For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








7 Trains from (AUB)ALUABARI ROAD to (SVQ)Sivok


Address: Islampur, West Bengal 733202, India

Station Code: AUB

Station Name: ALUABARI ROAD

Zone: NFR/Northeast Frontier

Train Frequency Weekly: 185

Station Traffic: High

Address: National Highway 31, Sevoke Bazar, Sevoke , Dist - Darjeeling West Bengal

Station Code: SVQ

Station Name: Sivok

Zone: NFR/Northeast Frontier

Train Frequency Weekly: 59

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
13149KANCHANKANYA EXPAUB06:12SGUJ08:051:53M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13149 Status
15719INTERCITYTKG09:25SGUJ11:151:50M,TU,W,TH,F,SA,SU2S,GN,15719 Status
75707RDP NJP DEMUTKG11:00SGUJ12:451:45M,TU,W,TH,F,SA,SUUNRESERVED75707 Status
15484MAHANANDA EXPAUB12:36SGUJ15:102:34M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15484 Status
75719MLFC SGUJ DMUTKG14:15SGUJ16:001:45M,TU,W,TH,F,SA,SUUNRESERVED75719 Status
15463BLGT NJP INTERCITYTKG17:42SGUJ19:151:33M,TU,W,TH,F,SA,SUUNRESERVED15463 Status
75743KIR SGUJ PASSTKG22:23SGUJ00:101:47M,TU,W,TH,F,SA,SUUNRESERVED75743 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
14219-05-2023
Maligaon
Completion of concrete lining in Tunnel No – 14 achieved, Another milestone in the prestigious Sivok – Rangpo Rail Project

Tunnelno.T-14of the Sivok - RangpoRailProject(SRRP) has achieved another milestone by completing the final Concrete lining o­n 15th May, 2023.Last year, the milestone of breakthrough of this tunnel was achieved and completion of final concrete lining is a marvellous achievement by the Engineers involved in this project.

In March 2023, the Hon’ble Minister of Railways, Communications, Electronics and Information Technology Shri Ashwini Vaishnaw also inspected this tunnel and appreciated the work. Finally, the auspicious occasion of completion of final concrete lining is marked as a significant event in the history of this project.

This tunnel is the gateway of railway network to the State of Sikkim. The tunnel is about 1977 m long and is situated in the Rangpo Sub-Division of District Pakyong, Sikkim. This tunnel has achieved the credit of being the first in completion of final concrete lining out of 14 tunnels of the Project. The tunnel is located in between Kumrek and Khanikhola in East Sikkim region and traverses through challenging geological conditions of the Lesser Himalaya. New Austrian Tunnelling Method (NATM) has been adopted for the completion of tunnel through challenging and vulnerable groundmass with the supervisions of well experienced engineers from India along with highly experienced foreign engineers in this project. The track linking works will be next activity going to start through this tunnel very soon. Rangpo Station situated just after the Tunnel No. T-14 is also under construction and o­n completion will be a commercial and tourism hub for the State of Sikkim. This railway project will enhance the standard of socio-economic status of the state.

This New Rail Link Project from Sivok to Rangpo is about 45 kms long and is characterised by 14 nos. tunnels, 22 nos. bridges and 5 nos. stations including an underground station at Teesta Bazar, W.B. About 38 kms of the entire project alignment is passing through tunnels, about 76% of tunnelling work has already been completed. The mining work at 6 tunnels already completed and many are o­n the verge of completion of mining. The final concrete lining works at other tunnels have also started. At present all the activities related to construction of tunnels, bridges and stations o­n this project are in progress o­n war footing basis and targeted to complete by December, 2024. This is o­ne of theprestigiousongoingNationalprojectsinIndiaandoncompletionofthisproject,firsttimethe stateofSikkimwillbeconnectedvia railways.



(Sabyasachi De)
CPRO/N.F.Railway




2
13-04-2023
Press Release: EASTERN RAILWAY TO RUN TWO SUMMER SPECIAL TRAINS FOR NEW JALPAIGURI

EASTERN RAILWAY TO RUN TWO SUMMER SPECIAL TRAINS FOR NEW JALPAIGURI

Kolkata, April 12, 2023:

For the convenience of the passengers and to clear the extra rush during summer season, Eastern Railway has decided to run two (2) Summer Special Trains between Howrah & New Jalpaiguri and Sealdah & New Jalpaiguri.

03027 Howrah – New Jalpaiguri Summer Special will leave Howrah at 23:40 hrs o­n every Wednesday between 19.04.2023 & 28.06.2023 (11 trips) to reach New Jalpaiguri at 10:45 hrs o­n the next day. 03028 New Jalpaiguri – Howrah Summer Special will leave New Jalpaiguri at 12:15 hrs o­n every Thursday between 20.04.2023 & 29.06.2023 (11 trips) to reach Howrah at 23:30 hrs o­n the same day. The train will stop at Bandel, Katwa, Azimganj, Jangipur Road, Malda Town, Barsoi, Kishanganj & Aluabari Road stations in both directions enroute. The train will have General Second Class, Sleeper Class and Air-conditioned accommodation.

03103 Sealdah – New Jalpaiguri Summer Special will leave Sealdah at 23:40 hrs o­n every Saturday between 15.04.2023 & 24.06.2023 (11 trips) to reach New Jalpaiguri at 10:45 hrs o­n the next day. 03104 New Jalpaiguri – Sealdah Summer Special will leave New Jalpaiguri at 12:15 hrs o­n every Sunday between 16.04.2023 & 25.06.2023 (11 trips) to reach Sealdah at 23:50 hrs o­n the same day. The train will stop at Naihati, Bandel, Katwa, Azimganj, Jangipur Road, Malda Town, Barsoi, Kishanganj & Aluabari Road stations in both directions enroute. The train will have Air-conditioned accommodation.

The booking of Howrah – New Jalpaiguri Summer Special (03027), Sealdah – New Jalpaiguri Summer Special (03103) & Malda Town – Chhatrapati Shivaji Maharaj Terminus Summer Special (01032) will be available o­n and from 13.04.2023 through PRS & internet. In addition to Mail/Express fare, special charge will be realised. Concessional booking is not allowed. Tatkal quota is not available.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit