For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (BNG)Barnagar to (dba)dabra


Address: State Highway 18, Barnagar Madhya Pradesh

Station Code: BNG

Station Name: Barnagar

Zone: WR/Western

Train Frequency Weekly: 81

Station Traffic: Medium

Address: Dabra, Madhya Pradesh 475110, India

Station Code: DBA

Station Name: DABRA

Zone: NCR/North Central

Train Frequency Weekly: 233

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
21802RTM JHS LINK EXBNG17:54DBA08:5515:01M,W,TH,SU3A,SL,GN,21802 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
16-12-2022
Press Release:REGULATION OF TRAINS IN BHAGALPUR-JAMALPUR SECTION FOR CONSTRUCTION OF FOOT OVER BRIDGE

REGULATION OF TRAINS IN BHAGALPUR-JAMALPUR SECTION FOR CONSTRUCTION OF FOOT OVER BRIDGE 

Kolkata, December 14, 2022:
For construction of foot over bridge, traffic and power block has been planned o­n Up line for 370 minutes and over Down line for 300 minutes at Mahesi Halt in between Akbarnagar & Sahibganj stations of Bhagalpur-Jamalpur section o­n 18.12.2022 (Sunday). Various developmental works will also be carried o­n at Bariarpur and Jamalpur with Shadow Block within this period. Consequently, the following arrangements have been made as under :
Cancellation of Trains

Express: 
13419/13420 Bhagalpur-Muzaffarpur-Bhagalpur Express (journey commencing o­n 18.12.2022)

Passenger:
(i)03406/03405 Jamalpur-Bhagalpur-Jamalpur Special, 05407 Rampurhat-Gaya Special, 05408 Jamalpur-Rampurhat Special & 03433/03434 Jamalpur-Kiul-Jamalpur MEMU (all journey commencing o­n 18.12.2022) will remain cancelled.
(ii)05404 Gaya-Jamalpur Special & 05405 Rampurhat-Sahibganj Special (journey commencing o­n 19.12.2022) will remain cancelled.

Short termination/ Short origination of Trains
03431/03432 Sahibganj-Jamalpur-Sahibganj MEMU (journey commencing o­n 18.12.2022) will be short terminated at/ short originated from Sabaur.
13409/13410 Malda Town-Kiul Express (journey commencing o­n 18.12.2022) will be short terminated at/ short originated from Bhagalpur.

Diversion
13424 Ajmer-Bhagalpur Express (journey commencing o­n 17.12.2022) will be diverted via Kiul-Jasidih-Banka.

Moreover, 13024 Gaya-Howrah Express and 05415 Sahibganj-Jamalpur Passenger will be controlled by 20 minutes and 40 minutes respectively in between Sahibganj & Bhagalpur.
Inconvenience to be caused to the passengers is deeply regretted.




2
10-10-2022
General Manager NCR holds safety, punctuality and performance review meeting

As the first half of financial year ends, NCR registers 12.24% growth in originating freight loading

In the month of September 2022, NCR registered freight loading of 1.63 million tonnes which is an improvement of 2.52% over same period last year.

NCR earned Rs. 1011.25 Croresof revenue through originating freight loading in the first half of 2022-23

As compared to the previous year, +13.40%growth in originating freight revenue registered

Parcel traffic shows an increase of 42.88%

“Need to sustain the momentum throughout the financial year”: GM NCR

Today General Manager NCR conducted the weekly safety and punctuality meeting today at NCR Headquarter. The meeting was attended by all the PHODs at the NCR headquarter office while DRMs/ADRMs along with senior divisional officers joined through video conference.

During the meeting it was informed that, as the first half of economy ends, North Central Railway (NCR) registered 12.24% growth in originating freight loading. NCR loaded 9.90 million tonnes of cargo during April-September 2022 surpassing previous year loading. Freight loading of 8.82 million tonnes was achieved in the corresponding period of previous year.

1.63 MT of loading was achieved in the month of September 2022 which is an improvement of 2.52% over same period last year . Originating freight revenue during these six months comes to be Rs 1011.25 crores, which is 13.40 % more than the originating freight earning of 891.72 crores in the first six months of previous financial year.

NCR, which spans through the states of UP, MP, Rajasthan and Haryana, is an important constituent of Indian Railways and contributes in loading of containers from Dadri, Kanpur, Agra and Malanpur; fertilizers from Panki near Kanpur; cement from Parichha (near Jhansi) and Chunar; Petroleum Oil Lubricants from BAD refinery Mathura, HPTR near Kanpur and BPCL Panki; foodgrain loading from various places like Etah, Kanpur, Sonbhadra, Mirzapur, Prayagraj, Fatehpur, Shankargarh and Lalitpur of Uttar Pradesh and Tikamgarh, Datia, Dabra and Newari of Madhya Pradesh among other locations.

All the commodities have shown a surge in the loading except cement & fertilizers which registers a slight dip as compared to the previous year.

In addition to it, parcel traffic also registers a significant surge as compared to the previous year. Rs 15.66 crores of total parcel earnings have been achieved by NCR during the first half of the year against earnings of Rs. 10.96 crore for same period last year, which is a growth of 42.88%.

While analysing the loading figures of the zone, General Manager Shri Pramod Kumar congratulated the officers for the overall loading performance but expressed concerns over the dip in cement & fertilizer loading. He instructed the officers to put all efforts to pull these two commodities and sustain the momentum throughout the remaining year so that the target set by the Railway Board could be surpassed. GM instructed the DRMs of the three divisions and concerned officers of headquarter to conduct regular freight customer meets and facilitate merchants to use Railway as a preferred mode of transport. “Achievements are laudable, but we have to work harder to sustain the momentum and surpass the targets set by the Railway Board”, said the GM.   






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit