For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (DBF)Dabpal to (MCI)MANCHIRYAL


Address: Dabpal Chhattisgarh

Station Code: DBF

Station Name: Dabpal

Zone: ECoR/East Coast

Train Frequency Weekly: 13

Station Traffic: Low

Address: Mancherial Police Jurisdiction Limits, Mancherial, Andhra Pradesh, India

Station Code: MCI

Station Name: MANCHIRYAL

Zone: SCR/South Central

Train Frequency Weekly: 200

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (DBF)Dabpal
(vskp)vishakapatnam 233Kms from (DBF)Dabpal

Nearest From MCI
(vskp)vishakapatnam 426Kms from (MCI)MANCHIRYAL
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
0103-01-2023
Bhubaneswar
ECoR ALL SET TO ACHIEVE RECORD PERFORMANCE IN THE FIELD OF LOADING AND INFRASTRUCTURE DEVELOPMENT



❶ Aims to surpass the last year loading 232.13 Million Tonne with a better margin.


❷ Loaded 175.32MT of freight up to December 2022 of current fiscal as against 169.39MT loaded in the corresponding period of last fiscal by registering a growth of 3.5%, i.e., 5.93 MT more.

 

❸ Hon’ble Minister of Railways Shri Ashwini Vaishnaw is monitoring the works of the zone o­n a regular basis. New Infrastructure in form of New Lines, Doubling & 3rd Lines are coming up at full pace.

 

❹ Tender awarded and work started for three World Class Stations along with upgradation of 36 Stations.

 

 

 

Despite many odds and different challenges, East Coast Railway (ECoR) is going to set new heights in the field of revenue loading and constructing new lines, doubling projects & traffic facility works along with Safety related works and other infrastructural works. This would be possible due to consistent monitoring by Railway Minister Shri Ashwini Vaishnaw Ji and guidance by General Manager Shri Roop Narayan Sunkar Ji.

 


          ECoR has loaded 175.32MT of freight up to December’2022 of the current financial year as against 169.39MT during the corresponding period of last fiscal which is 5.93 MT more and a growth of about 3.5%. In terms of Earnings from freight, ECoR has earned 14247.88 Crores during the period as against 13134.98 Crores by registering a growth of Rupees 1112.9 Crores than the last fiscal by registering an increase of 8.47%.

 

 

On the Passenger front, ECoR has carried 53.11 million passengers up to December’2022 as against 21.37 millions carried in the corresponding period of last fiscal by registering a growth of 148.5%. o­n earning from Passengers, ECoR has earned 1403.58 Crores as against 770.45 Crores by registering an increase of 82.17%.

 

 

This could be possible due to outstanding performance of all the three Divisions of East Coast Railway, i.e. Khurda Road, Waltair and Sambalpur. Relentless Round the Clock Close Monitoring & Outstanding supervision, dedicated and sincere work force brought this performance, to make this achievement a reality.

 

 

Apart from the above, East Coast Railway aims to complete remarkable infrastructural works. Vital traffic related works like, Doubling of entire Sambalpur-Titilagarh Railway Section, Angul-Talcher Road section (12 Kms.), Angul-Balram (14KMs) Link Inner Coal Corridor Connectivity Project,  3rd & 4th line between Salagaon-Rajathgarh, Doubling between Salagaon-Kapilas Road,  doubling of Jakhapura-Nayagarh except 3 block section, Third Lin between Kapilas Road & Nergundi, 3rd line between Budhapank-NTPC block cabin & 4th line between Budhapank-Talcher Road, 3rd line between Titilagarh-Kesinga and doubling between Sikir-Titilagarh along with yard remodelling, double line of 21 KMs  between Kaklur-Kawargaon-Dabpal, 3rd line between Rupra Road-Norla Road-Lanjigarh Road along with electrification, Doubling between Dummuriput-Damanjodi Section in Koraput-Rayagada branch line have been completed and commissioned during this year.

 

 

Giving priority to the much awaited Khurda Road-Balangir Railway Line project, construction works are being done from both sides to complete this at the earliest. 10.65Kms Bichupali-Jharatarbha of Khurda Road-Balangir project has been completed, recently. 11.40Kms between Khambeswarpalli-Jharatarbha is targeted to be completed by March’2023. Apart from this, 15.445 KMs between Nuagaon-Daspalla has been scheduled to be completed by February’2023 from Khurda Road side. Hon’ble Minister of Railways Shri Ashwini Vaishnaw is giving priority for the Development of Railway Infrastructure of the region and also monitoring the developmental works regularly.

 




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.725/2022-2305-12-2022
Secunderabad
PR. No. 725 - Shri Arun Kumar Jain, General Manager, SCR Conducts Annual Inspection of Secunderabad Division






- General Manager inspected Kazipet – Jammikunta – Peddapalli – Ramagundam - Manchiryal – Bellampalli - Sirpur Kaghaznagar - Manikgarh section

Shri Arun Kumar Jain, General Manager, South Central Railway undertook annual inspection of Kazipet – Jammikunta – Peddapalli – Ramagundam - Manchiryal – Bellampalli - Sirpur Kaghaznagar – Manikgarh section of Secunderabad Division today i.e., 25th November, 2022. He was accompanied by Shri A.K Gupta, Divisional Railway Manager, Secunderabad Division, Principal Heads of the various Departments and other senior officials throughout the inspection.

The General Manager commenced the inspection at Kazipet Railway station, wherein he reviewed the passenger amenities available at the station and inspected the station premises including the newly renovated Reserved Lounge. The General Manager inaugurated TTE Lobby, Refreshment Room & Base Kitchen, Solar Power Plant (50KW) and Renovated Crew Lobby at Kazipet. Shri Dayakar Pasunoori, Hon’ble Member of Parliament, Warangal and Shri Nannapaneni Narender , Hon’ble Member of Legislative Assembly, Warangal met the General Manager at Kazipet and discussed o­n various Rail development plans pertaining to their constituencies.

The General Manager inaugurated and inspected Level Crossing Gate in Uppal – Jammikunta section. Further, he conducted a detailed inspection of Jammikunta Railway station, wherein he reviewed the passenger amenities and inspected the staff quarters. He also inaugurated a Solar Power Plant (20 KW) at the station. Shri Koushik Reddy, Member of Legislative Council met the General Manager and discussed o­n developmental plans.

Further, the General Manager inspected the new Road Under Bridge in Jammikunta – Bisugir Sharif section. He also inspected a minor bridge in Kolanoor – Peddapalli section. Shri Manohar Reddy, Member of Legislative Assembly, Peddapalli met the General Manager and discussed o­n further developmental plans at Peddapalli Railway station. Later, Shri Arun Kumar Jain conducted a detailed inspection of Ramagundam Railway station, wherein he reviewed the passenger amenities and inspection the station premises including running room and circulating area. He also inaugurated Block for Ladies Running Staff, Open Gym & Children’s Park at the station and flagged off new Periodic Overhauling Rake. Later, the General Manager visited the Routine Overhauling shed at Ramagundam, wherein he inaugurated a new conference hall and participated in tree plantation program. He also inaugurated Electronic In-Motion Weigh Bridge at Metpally and Sultanabad through remote video link.

Further, the General Manager examined a major bridge in Peddampet – Manchiryal section. He visited Manchiryal Railway station and conducted a detailed inspection of the station premises, circulating area and goods shed. He examined safety of tracks and interacted with the safety staff at the station. He also inaugurated an Energy Neutral Track Maintenance Tool Cum Rest Room and Hamali’s shed at Manchiryal. Later, he conducted a speed test from Manchiryal to Bellampalli.

Shri Arun Kumar Jain proceeded o­nto Bellampalli Railway station, wherein he inspected the station premises including crew lobby, running room, carriage & wagon depot and the stalls set up for innovations and good work at the station. He also inaugurated Block for Ladies Running Staff and Open Gym & Children’s Park at Bellampalli station.

During the course of the inspection, several Public Representatives met the General Manager and submitted representations regarding passenger amenities, provision of halts, introduction of new trains etc. The General Manager also interacted with the media personnel and briefed them o­n development plans being undertaken by SCR.



(Ch. Rakesh)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit