For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








10 Trains from (BWR)BARWA SAGAR to (HPP)HARPALPUR


Address: Barwa Sagar Railway Station, Barwa Sagar, Madhya Pradesh 284201, India

Station Code: BWR

Station Name: BARWA SAGAR

Zone: NCR/North Central

Train Frequency Weekly: 67

Station Traffic: Medium

Address: Harpalpur, Uttar Pradesh, India

Station Code: HPP

Station Name: HARPALPUR

Zone: NCR/North Central

Train Frequency Weekly: 111

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
22129TULSI EXPRESSNEW01:02HPP01:580:56TU,SU2A,3A,SL,GN,22129 Status
51821JHS KURJ LINK PASSBWR07:39BTX09:261:47M,TU,W,TH,F,SA,SUUNRESERVED51821 Status
54159JHS ALD PASSBWR07:39BTX09:211:42M,TU,W,TH,F,SA,SUUNRESERVED54159 Status
12176CHAMBAL EXPRESSBWR09:27HPP10:351:08TU,TH,SA2A,3A,SL,GN,12176 Status
12178CHAMBAL EXPRESSBWR09:27HPP10:351:08M2A,3A,SL,GN,12178 Status
51807JHS BNDA PASSBWR12:57BTX14:411:44M,TU,W,TH,F,SA,SUUNRESERVED51807 Status
19666UDZ KURJ EXPNEW16:01HPP17:021:01M,TU,W,TH,F,SA,SU1A,2A,3A,SL,2S,GN,19666 Status
51805JHS MKP PASSBWR17:52BTX19:311:39M,TU,W,TH,F,SA,SUUNRESERVED51805 Status
11107BUNDELKHAND EXPBWR22:51BTX00:261:35M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11107 Status
12190MAHAKOSHAL EXPNEW23:47BTX01:101:23M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12190 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
24-05-2023
Press Release: ADDITIONAL STOPPAGE OF CHAMBAL EXPRESS AT BARWA SAGAR STATION


ADDITIONAL STOPPAGE OF CHAMBAL EXPRESS AT BARWA SAGAR STATION


Kolkata, May 20, 2023


Railway has decided to provide stoppage of 12177/12178 Howrah - Mathura - Howrah Chambal Express at Barwa Sagar station over North Central Railway o­n an experimental basis.


12177 Howrah - Mathura Chambal Express (journey commencing o­n & from 26.05 2023) and 12178 Mathura - Howrah Chambal Express (journey commencing o­n & from 22.05.2023) will arrive Barwa Sagar station at 14:02 hrs and 09:36 hrs respectively. The train will stop at Barwa Sagar station for two(02) minutes in both directions.




2
02-04-2022
North Central Railway carried out electrification of 439 Route Kilometers in 2021-22

North Central Railway carried out electrification of 439 Route Kilometers in 2021-22
652 track kilometers electrification completed by NCR
42 pairs of mail/express trains taken over from Diesel to Electric traction during 2021-22
7 new Traction substations commissioned during 2021-22
In pursuance of Mission 100% electrification, North Central Railway is carrying out electrification of its all routes and of the missing links o­n war footage. Financial Year 2021-22 proved to be an year of achievements for NCR where massive electrification works got completed in the Zone. 
NCR total Broad Gauge network stands at 3222 Route kilometers(RKM), out of which now 3146 kilometers have been electrified. Thus 98% of the total broad gauge network of NCR has been electrified now. The work for remaining 76kilometers is in advanced stage and is targeted to be completed shortly.
In 2021-22, electrification of following routes was completed:

Mahoba- Khajuraho of Jhansi Division (64 RKM)
Khajuraho-Ishanagar of Jhansi Division (57 RKM)
Birlanagar- Udimore of Jhansi Division (101 RKM)
Mainpuri- Shikohabad of Prayagraj Division (51 RKM)
Mainpuri-Farrukhabad, along with Etawah-Mainpuri, Prayagraj Division (107 RKM)
Barhan-Etah of Prayagraj Division (59 RKM)

With these electrification works, Railway network spanning through the parts of districts of Etah, Mainpuri, Farrukhabad, Etawah, Firozabad and Agra of Uttar Pradesh and those of Gwalior, Bhind, Tikamgarh and Chhatarpur of Madhya Pradesh will now be served through electrified territories.
The significance of these massive electrification works lie in the fact that it will reduce the bottleneck of change of traction when a train coming from Electric locomotive arrives in a non-electrified territory. Since the requirement of changing of traction is done away with, it increases mobility and thereby is a leap ahead in improving the punctuality of trains. In Financial Year 2021-22, 42 pairs of mail/express trains running through NCR were taken over from diesel to electric traction after completion of major electrification works in NCR and different sections of other zones. Three more pairs of trains will be taken over o­n Electric Traction after issue of CRS sanction of Etah-Barhan section, Commissioner of Railway Safety (CRS) inspection of which has already been carried out. 
Principal Chief Electrical Engineer NCR Shri Satish Kothari informs that in addition to the electrification of these major routes, all the new doubling or tripling works are being opened along with electrification.  Newly laid Jhansi- Babina third line (Jhansi Division), Bhuteshwar-Chhata fourth line (Agra Division), Dholpur-Bhandai third line (Agra Division) and sections opened in Kanpur-Virangana Lakshmibai section (Jhansi Division) are fully electrified. Massive electrification of existing sidings has also been done in 2021-22. As a result of all these, NCR successfully carried out 652 Track kilometers of electrification in the financial year. 
Giving impetus to the power supply installations, 7 new Traction substations were commissioned in 2021-22 namely Chunar, Saifai and Bhongaon (Prayagraj Division); Newari and Harpalpur (Jhansi Division) and Ghosrana and Bhandai of Agra Division.
General Manager NCR Shri Pramod Kumar who conducted numerous inspections in field and called a series of meeting of all the stake holders to get these electrification works completed well in time says that not o­nly punctuality of trains will increase but time taken in placements and removals of goods trains in sidings will alsocome down. “Electrification will also bring environmental benefits along with the improvement in mobility”, says Shri Pramod Kumar.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit