For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (CAG)CHHABRA GUGOR to (LAR)LALITPUR


Address: 325220, India

Station Code: CAG

Station Name: CHHABRA GUGOR

Zone: WCR/West Central

Train Frequency Weekly: 89

Station Traffic: Medium

Address: Lalitpur, Uttar Pradesh 284403, India

Station Code: LAR

Station Name: LALITPUR

Zone: NCR/North Central

Train Frequency Weekly: 304

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (CAG)CHHABRA GUGOR
(rta)ruthiyai 39Kms from (CAG)CHHABRA GUGOR
(guna)guna 48Kms from (CAG)CHHABRA GUGOR
(askn)ashok nagar 91Kms from (CAG)CHHABRA GUGOR

Nearest From LAR
(mnv)mungaoli 44Kms from (LAR)LALITPUR
(pia)pipraigaon 49Kms from (LAR)LALITPUR
(makr)malkhedi 61Kms from (LAR)LALITPUR
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
12-07-2021
General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

उत्‍तर मध्‍य रेलवे

 जनसम्‍पर्क कार्यालय

                     उत्‍तरमध्‍य रेलवेप्रयागराज

पत्रांक: 11पीआर/07/2021                                               प्रेस विज्ञप्ति                                                 दिनांक: 09.07.2021

General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

Shri V K Tripathi, General Manager North Central Railway and North Eastern Railway during his two days visit to Jhansi Division started his inspection from Bhimsen station of Bhimsen-Jhansi section. Shri Tripathi reviewed the layout plan of the proposed Logistic Park at Bhimsen station. He also inspected and discussed the connectivity of the logistics park with upcoming Dedicated Freight Corridor (DFC). Apart from this, there was a detailed discussion about  systematic development at Bhimsen station. After departing from Bhimsen station, the GM inspected Malasa-Pukhrayan-Chaunrah- Kalpi-Usargaon section and Parauna- Erich Road-Moth-Nandkhas sections. He inspected the progress of doubling work of section through rear window of inspection carriage.

After reaching Jhansi, Shri Tripathi along with the Divisional Railway Manager Shri Sandeep Mathur reviewed the o­ngoing projects of Jhansi Division. He expressed satisfaction over the progress of o­ngoing passenger amenities works,. After the meeting, General Manager met with the office bearers of the union and association and discussed various important issues for the welfare of the employees.

General Manager also met the media persons of Jhansi Division and briefed them regarding progress of works related to passenger facilities. He informed the media that the doubling work of Jhansi-Kanpur railway section would be completed by June 2022. He also shared the good news of sanctioning the work of construction of ROB at level crossing gate number 117 (on Jhansi-Gwalior road route).

After that, Shri Tripathi left for the window trailing inspection of Jhansi-Lalitpur section as per his schedule. After reaching Lalitpur station, he took stock of the o­ngoing projects and saw the works related to the third line. He inspected the passenger facilities. Later he reached Khajuraho station.

It is to be informed that  Window-trailing inspection is a specialized inspection in the Indian Railways in which the track and its surrounding installations like signals, OHE, platforms etc are inspected from the rear window of an inspection car attached to a moving train. During the inspection, important parameters like cleanliness and overall condition of stations falling en-route, riding quality of the train-especially o­n points and crossings, improvement in Track Geometry Index (TGI), , OHE status, Jhansi-Kanpur doubling and Jhansi-Lalitpur third line construction and electrification work, Condition of level crossing gates en-route etc were observed by the General Manager/North Central Railway. During the inspection, General Manager directed the Divisional Railway Manager, Jhansi that

• Scrap lying along the tracks  should be removed.

• Action should be taken against the trace passers by identifying the locations of  trace passing.

• Improved level of maintenance of switch expansion joints, points, crossings and yards to be ascertained to improve riding quality and safety.

During the window trailing inspection, Shri Dinesh Verma, Additional Divisional Railway Manager (Operations), Shri Amit Sengar, Additional Divisional Railway Manager (Technical), Shri Deepak Nigam, Chief Workshop Manager (CMLR) and Shri R D Maurya, Chief Workshop Manager (Wagon Repair Workshop) along with and other senior officers of the division were present.                                                                                                                          





2
14-06-2021
Set clear targets for Electrification and honor them : GM/ NCR

उत्‍तर मध्‍य रेलवे                               जनसम्‍पर्क कार्यालय

उत्‍तर मध्‍य रेलवे, प्रयागराज

पत्रांक :11पीआर/06/2021                      प्रेस विज्ञप्ति                           दिनांक: 11.06.2021

Set clear targets for Electrification and honor them : GM/ NCR

In tune with the Indian Railways vision of becoming net zero carbon emitter by 2030, a series of steps have been taken to promote environment friendly aspects in train operations. Major paradigm shift in this regards is target 100% electrification of all Indian Railways network. North Central Railway is aggressively working in this direction to convert its entire non electrified route into electrified territories. Recently, Bhandai (near Agra)-Udimore section, Lalitpur-Udaipura section, Unchdih-Meja thermal power plant section have been electrified. GM NCR Shri V.K. Tripathi holds a series of meetings o­n Thursday to review the progress of electrification works in NCR.

In o­ne such meeting with the officers of CORE, GM asked for specific targets to be given. It was informed by the officials that electrification works of Mahoba-Khajuraho and Birlanagar-Udimore section is targeted for completion in July 2021 and August 2021 respectively. While Khajurao-Udaipura section is targeted for completion by February 2022, efforts are o­n for completion of electrification work   in Shikohabad-Farrukhabad section 2021and Etawah-Mainpuri section by December this year. General Manager stressed that commitments over targets should be honored and expressed candidly his non acceptance over time over runs.

In another meeting with senior officers of construction organization, GM reviewed the progress been done o­n Etah-Barhan section and status of electrification o­n upcoming third line between Jhansi and Bina. It was told to the General Managaer that Etah-Barhan section is targeted to be electrified by February 2022 with paper work and necessary approvals and site visits going o­n with full swing. Apart from this, electrification of Chhata-Bhuteshwar section (between Agra-Mathura) of newly constructed fourth line in Agra Divison is targeted for completion by November 2021.

General Manager instructed that a comprehensive monitoring plan should be made for day to day progress and apart from the major routes, smaller stretches leading to goods sheds or sidings at stations itself should also get totally electrified so that there should not remain any missing link of electrification in NCR.The meetings were attended by Principal Chief Electrical Engineer Shri Satish Kothari, DRMs of Prayagraj, Jhansi and Agra divisions along with other headquarter and divisional officers.







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit