2 Trains from (AII)AJMER JN to (RRB)BIRUR JN
Address: Ajmer Junction, Ajmer, Rajasthan 305001, India
Station Code: AII
Station Name: AJMER JN
Zone: NWR/North Western
Train Frequency Weekly: 425
Station Traffic: High
Address: Birur, Karnataka 577116, India
Station Code: RRB
Station Name: BIRUR JN
Zone: SWR/South Western
Train Frequency Weekly: 289
Station Traffic: High
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.swr.indianrailways.gov.in- 2023-06-14
दकà¥à¤·à¤¿à¤£ पशà¥à¤šà¤¿à¤® रेलवे / SOUTH WESTERN RAILWAY I.CONTINUATION OF TEMPORARY STOPPAGE The oÂne-minute temporary halt for Train Nos. 16587/16588 Yesvantpur - Bikaner - Yesvantpur Bi-weekly Express at Birur station will continue for another six months, from June 28 to December 27, 2023, with the existing timings. II.AUGMENTATION OF BUFFET CAR Train No. 17321 Vasco-da-Gama-Jasidih Weekly Express will be augmented with oÂne A/C hot buffet car coach from June 23, 2023, and Train No. 17322 Jasidih-Vasco-da-Gama Weekly Express will also be augmented with oÂne A/C hot buffet car coach from June 26, 2023. III.AUGMENTATION OF 3-TIER ECONOMY SLEEPER COACH West Central Railway has notified for permanent augmentation of oÂne A/C 3-tier economy sleeper coach for Train No. 12194/12193 Jabalpur – Yesvantpur – Jabalpur Expresswith effect from the dates mentioned against each. 1.Train No. 12194 Jabalpur – Yesvantpur Weekly Express will be augmented with oÂne additional A/C 3-tier Economy Sleeper Coach with effect from October 14, 2023. 2.Train No. 12193 Yesvantpur – Jabalpur Weekly Express will be augmented with oÂne additional A/C 3-tier Economy Sleeper Coach with effect from October 15, 2023. I.ತಾತà³à²•à²¾à²²à²¿à²• ನಿಲà³à²—ಡೆ ಮà³à²‚ದà³à²µà²°à²¿à²•à³† ರೈಲೠಸಂಖà³à²¯à³† 16587/16588 ಯಶವಂತಪà³à²° ಮತà³à²¤à³ ಬಿಕಾನೇರೠನಿಲà³à²¦à²¾à²£à²—ಳ ನಡà³à²µà³† ಸಂಚರಿಸà³à²µ ಎಕà³à²¸à³â€Œà²ªà³à²°à³†à²¸à³â€Œ ರೈಲà³, ಬೀರೂರೠನಿಲà³à²¦à²¾à²£à²¦à²²à³à²²à²¿ ಒಂದೠನಿಮಿಷ ತಾತà³à²•à²¾à²²à²¿à²• ನಿಲà³à²—ಡೆಯನà³à²¨à³ ಜೂನೠ28 ರಿಂದ ಡಿಸೆಂಬರೠ27 ರವರೆಗೆ ತನà³à²¨ ಮೊದಲಿನ ವೇಳಾಪಟà³à²Ÿà²¿à²¯à²‚ತೆ ಮà³à²‚ದà³à²µà²°à²¿à²¸à²²à²¾à²—à³à²¤à³à²¤à²¿à²¦à³†. II.ಪà³à²¯à²¾à²‚ಟà³à²°à²¿ ಕಾರೠಜೋಡಣೆ ರೈಲೠಸಂಖà³à²¯à³† 17321/17322 ವಾಸà³à²•à³‹-ಡ-ಗಾಮಾ ಮತà³à²¤à³ ಜಸಿದಿಹೠನಿಲà³à²¦à²¾à²£à²—ಳ ನಡà³à²µà³† ಸಂಚರಿಸà³à²µ ಎಕà³à²¸à³â€Œà²ªà³à²°à³†à²¸à³ ರೈಲಿಗೆ ಜೂನೠ23 ರಂದೠವಾಸà³à²•à³‹-ಡ-ಗಾಮಾ ಮತà³à²¤à³ ಜೂನೠ26 ರಂದೠಜಸಿದಿಹà³â€Œ ನಿಲà³à²¦à²¾à²£à²—ಳಿಂದ ಒಂದೠಎಸಿ ಪà³à²¯à²¾à²‚ಟà³à²°à²¿ ಕಾರೠ(ಬಫà³à²«à³†à²Ÿ) ಬೋಗಿಯನà³à²¨à³ ಜೋಡಿಸಲಾಗà³à²¤à³à²¤à²¿à²¦à³† III.ಎಸಿ ಸà³à²²à³€à²ªà²°à³ ಬೋಗಿ ಜೋಡಣೆ ರೈಲೠಸಂಖà³à²¯à³† 12194/12193 ಜಬಲà³â€Œà²ªà³à²° ಮತà³à²¤à³ ಯಶವಂತಪà³à²° ನಿಲà³à²¦à²¾à²£à²—ಳ ನಡà³à²µà³† ಸಂಚರಿಸà³à²µ ಎಕà³à²¸à³â€Œà²ªà³à²°à³†à²¸à³â€Œ ರೈಲಿಗೆ ಅಕà³à²Ÿà³‹à²¬à²°à³ 14 ರಂದೠಜಬಲà³â€Œà²ªà³à²° ಮತà³à²¤à³ ಅಕà³à²Ÿà³‹à²¬à²°à³ 15 ರಂದೠಯಶವಂತಪà³à²° ನಿಲà³à²¦à²¾à²£à²—ಳಿಂದ ಒಂದೠಎಸಿ ತà³à²°à²¿ ಟೈಯರà³â€Œ ಎಕಾನಮಿ ಸà³à²²à³€à²ªà²°à³ ಬೋಗಿಯನà³à²¨à³ ಶಾಶà³à²µà²¤à²µà²¾à²—ಿ ಜೋಡಿಸಲೠಪಶà³à²šà²¿à²® ಸೆಂಟà³à²°à²²à³ ರೈಲà³à²µà³†à²¯à³ ಸೂಚನೆ ನೀಡಿದೆ. Aneesh Hegde 2
www.cr.indianrailways.gov.in- 2023-05-23
General Manager reviews monsoon preparations Central Railway gears up with monsoon preparations Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling were also present. The details of measures taken for ensuring uninterrupted services are as under- 1)More Water Pumps- 24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP. The locations identified on main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and on Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc. 2)Micro tunnelling- Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section. 3)Desilting of drains- Central Railway has targeted de-silting and cleaning of 118.48 kms of drains on its suburban section of which, work has been completed for 102.39 kms and work is presently in progress on cleaning of another 16 kms of drains. 4)Cleaning of culverts- CR has cleaned 88 culverts on its suburban sections, and work is presently in progress on cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar. 5)Trimming of Trees- Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees. 6)Muck removal- Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck on Main lines. 7)Lifting of tracks- 47.8 km track lifting planned, it will be completed till next month. 8) Works done in Ghat Section- -45 meters of Tunnel Portal -300 mts of Rockfall Barrier -500 sq mts of Boulder Netting -40 mts of Canadian Fencing -160 mts of Stabilization of banks -tunnel sounding- 18 locations 9)Separate pumps will be provided for RUBs- at 14 locations. 10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve. 11)Other Important works in progress- ·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week. ·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections. ·Waterproof point motor machines provided at- 277 locations. ·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month. ·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas. ·Bunter Bhavan nallah at LTT to be connected by removing encroachments. ·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders. ·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti. 12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed. 13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates. 14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period. 15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC. --- --- --- Date: May 23, 2023 PR No. 2023/05/23 This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai (Shivraj Manaspure) Chief Public Relations Officer
COMMENTS
NO Comments. Be the first to Comment...
|