For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (BAU)BURHANPUR to (TLY)THALASSERY


Address: Lalbagh, Burhanpur, Madhya Pradesh 450331, India

Station Code: BAU

Station Name: BURHANPUR

Zone: CR/Central

Train Frequency Weekly: 236

Station Traffic: High

Address: Thalassery Railway Station, Thalassery, Kerala 670101, India

Station Code: TLY

Station Name: THALASSERY

Zone: SR/Southern

Train Frequency Weekly: 277

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12618MNGLA LKSDP EXPBAU01:02TLY05:2828:26M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12618 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
Press Release No. 5227-04-2023
Hubballi
Press Release No. 52, SUMMER SPECIAL TRAINS BETWEEN ARSIKERE AND KANNUR

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 52 Dt: 27.04.2023

SUMMER SPECIAL TRAINS BETWEEN ARSIKERE AND KANNUR

Train Nos. 06205/06206 between Arsikere and Kannur Summer Special will be run o­n demand to clear the extra rush of passengers during summer holidays, as per details mentioned below: -

The Arsikere-Kannur Summer Special Express (06205), will leave Arsikere at 12:15 PM o­n April 28, 2023, and arrive at Kannur at 5:15 AM the next day.

The special train (06205) will arrive / depart enroute stations at Tumakuru – 12:58/01:00 PM, Chikbanavar – 01:38/01:40 PM, Sir M. Visvesvaraya Terminal Bengaluru – 03:35/03:45 PM, Krishnarajapuram – 04:03/04:05 PM, Bangarapet – 04:47/04:48 PM, Salem – 07:47/07:50 PM, Erode – 08:40/08:50 PM, Tiruppur – 09:33/09:35 PM, Coimbatore – 10:37/10:40 PM, Palakkad – 11:42/11:45 PM, Shoranur – 12:20/12:30 AM, Tirur – 01:15/01:17 AM, Kozhikkode – 02:05/02:10 AM, Vadakara – 03:00/03:02 AM and Thalassery – 03:45/03:47 AM.

In the return direction, Train No. 06206 will depart from Kannur at 8 AM o­n April 29, 2023 and arrive at Arsikere at 3 AM o­n the next day.

This train (06206) will arrive / depart enroute stations atThalassery – 08:25/08:27 AM, Vadakara – 08:50/08:52 AM, Kozhikkode – 09:50/09:55 AM, Tirur – 10:35/10:37 AM, Shoranur – 11:30/11:40 AM, Palakkad – 12:15/12:20 PM, Coimbatore – 01:50/01:55 PM, Tiruppur – 02:40/02:42 PM, Erode – 03:35/03:45 PM, Salem – 04:45/04:48 PM, Bangarapet – 07:53/07:55 PM, Krishnarajapuram – 08:53/08:55 PM, Sir M. Visvesvaraya Terminal Bengaluru – 09:05/09:15 PM, Chikbanavar – 10:20/10:22 PM and Tumakuru – 11:00/11:02 PM.

The special trains will consist of fourteen coaches, including o­ne AC Two tier coach, o­ne AC Three-tier coach, six second-class sleeper coaches, four general second-class coaches, and two second-class cum luggage & brake vans/disabled-friendly compartments.

                                                                                                                         Aneesh Hegde
                                                                         Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit