For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (BZU)BETUL to (RPRD)RUPRA ROAD


Address: Betul Railway Station, Betul, Madhya Pradesh 460001, India

Station Code: BZU

Station Name: BETUL

Zone: CR/Central

Train Frequency Weekly: 227

Station Traffic: High

Address: Ulikupa - Saria Road, Odisha 766011, India

Station Code: RPRD

Station Name: RUPRA ROAD

Zone: ECoR/East Coast

Train Frequency Weekly: 135

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12808SAMTA EXPRESSBZU22:35NRLR12:0413:29M,TU,TH,F,SA2A,3A,SL,GN,12808 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
15-02-2023
Diversion and Rescheduling of trains due to Non- Interlocking work over South Central Railway



It is notified for the information of the general public that due to Non- Interlocking work o­n South Central Railway,the following trains shall remain temporarily cancelled/partially cancelled / rescheduled as under: -

Diversion of trains via Rayagada:

Sl. No

Tr. No

From – To

Effective fromJCO

Existing Route

Diverted Route

Stoppages Eliminated

1

20805

Visakhapatnam – New Delhi

15.02.2023 To 24.02.2023

Rajahmundry, Vijayawada, Balharshah, Nagpur, Gwalior

Vizianagaram, Rayagada, Titlagarh, Raipur, Nagpur

Anakapalli, Samalkot, Rajahmundry, Tadepalligudem, Eluru, Vijayawada, Khammam, Warangal, Peddapalli, Ramagundam, SirpurKaghaznagar, Balharshah, Chandrapur

2

20806

New Delhi – Visakhapatnam

15.02.2023 To 24.02.2023

Gwalior, Nagpur, Balharshah, Vijayawada, Rajahmundry

Nagpur, Raipur, Titlagarh, Rayagada, Vizianagaram

Chandrapur, Balharshah, SirpurKaghaznagar, Ramagundam, Peddapalli, Warangal, Khammam, Vijayawada, Eluru, Tadepalligudem, Rajahmundry, Samalkot, Anakapalli

Diversion oftrains viaPeddapalli – Nizamabad - Purna – Akola:

Sl. No

Tr. No

From – To

JCO

Existing Route

Diverted Route

Stoppages Eliminated

1

12791

Secunderabad-Danapur

15.02.23 To 24.02.23

Kazipet-Balharshah-Nagpur-Itarsi-Varanasi

Medchal-Nizamabad-Mudkhed-Adilabad-Majri

Kazipet, Peddapalli, Ramagundam, Mancherial, Bellampalli, SirpurKaghaznagar, Balharshah, Chandrapur

2

12792

Danapur-Secunderabad

15.02.23 To 23.02.23

Varanasi-Itarsi-Nagpur-Balharshah-Kazipet

Majri-Adilabad-Mudkhed-Nizamabad-Medchal

Chandrapur, Balharshah, SirpurKaghaznagar, Bellampalli, Mancherial, Ramagundam, Peddapalli, Kazipet

3

00761

Renigunta-H Nizamuddin

16.02.23, 18.02.23, 19.02.23, 21.02.23 & 23.02.23

Dhone-Kurnool City-Kacheguda-Kazipet-Balharshah-Nagpur-Bhopal

Medchal-Nizamabad-Mudkhed-Adilabad-Majri

Balharshah

4

00762

H Nizamuddin-Renigunta

16.02.23, 18.02.23, 20.02.23, 21.02.23 & 23.02.23

Bhopal-Nagpur-Balharshah-Kazipet-Kacheguda-Kurnool City-Dhone

Majri-Adilabad-Mudkhed-Nizamabad-Medchal

Balharshah

5.

12612

Chennai Central-New Delhi

20.02.23

Balharshah-Nagpur-Itarsi-Bhopal

Majri-Adilabad-Mudkhed-Nizamabad-Peddapalli

Balharshah

6.

12511

Gorakhpur-Kochuveli

15.02.23

Gonda-Bhopal-Nagpur-Balharshah

Majri-Adilabad-Mudkhed-Nizamabad-Peddapalli

Chandrapur, Balharshah, SirpurKaghaznagar, Bellampalli, Mancherial, Ramagundam

Diversion oftrains via Vikarabad – ParliVaijnath – Ankai:

 

Sl. No

Tr. No

From – To

JCO

Existing Route

Diverted Route

Stoppages Eliminated

1.

12286

HazratNizamuddin-Secunderabad

20.02.23

Itarsi-Nagpur-Balharshah

Itarsi-Khandwa-Manmad-Ankai-Parbhani-ParliVaijnath-Vikarabad

Balharshah

 

Diversion oftrainsvia Wadi:

 

Sl. No

Tr. No

From – To

JCO

Existing Route

Diverted Route

Stoppages Eliminated

1

12649

Yesvantpur-H.Nizamuddin

15.02.23, 17.02.23, 18.02.23, 19.02.23, 20.02.23, 22.02.23& 24.02.23

Ballari-Kacheguda-Balharshah-Nagpur

Guntakal-Wadi-Daund-Manmad-Khandwa-Itarsi

Kurnool City, Kacheguda,

Balharshah, Nagpur

2

12650

H.Nizamuddin-Yesvantpur

16.02.23, 18.02.23, 19.02.23, 20.02.23, 21.02.23 & 23.02.23

Nagpur-Balharshah-Kacheguda-Ballari

Itarsi-Khandwa-Manmad-Daund-Wadi-Guntakal

Nagpur, Balharshah, Kacheguda, Kurnool City

3

22534

Yesvantpur-Gorakhpur

15.02.23 & 22.02.23

Dharmavaram-Sulehalli-Balharshah-Nagpur-Itarsi

Dharmavaram-Wadi-Daund-Manmad-Khandwa-Itarsi

Secunderabad, Kazipet, SirpurKaghaznagar, Balharshah, Chandrapur, Nagpur

4

2
0103-01-2023
Bhubaneswar
ECoR ALL SET TO ACHIEVE RECORD PERFORMANCE IN THE FIELD OF LOADING AND INFRASTRUCTURE DEVELOPMENT



❶ Aims to surpass the last year loading 232.13 Million Tonne with a better margin.


❷ Loaded 175.32MT of freight up to December 2022 of current fiscal as against 169.39MT loaded in the corresponding period of last fiscal by registering a growth of 3.5%, i.e., 5.93 MT more.

 

❸ Hon’ble Minister of Railways Shri Ashwini Vaishnaw is monitoring the works of the zone o­n a regular basis. New Infrastructure in form of New Lines, Doubling & 3rd Lines are coming up at full pace.

 

❹ Tender awarded and work started for three World Class Stations along with upgradation of 36 Stations.

 

 

 

Despite many odds and different challenges, East Coast Railway (ECoR) is going to set new heights in the field of revenue loading and constructing new lines, doubling projects & traffic facility works along with Safety related works and other infrastructural works. This would be possible due to consistent monitoring by Railway Minister Shri Ashwini Vaishnaw Ji and guidance by General Manager Shri Roop Narayan Sunkar Ji.

 


          ECoR has loaded 175.32MT of freight up to December’2022 of the current financial year as against 169.39MT during the corresponding period of last fiscal which is 5.93 MT more and a growth of about 3.5%. In terms of Earnings from freight, ECoR has earned 14247.88 Crores during the period as against 13134.98 Crores by registering a growth of Rupees 1112.9 Crores than the last fiscal by registering an increase of 8.47%.

 

 

On the Passenger front, ECoR has carried 53.11 million passengers up to December’2022 as against 21.37 millions carried in the corresponding period of last fiscal by registering a growth of 148.5%. o­n earning from Passengers, ECoR has earned 1403.58 Crores as against 770.45 Crores by registering an increase of 82.17%.

 

 

This could be possible due to outstanding performance of all the three Divisions of East Coast Railway, i.e. Khurda Road, Waltair and Sambalpur. Relentless Round the Clock Close Monitoring & Outstanding supervision, dedicated and sincere work force brought this performance, to make this achievement a reality.

 

 

Apart from the above, East Coast Railway aims to complete remarkable infrastructural works. Vital traffic related works like, Doubling of entire Sambalpur-Titilagarh Railway Section, Angul-Talcher Road section (12 Kms.), Angul-Balram (14KMs) Link Inner Coal Corridor Connectivity Project,  3rd & 4th line between Salagaon-Rajathgarh, Doubling between Salagaon-Kapilas Road,  doubling of Jakhapura-Nayagarh except 3 block section, Third Lin between Kapilas Road & Nergundi, 3rd line between Budhapank-NTPC block cabin & 4th line between Budhapank-Talcher Road, 3rd line between Titilagarh-Kesinga and doubling between Sikir-Titilagarh along with yard remodelling, double line of 21 KMs  between Kaklur-Kawargaon-Dabpal, 3rd line between Rupra Road-Norla Road-Lanjigarh Road along with electrification, Doubling between Dummuriput-Damanjodi Section in Koraput-Rayagada branch line have been completed and commissioned during this year.

 

 

Giving priority to the much awaited Khurda Road-Balangir Railway Line project, construction works are being done from both sides to complete this at the earliest. 10.65Kms Bichupali-Jharatarbha of Khurda Road-Balangir project has been completed, recently. 11.40Kms between Khambeswarpalli-Jharatarbha is targeted to be completed by March’2023. Apart from this, 15.445 KMs between Nuagaon-Daspalla has been scheduled to be completed by February’2023 from Khurda Road side. Hon’ble Minister of Railways Shri Ashwini Vaishnaw is giving priority for the Development of Railway Infrastructure of the region and also monitoring the developmental works regularly.

 





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit