For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








17 Trains from (BRPL)BARPALI to (RPRD)RUPRA ROAD


Address: Barpali Railway Station, Barpali, Odisha 768029, India

Station Code: BRPL

Station Name: BARPALI

Zone: ECoR/East Coast

Train Frequency Weekly: 145

Station Traffic: Medium

Address: Ulikupa - Saria Road, Odisha 766011, India

Station Code: RPRD

Station Name: RUPRA ROAD

Zone: ECoR/East Coast

Train Frequency Weekly: 135

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
18637HTE BNC EXPBRGA00:17KSNG03:102:53SA2A,3A,SL,GN,18637 Status
18111TATA YPR EXPBRGA00:17KSNG03:102:53TH2A,3A,SL,GN,18111 Status
13576JSME TBM EXPBRGA00:17KSNG03:102:53W2A,3A,SL,GN,13576 Status
22837DHARTI AABA EXPBRGA00:17KSNG03:102:53M2A,3A,GN,22837 Status
12889TATA YPR EXPBRGA00:17KSNG03:102:53F2A,3A,SL,GN,12889 Status
12376ASN MAS EXPRESSBRGA00:17KSNG03:102:53W2A,3A,SL,GN,12376 Status
12835HTE YPR EXPRESSBRGA00:20KSNG03:032:43TU,SU2A,3A,SL,GN,12835 Status
18452TAPASWINI EXPREBRGA06:45RPRD10:103:25M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18452 Status
18301SBP RGDA EXPRESSBRGA06:55RPRD10:103:15M,TU,W,TH,F,SA,SUCC,2S,GN,18301 Status
58301SBP KRPU PASSDJX08:17RPRD12:103:53M,TU,W,TH,F,SA,SUUNRESERVED58301 Status
58303SBP JNRD PASSDJX08:45RPRD12:103:25M,TU,W,TH,F,SA,SUUNRESERVED58303 Status
18005HWH SBP JDB EXPBRGA09:55RPRD12:532:58M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18005 Status
08301SBP BAND SPLBRGA10:12KSNG12:582:46W2A,3A,SL,GN,08301 Status
20809NAGAVALI EXPRESSBRGA11:52KSNG14:182:26M,F,SU2A,3A,SL,GN,20809 Status
18107ROU JDB EXPRESSBRGA21:28KSNG00:182:50M,TU,W,TH,F,SA,SU3A,SL,GN,18107 Status
18189TATA ALLP EXPBRGA22:47RPRD02:063:19M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18189 Status
13351DHN ALAPPUZHA EBRGA22:50RPRD02:153:25M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13351 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
0213-01-2023
Bhubaneswar
IMMEDIATE ACTION BY RAILWAYS


Passenger received his left behind bag after grievance lodged in Rail Madad portal.


Railways took immediate action o­n a complaint regarding left behind bag through Rail Madad portal.

A passenger named Bimal Kumar Bidyadhar travelling in Sambalpur-Rayagada Inter City Express from Barpali to Kesinga, today, lodged a complaint in Rail Madad about his left behind bag.

Railways took immediate action and assured Shri Bidyadhar that all efforts will be taken to recover the left behind bag. RPF officials at Muniguda and Sambalpur were informed. Later, RPF Team at Muniguda retrieved the left behind bag and handed over to the complainant with proper verification.

The passenger after getting his bag appreciated about the quick response of the Rail Ministry and extended thanks to Railway Minister Shri Ashwini Vaishnaw for developing such a system for the benefit of the passengers.





2
0103-01-2023
Bhubaneswar
ECoR ALL SET TO ACHIEVE RECORD PERFORMANCE IN THE FIELD OF LOADING AND INFRASTRUCTURE DEVELOPMENT



❶ Aims to surpass the last year loading 232.13 Million Tonne with a better margin.


❷ Loaded 175.32MT of freight up to December 2022 of current fiscal as against 169.39MT loaded in the corresponding period of last fiscal by registering a growth of 3.5%, i.e., 5.93 MT more.

 

❸ Hon’ble Minister of Railways Shri Ashwini Vaishnaw is monitoring the works of the zone o­n a regular basis. New Infrastructure in form of New Lines, Doubling & 3rd Lines are coming up at full pace.

 

❹ Tender awarded and work started for three World Class Stations along with upgradation of 36 Stations.

 

 

 

Despite many odds and different challenges, East Coast Railway (ECoR) is going to set new heights in the field of revenue loading and constructing new lines, doubling projects & traffic facility works along with Safety related works and other infrastructural works. This would be possible due to consistent monitoring by Railway Minister Shri Ashwini Vaishnaw Ji and guidance by General Manager Shri Roop Narayan Sunkar Ji.

 


          ECoR has loaded 175.32MT of freight up to December’2022 of the current financial year as against 169.39MT during the corresponding period of last fiscal which is 5.93 MT more and a growth of about 3.5%. In terms of Earnings from freight, ECoR has earned 14247.88 Crores during the period as against 13134.98 Crores by registering a growth of Rupees 1112.9 Crores than the last fiscal by registering an increase of 8.47%.

 

 

On the Passenger front, ECoR has carried 53.11 million passengers up to December’2022 as against 21.37 millions carried in the corresponding period of last fiscal by registering a growth of 148.5%. o­n earning from Passengers, ECoR has earned 1403.58 Crores as against 770.45 Crores by registering an increase of 82.17%.

 

 

This could be possible due to outstanding performance of all the three Divisions of East Coast Railway, i.e. Khurda Road, Waltair and Sambalpur. Relentless Round the Clock Close Monitoring & Outstanding supervision, dedicated and sincere work force brought this performance, to make this achievement a reality.

 

 

Apart from the above, East Coast Railway aims to complete remarkable infrastructural works. Vital traffic related works like, Doubling of entire Sambalpur-Titilagarh Railway Section, Angul-Talcher Road section (12 Kms.), Angul-Balram (14KMs) Link Inner Coal Corridor Connectivity Project,  3rd & 4th line between Salagaon-Rajathgarh, Doubling between Salagaon-Kapilas Road,  doubling of Jakhapura-Nayagarh except 3 block section, Third Lin between Kapilas Road & Nergundi, 3rd line between Budhapank-NTPC block cabin & 4th line between Budhapank-Talcher Road, 3rd line between Titilagarh-Kesinga and doubling between Sikir-Titilagarh along with yard remodelling, double line of 21 KMs  between Kaklur-Kawargaon-Dabpal, 3rd line between Rupra Road-Norla Road-Lanjigarh Road along with electrification, Doubling between Dummuriput-Damanjodi Section in Koraput-Rayagada branch line have been completed and commissioned during this year.

 

 

Giving priority to the much awaited Khurda Road-Balangir Railway Line project, construction works are being done from both sides to complete this at the earliest. 10.65Kms Bichupali-Jharatarbha of Khurda Road-Balangir project has been completed, recently. 11.40Kms between Khambeswarpalli-Jharatarbha is targeted to be completed by March’2023. Apart from this, 15.445 KMs between Nuagaon-Daspalla has been scheduled to be completed by February’2023 from Khurda Road side. Hon’ble Minister of Railways Shri Ashwini Vaishnaw is giving priority for the Development of Railway Infrastructure of the region and also monitoring the developmental works regularly.

 





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit