synonymous with development, modernity, stability and self-reliance”

“Unfortunately an important and basic need of the citizens like railway was turned into an arena of politics’

“Railway budget for Rajasthan has been increased 14 times since 2014, from 700 crore in 2014 to more than 9500 crore rupees this year”

“Bharat Gaurav circuit trains are continuously strengthening the spirit of Ek Bharat - Shreshtha Bharat”

“When the infrastructure of connectivity like railway is strong, then the country is strong. This benefits the common citizen of the country, benefits the poor and middle class of the country”

 

The Prime Minister, Shri Narendra Modi flagged off Rajasthan’s first Vande Bharat Express train via video conferencing today. 

Addressing the gathering, the Prime Minister congratulated the land of valour Rajasthan for getting its first Vande Bharat Train that will not o­nly ease the travel between Jaipur Delhi but will also give a push to the tourism industry of Rajasthan as it will help the access to places of faith like Theerthraj Pushkar and Ajmer Sharif. 

In the last two months, the Prime Minister recalled getting the opportunity to flag off six Vande Bharat trains in the country including the Delhi-Jaipur Vande Bharat Express and gave the example of Mumbai-Solapur Vande Bharat Express, Mumbai-Shiridi Vande Bharat Express, Rani Kamlapati-Hazrat Nizammuddin Vande Bharat Express, Secunderabad-Tirupati Vande Bharat Express and Chennai Coimbatore Vande Bharat Express. The Prime Minister pointed out that approximately 60 lakh citizens have traveled in the Vande Bharat Express since its inception. “The speed of Vande Bharat is its main speciality and it is saving the time of  people”, the Prime Minister said. According to a study, the Prime Minister noted that those who travel by Vande  Bharat express save 2500 hours o­n every trip. He highlighted that the Vande Bharat Express is  developed while keeping in mind manufacturing skills, safety, fast pace and beautiful design. Reiterating that the citizens have highly appreciated the Vande Bharat Express, the Prime Minister said that the Express train is the first semi automatic train to be developed in India and o­ne of world’s first compact and efficient trains. “Vande Bharat is the first train to be compatible with the indigenous safety Kavach system”, Shri Modi said. He pointed out that it is the first train to scale the heights of Sahyadri Ghats without needing an extra engine. “The Vande Bharat Express realizes the spirit of ' ‘India First Always First’”, he said. The Prime Minister expressed delight that the Vande Bharat Express has become synonymous with development, modernity, stability  and ‘Atmanirbharta’.  

The Prime Minister lamented the fact that an important and basic need of the citizens like railways was turned into an arena of politics. He said India inherited a fairly big railway network at the time of Independence but political interest dominated the need for modernization in the years after independence. Politics was evident in selection of railway minister, announcement of trains and even in recruitments. Land acquisition was done under the false pretense of railway jobs and many unmanned crossings continued for a very long time and cleanliness and safety took a back seat. The situation took a turn for the better after 2014 when people elected a stable government with full majority, “When the pressure of political give and take receded, railway heaved a sigh of relief and sprinted to new heights”  he said. 

The Prime Minister said that the government at the center is making Rajasthan a land of new opportunities. He said that the central government has done unprecedented work for the connectivity that is so important for a state like Rajasthan which has tourism as an important part of its economy. Shri Modi mentioned the dedication of Delhi Dausa Lalsot section of Delhi Mumbai Expressway in February. The section will benefit Dausa, Alwar, Bharatpur, Sawai Madhopur, Tonk, Bundi and Kota districts. The Prime Minister informed that the central government is working o­n about 1400 kilometer long roads in the border areas in Rajasthan and more than 1000 kilometer long roads are proposed in the state. 

Underlining the priority that is being accorded to connectivity in Rajasthan, the Prime Minister mentioned starting of work o­n the railway line from Taranga Hill to Ambaji. This line was a century old pending demand which is now being fulfilled. He also informed that broad gauging of Udaipur-Ahmedabad line has already been completed and more than 75 percent railway network has been electrified.  Shri Modi remarked that the railway budget for Rajasthan has been increased 14 times since 2014, from 700 crore in 2014 to more than 9500 crore rupees this year. Speed of doubling of the railway lines also doubled. The gauge change and doubling has helped tribal areas like Dungerpur, Udaipur, Chittorgarh, Pali and Sirohi. Dozens of stations are being upgraded under Amrit Bharat Railway Yojana, he added. 

Keeping in mind the convenience of the tourists, the Prime Minister informed that the government is also running different types of circuit trains and gave the example of Bharat Gaurav circuit trains that have made more than 70 trips so far ferrying more than 15 thousand passengers. “Be it Ayodhya-Kashi, Dakshin Darshan, Dwarka Darshan, Sikh pilgrimage sites, Bharat Gaurav circuit trains have been run for many such places”, the Prime Minister said. Noting the positive feedback received o­n social media by those traveling, the Prime Minister said that these trains are continuously strengthening the spirit of Ek Bharat - Shreshtha Bharat.

The Prime Minister highlighted the o­ne Station o­ne Product campaign and said that Indian Railways has made another effort over the years in taking the local products of Rajasthan across the country. He pointed out that Indian Railways has set up around 70 o­ne Station o­ne Product Stalls including Rajasthan  Jaipuri quilts, Sanganeri block print bed sheets, rose products, and other handicrafts that are being sold in these stalls. He noted that small farmers, artisans and handicraftsmen of Rajasthan have got this new medium to reach the market. Concluding the address, the Prime Minister said that this is an example of everyone's participation in development. “When the infrastructure of connectivity like rail is strong, then the country is strong. This benefits the common citizen of the country, benefits the poor and middle class of the country”, the Prime Minister concluded and expressed confidence that the modern Vande Bharat train will play an important role in speeding up the development of Rajasthan.

Background 

The inaugural train will run between Jaipur and Delhi Cantt. railway station. The regular service of this Vande Bharat Express will start from 13th April, 2023 and will operate between Ajmer and Delhi Cantt with stops at Jaipur, Alwar and Gurgaon.

The new Vande Bharat Express will cover the distance between Delhi Cantt. and Ajmer in 5 hours 15 minutes. The present fastest train in the same route, Shatabdi Express, takes 6 hours 15 minutes from Delhi Cantt. to Ajmer. Thus, the new Vande Bharat Express will be faster by 60 minutes as compared to the present fastest train running o­n the same route.

Ajmer-Delhi Cantt. Vande Bharat Express will be the world's first semi high speed passenger train o­n high rise overhead electric (OHE) territory.  The train will improve connectivity of major tourist destinations in Rajasthan including Pushkar, Ajmer Sharif Dargah etc. Enhanced connectivity will also provide a boost to socio-economic development in the region.



(Ch.Rakesh)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit