For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








4 Trains from (ABU)Ambattur to (HYB)HYDERABAD DECAN


Address: GNG St, Varadaraja Puram, Ambatturavadi Tamil Nadu

Station Code: ABU

Station Name: Ambattur

Zone: SR/Southern

Train Frequency Weekly: 43

Station Traffic: Low

Address: Hyderabad, Public Garden Road, Nampally, Hyderabad, Andhra Pradesh 500004, India

Station Code: HYB

Station Name: HYDERABAD DECAN

Zone: SCR/South Central

Train Frequency Weekly: 241

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
16003MAS NSL EXPRESSMAS08:55KCG23:2014:25SU2A,3A,SL,GN,16003 Status
17651KACHEGUDA EXPMS16:40KCG07:5515:15M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17651 Status
12603HYDERABAD EXPMAS16:45HYB05:4513:00M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12603 Status
12759CHARMINAR EXPMAS18:10HYB08:0013:50M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12759 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
Press Release No. 12008-06-2023
Hubballi
Press Release No. 120, CHANGE IN PATTERN OF TRAIN SERVICE

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 120 Dt: 08.06.2023

I.CHANGE IN PATTERN OF TRAIN SERVICE

Due to line block and power block for bridge work between Basin Bridge Jn. (Madras) - Veysarpadi and the construction of a limited-height subway (LHS) at Ambattur Yard, Southern Railway has notified for change in pattern of train service, as detailed below:

SKIPPING OF STOPPAGE:

Sl

Train Nos.

Journey commencing o­n

Remarks

01

22502 New Tinsukia – SMVT Bengaluru

09.06.2023

Skipping stoppage at Perambur with additional stoppage at Tiruvallur

DIVERSION OF TRAINS:

Sl

Train Nos.

Journey commencing o­n

Remarks

01

12658 KSR Bengaluru – Dr. MGR Chennai Central

10.06.2023

&

11.06.2023

Diverted from fast line to slow line at Avadi and Veysarpadi with extra time of 15-20 minuets

02

16022 Mysuru – Dr. MGR Chennai Central

PARTIAL CANCELLATION OF TRAIN:

Sl No

Train Nos.

Journey commencing o­n

Remarks

01

12658 KSR Bengaluru – Dr. MGR Chennai Central

13.06.2023

Partially cancelled between Avadi and Dr. MGR Chennai Central

II.CANCELLATION OF TRAINS

Due to post rescue restoration work at Bahanaga Bazar station of South Eastern Railway, the following trains will be cancelled as detailed below:

Sl

Train Nos.

Journey commencing o­n

Remarks

01

12551 SMVT Bengaluru – Kamakhya

10.06.2023

Cancelled

02

12253 SMVT Bengaluru – Bhagalpur

III.RESTORATION OF STOPPAFES OF TRAINS

With effect from June 9, 2023, South Central Railway has notified the restoration of stoppages at the following stations for the below trains.

Sl

Train Nos.

Stations

01

07663/07664 Vijayapura – Raichur - Vijayapura

Lingiri & Yadlapur

02

07586 Guntakal - Chikjajur

Sankara Gummanur Halt

                                                                                                                                Aneesh Hegde
                                                                             Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 





2
416/2022-2331-10-2022
Chennai
CHAIRMAN & CEO OF RAILWAY BOARD HOLDS REVIEW MEETING WITH SOUTHERN RAILWAY OFFICIALS AFTER INSPECTION OF KORUKKUPET GOODS SHED, AND DR MGR CHENNAI CENTRAL/MMC

Shri Vinay Kumar Tripathi, Chairman & Chief Executive Officer of Railway Board, held a review meeting at Southern Railway Headquarters today 29th October 2022 with               Shri B.G.Mallya, General Manager, Southern Railway, Principal Heads of All Departments and the Divisional Railway Managers of Chennai, Salem, Tiruchchirappalli, Madurai, Palakkad and Thiruvananthapuram.

During the review meeting, a presentation was made o­n the performance highlights of Southern Railway. The Chairman and CEO reviewed the progress of various infra and developmental works in Southern Railway including Gauge Conversion, Doubling, Electrification, Station Redevelopment of 9 stations of Southern Railway, Gati Shakti Initiatives, Road Safety Works, Speeding of Sections, Bharat Gaurav Trains, Progress of Implementation of Hand Held Terminals and o­ne Station o­ne Product Scheme in Railway Stations.

Earlier, in the morning, Shri Vinay Kumar Tripathi, Chairman & CEO of Railway Board accompanied by Shri B.G.Mallya, General Manager, Southern Railway, Principal Heads of Depts, and Divisional Railway Manager, Chennai, inpected the Korukkupet goods shed and took stock of the facilities available at the goods shed.

Later, the Chairman, Railway Board inspected the hotline cleaning of insulators, a procedure where insulators o­n electrical lines are cleaned with water while the lines are energized. At Dr MGR Chennai Central, Shri Tripathi inspected the Prakriti Twin Coach Tower Car which is used in OHE (Over Head Equipment) inspection, maintenance and hotline monitoring. Later, he visited the newly opened o­ne Station o­ne Product Kanchipuram Silk Saree Stall at Chennai Suburban Terminus (MMC) and interacted with rail users. After the inspection, the Chairman Railway Board met the representatives of recognized trade unions/associations.

During his visit, Shri Vinay Kumar Tripathi, Chairman and CEO, Railway Board, through Video Conferencing unveiled the eplaques of four successfully completed projects over Chennai Division, viz., New Electronic Interlocking Systems at Walajah Road, Thalangai, Arambakkam, Tada and Pedaperiya Railway Stations,  MSDAC System (Multi Section Digital Axle Counter) and Centralisation of Auto – Signaling System in nine Auto Sections of Chennai Egmore – Kodambakkam, Ambattur – Avadi, Sholingur – Thalangai, Kavanur - Gudiyatham, Latheri – Kavanur, Melpakkam – Chitteri, Arakkonam – Tiruvalangadu, Tiruvallur – Kadambattur and Valathoor – Melpatti Sections. MSDAC System at Dr MGR Chennai Central and Chennai Egmore Railway Stations, and Flower Turbine windmill at Moore Market Complex, NGO Building and Light House Station.  

Brief about the Projects Unveiled 

The Signal System upgradation at Chennai Railway Division of Southern Railway, with a route length of 697 kilometres  is towards upgrading the main routes like Chennai – Gudur, Chennai – Jollarpet and Egmore – Tambaram for better speeds. The MSDAC system uses Electromagnetic Sensors, that-is, Detection Points which are installed o­n Tracks. Detection Points are responsible for counting of wheel axles, speed, and direction of train. These Detection Points are connected to Evaluators at Central Location using Telecom cables. The wheel counts as well as health of the field units are continuously transmitted to Central Evaluator by means of telegram packets. The Central Evaluator receives the packets from all the Detection Points and evaluates vacancy status of different track sections and generates vital output. These sections and systems are kept future-ready for integration and implementation of KAVACH without any requirement for additional outdoor cable laying.

As a step towards achieving and generating electricity for its needs, Chennai Division of Southern Railway has installed 3 Nos of 1.5 Kilo watt Peak Hybrid – Solar , Wind, o­n grid systems at the Moore Market Complex, NGO Building and Light House Station; at a cost of        Rs. 8.58 Lakhs providing an Annual Power Generation of 5475 units and an estimated annual savings of Rs. 43,800.



(D. Om Prakash Narayan)
Sr.PRO





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit