For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








9 Trains from (BNT)BHARTHANA to (JJK)JHINJHAK


Address: Bharthana Railway Station, Bharthana, Uttar Pradesh 206242, India

Station Code: BNT

Station Name: BHARTHANA

Zone: NCR/North Central

Train Frequency Weekly: 137

Station Traffic: Medium

Address: Uttar Pradesh 209302, India

Station Code: JJK

Station Name: JHINJHAK

Zone: NCR/North Central

Train Frequency Weekly: 139

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
14218UNCHAHAR EXPBNT03:10RURA04:211:11M,TU,W,TH,F,SA,SU2A,3A,SL,GN,14218 Status
12180LJN INTERCITYBNT08:11RURA09:100:59M,TU,W,TH,F,SA,SUCC,2S,GN,12180 Status
64588TDL CNB DEMUBNT09:19RURA11:081:49M,TU,W,TH,F,SA,SUUNRESERVED64588 Status
18102JAT MURI TATA EXPRESSBNT10:19RURA11:251:06M,TU,W,TH,F,SA,SUUNRESERVED18102 Status
18310JAT SBP EXPBNT10:19RURA11:251:06M,TU,W,TH,F,SA,SU3A,SL,GN,18310 Status
15484MAHANANDA EXPBNT12:49RURA14:001:11M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15484 Status
13008U A TOOFAN EXPBNT16:04RURA17:271:23M,TU,W,TH,F,SA,SU3A,SL,GN,13008 Status
64156ETW CNB MEMUBNT16:45RURA18:151:30M,TU,W,TH,F,SA,SUUNRESERVED64156 Status
12420GOMTI EXPRESSETW17:29RURA18:431:14M,TU,W,TH,F,SA,SU1A,2A,CC,2S,GN,12420 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
17-03-2023
Change in timings of the trains

New Delhi

Date 17.03.2023

 

Change in timings of the trains

It is notified for the information of the general public that due to operational reasons, the timings of the following trains at the following station shall be revised as under:

Timings of train 14163 PRAYAGRAJ JN. – MEERUT CITY SANGAM EXPRESS FROM JCO-19/03/2023

Station

Existing Timings

Revised Timings

(w.e.f-JCO-19.03.2023)

 

0355-0405

04.21-04.23

04.38-04.43

05.37-05.47

Arrival. 06.25

 

0350-0355

04.11-04.13

04.28-04.33

05.27-05.37

Arrival.06.25

KHURJA

KHURJA CITY

BULANDSHAR

HAPUR

MEERUT CITY

 

  1. Timings of train 22432 UDHAMPUR – SUBEDARGANJ EXPRESS FROM. JCO- 19/03/2023

Station

Existing

Revised (w.e.f-JCO-19.03.2023)

 

03.40-03.45

04.15-04.20

05.15-05.20

Pass 05.40

0605-0610

0642-0644

0735-0737

0838-0840

1015-1020

1110-1112

Arrival. 1255

 

03.25-03.30

04.00-04.05

05.05-05.10

Pass 05.30

0550-0555

0623-0625

0720-0722

0820-0822

0955-1000

1058-1100

Arrival. 1250

MEERUT CITY

HAPUR

BULANDSHAR

KHURJA CITY

KHURJA

ALIGARH JN.

TUNDLA

ETAWAH

KANPUR CENTRAL

FATEHPUR

SUBEDARGANJ

 

  1. Timings of train 12180 Agra Fort – Lucknow Intercity Express from.-JCO- 20/03/2023

 

 

 

 

Station

Existing Timings

Revised Timings

(w.e.f,JCO-20.03.2023)

 

0728-0729

0743-0744

0815-0816

0831-0832

0854-0855

0919-0920

0934-0935

0959-1000

 

No change

No change

0828-0830

0845-0846

0907-0908

0923-0924

0937-0938

No change

FIROZABAD

SHIKOHABAD

ETAWAH

BHARTHANA

PHAPHUND

JHIJHAK

RURA

PANKI DHAM

 

………





2
06-04-2022
Massive investment in technology upgradation to improve safety in train operations: 2021-22, an year of achievements

108 km of automatic signalling commissioned over NCR: highest in Indian Railways

37 Electronic Interlocking commissioned

Entire Broad Gauge network of NCR is now provided with Optical Fibre Cable

Year 2021-22 closed with significant achievements for North Central Railway in the field of upgrading signalling and telecommunication infrastructure. Through a total investment of about 317 crores in 2021-22, NCR stood first among all the zonal Railways in investing for technological upgradation. NCR completes major works like completion of 108 km of automatic signalling. This is about half of the automatic signalling commissioned all over Indian Railways (218 km). It includes 74 km of new commissioning and 34 km of replacement of old signalling. In addition to it, 37 new Electronic Interlocking (EI) were commissioned at different stations which is highest ever El commissioned in a single year and is about 9% of the total 421 EIs commissioned over Indian Railways. This includes an important feat of elimination of mechanical signalling by EI at 14 stations thereby improving safety aspects to manifold.

Improving safety in operations further, 10 Level crossings in NCR were interlocked during 2021-22. With this, total 395 LC gates have been interlocked over NCR. Another important milestone achieved was provision of Electric gates (technically called as Power operated lifting barrier) at 17 erstwhile mechanical gates.

Making strides towards passenger amenities and convenience, a total of 121.3 km of Optical Fibre Cable was commissioned during the year. With this all the Broad Gauge network of NCR has now been provided with OFC. This brings a significant improvement in communication system.

14 stations were provided with Wi-Fi connectivity thus a total of 296 stations of NCR are now Wi-Fi enabled.

In addition, Train Display board was commissioned at 7 stations: Jhinjhak, Shikohabad, Tundla, Datia, Orai, Jhansi and Banda. A total of 37 stations of NCR are now equipped with Train Display Board. 6 more stations were provided with coach display boards in 2021-22.

About automatic signalling system: There are two major types of signalling system used in Railways. First is absolute block system, in which there is o­ne train in between two stations at a time, and second train is permitted to enter o­nly when first train clears the block section. The portion between two stations is called as block section. An advancement of this system is provision of Intermediate Block Station (IBS), wherein the section is splitted into two subsections by providing an intermediate signal and thus two trains can be accommodated between two stations. Second type of signalling system is automatic signalling. In this system, signals are provided continuously after around 1-1.5 kilometers and there can be o­ne train in between two signals. Thus practically there may be many trains in between two stations, depending upon the number of automatic signals provided. Automatic signalling increases the line capacity to a great extent as more trains can be run within the same route using the existing track. It is used in busy sections of Indian Railways.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit