For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








21 Trains from (GAM)GANJAM to (TIU)TILARU


Address: Ganjam, Odisha, India

Station Code: GAM

Station Name: GANJAM

Zone: ECoR/East Coast

Train Frequency Weekly: 105

Station Traffic: Medium

Address: Tilaru, Andhra Pradesh 532474, India

Station Code: TIU

Station Name: TILARU

Zone: ECoR/East Coast

Train Frequency Weekly: 93

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
20815TATA VSKP SF EXPCAP00:05CHE02:302:25M2A,3A,SL,GN,20815 Status
22809VSKP SF EXPCAP03:20CHE06:082:48W2A,3A,SL,GN,22809 Status
22841SRC MAS ANTYODAYA EXPRESSCAP03:36CHE05:562:20MUNRESERVED22841 Status
18463PRASANTHI EXPCAP07:41CHE10:252:44M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18463 Status
12839HWH MAS MAILCAP09:00CHE11:382:38M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12839 Status
22819INTER CITY EXPCAP10:03TIU12:262:23M,TU,W,TH,F,SA,SU2S,GN,22819 Status
17015VISAKHA EXPRESSCAP10:40TIU13:182:38M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17015 Status
18401PURI OKHA EXPCAP12:17CHE14:542:37SU2A,3A,SL,GN,18401 Status
58417PURI GNPR PASSCAP12:20PDSN18:005:40M,TU,W,TH,F,SA,SUUNRESERVED58417 Status
22974PURI GIMB EXPCAP13:17CHE16:032:46SA2A,3A,SL,GN,22974 Status
22879BBS TPTY SUP EXPCAP14:05CHE16:432:38SA2A,3A,SL,GN,22879 Status
22871BBS TPTY EXPRESSCAP14:05CHE16:432:38SU2A,3A,SL,GN,22871 Status
17479PURI TPTY EXPCAP16:34TIU19:393:05M,W,TH,F,SU2A,3A,SL,GN,17479 Status
11020KONARK EXPRESSCAP17:30CHE20:132:43M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11020 Status
22883PURI YPR G RATHCAP17:40CHE20:262:46F3A22883 Status
18508HIRAKUD EXPCAP18:30CHE21:052:35W,SA,SU2A,3A,SL,GN,18508 Status
22859PURI CHENNAI EXPCAP20:28CHE23:132:45SU2A,3A,SL,GN,22859 Status
12843PURI ADI EXPCAP20:28CHE23:132:45TU,TH,F,SA2A,3A,SL,GN,12843 Status
18437BBS BWIP LINK EXCAP22:07CHE01:083:01M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18437 Status
18447HIRAKHAND EXPCAP22:07CHE01:083:01M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18447 Status
18645EAST COAST EXPCAP22:22CHE01:263:04M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18645 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.981/2022-2320-03-2023
Secunderabad
PR No. 981 Third Line between Manubolu and Nellore Stations Commissioned along with Electrification

-Part of Vijayawada – Gudur Tripling & Electrification project

South Central Railway Zone in the current financial year has taken up infrastructural works o­n a large scale by giving special thrust to doubling and tripling works along with electrification. This helps in decongesting the existing saturated routes like the Grand Trunk route and eases the train operations. In this direction, third line works between Manubolu - Nellore section has been completed and commissioned for a distance of 29.3 Kms along with electrification as part of Vijayawada - Gudur Tripling & Electrification Project. This stretch of railway line falls under Nellore District of Andhra Pradesh State.

Situated in the Grand Trunk route along the Coastal region of Andhra Pradesh, the section between Vijayawada – Gudur o­n SCR plays a vital role in connecting the Northern and Eastern parts of the country with the Southern states. This route has become highly congested with the steady increase in both Passenger and Freight trains. To decongest this crucial section, the Vijayawada – Gudur Third line project was sanctioned in the year 2015-16 for a distance of 288 Kms at an approximate cost of Rs 3246 crores. The work is being executed by RVNL.

Works have been taken up simultaneously in all the stretches. So far, the sections between Ulavapadu – Kavali for a distance of 29 Kms, Talamanchi – Bitragunta - Sri Venkateswarapalem for a distance of 24.8 Kms, Sri Venkateswarapalem and Kavali for a distance of 12.2 Kms, Talamanchi – Nellore for 17 Kms and the stretch between Karavadi – Chinna Ganjam for 23.5 Kms have been completed and commissioned successfully.  Now, with the completion of 29.3 Kms a total of 135.8 Kms of third line in Vijayawada – Gudur section stands commissioned along with electrification.

Shri Arun Kumar Jain, General Manager has complimented the entire Team of both Vijayawada Division and RVNL officials, who have completed the tripling and electrification works between Manubolu - Nellore section. He stated that third line works between Vijayawada - Gudur are being taken up o­n top priority and the works are in fast progress in all the stretches simultaneously. He also stated that the Zone is planning to commission some more sections pertaining to this tripling project in this financial year.


(Ch.Rakesh)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.857/2022-2307-02-2023
Secunderabad
PR No. 857 - Special Trains Between various Destinations

         

In order to clear extra rush, South Central Railway will run Dailyspecial Trains between various destinations as detailed below:-

Sl.

Tr. No.

From - To

Dep.

Arr.

With effect from

1

07466

Rajahmundry - Visakhapatnam

09.20

14.50 (same day)

14.02.2023

2

07467

Visakhapatnam – Rajahmundry

18.20

23.35 (same day)

15.02.2023

3

07468

Visakhapatnam – Vizianagaram

18.30

19.50 (same day)

14.02.2023

4

07469

Vizianagaram – Visakhapatnam

06.10

07.30 (same day)

15.02.2023

5

07470

Visakhapatnam – Palasa

07.50

13.00 (same day)

14.02.2023

6

07471

Palasa – Visakhapatnam

13.30

17.50 (same day)

15.02.2023



Train No. 07466/07467 Rajahmundry – Visakhapatnam – Rajahmundry Special Trains:


These special trains will stop at Kadiyam, Dwarapudi, Anaparthi, Bala Bhadrapuram, Bikkavolu, Medapadu, Samalkot, Pithapuram, Gollaprolu, Durgada Gate, Ravikampadu, Annavaram, Timmapuram, Hamsavaram, Tuni, Bullipadu, Narsingapalli, Kasimkota, Anakapalle, Duvvada and Marripalem halt stations in both the directions.

 

Please note – Train No. 07466 Rajahmundry – Visakhapatnam will also stop at Bayyavaram and Thadi stations.

 

Train No. 07468/07469 Visakhapatnam – Vizianagaram – Visakhapatnam Special Trains:


These special trains will stop at Marripalem, Simhachalam, Pendurthi, Kottavalasa, Kantakapalle, Alamanda and Korukonda stations in both the directions.

 

 

Train No. 07470/07471 Visakhapatnam – Palasa – Visakhapatnam Special Trains:


These special trains will stop at Marripalem, Simhachalam, Pendurthi, Kottavalasa, Kantakapalle, Alamanda, Korukonda, Viziangaram Jn, Nellimarla, Garividi, Chipurupalli, Batwa, Sigadam, Ponduru, Dusi, Srikakulam Road, Urlam, Tilaru, Harischandrapuram, Kotabommali, Dandugopalapuram, Naupada, Rautpuram, and Pundi stations in both the directions.

 



(Ch. Rakesh)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit