For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (AA)Ataria to (LMP)LAKHIMPUR


Address: Sitapur National Highway 24 Uttar Pradesh

Station Code: AA

Station Name: Ataria

Zone: NER/North Eastern

Train Frequency Weekly: 37

Station Traffic: Low

Address: Lakhimpur Kheri, Uttar Pradesh, India

Station Code: LMP

Station Name: LAKHIMPUR

Zone: NER/North Eastern

Train Frequency Weekly: 7

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (AA)Ataria
(stp)sitapur 47Kms from (AA)Ataria

Nearest From LMP
(stp)sitapur 45Kms from (LMP)LAKHIMPUR
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
11027-04-2023
Maligaon
Hon’ble Prime Minister Shri Narendra Modi dedicated to the Nation; Railway projects worth more than 6,000 cr in Assam

Maligaon, 14th April, 2023:

On this auspicious day of Bohag Bihu, Hon’ble Prime Minister Shri Narendra Modi dedicated 249 kms of Double line, 86 km of New Line and 512 kms of Electrified railway track of Assam to the Nation during a programme held at Guwahati o­n 14th April, 2023. Shri Gulab Chand Kataria, Hon’ble Governor of Assam; Dr. Himanta Biswa Sarma, Hon’ble Chief Minister of Assam; Shri Sarbananda Sonowal, Hon’ble Union Minister of Ports, Shipping & Waterways and Ayush; Shri Rameswar Teli, Hon’ble Union Minister of State for Petroleum and Natural Gas and Labour & Employment and Shri Bimal Borah, Hon’ble Minister, Govt. of Assam were also present o­n the occasion.

Speaking o­n the occasion Hon’ble Prime Minister mentioned that there was always the issue of lack of physical connectivity in the Northeast, which is being addressed by the present government by laying emphasis o­n road, rail and air connectivity. During last 9 years broad gauge trains reached Manipur, Mizoram, Meghalaya, Arunachal Pradesh and Tripura. New rail lines are being laid in the Northeast three times faster than before, and the doubling of rail lines taking place at almost 10 times faster than earlier. The Prime Minister highlighted that 5 railway projects that have been inaugurated today worth more than 6,000 crore rupees will accelerate the development of a large part of the region including Assam. The Prime Minister further added that rail has reached a large part of Assam for the first time and the doubling of rail lines will provide easy connectivity to Assam as well as Manipur, Mizoram, Tripura and Nagaland. He also noted that traveling to places of faith and tourism will now become easy.

These newly constructed lines will change the rail transportation scenario o­n this area. More and more trains including trains carrying essential commodities will be able to reach the Northeastern states in a much lesser time from production centers spreading all over the country. The Digaru to Lumding 147 km long double line section was constructed at a cost of Rs. 2,538 crs. Construction of 17 Major Bridges, 106 Minor Bridges and 07 Road Over Bridges are involved. This section passes through the Kamrup (Metro), Marigaon and Nagaon districts of Assam. It helped in reducing the operational constraints of the route which is responsible for all train movements towards states like Nagaland, Mizoram, Manipur, Tripura apart from South and Upper Assam areas.

The New Bongaigaon – Dhupdhara 102 km long section was constructed as part of the o­ngoing New Bongaigaon – Goalpara-Kamakhya 176 km long doubling project. Construction of 35 Major Bridges, 228 Minor Bridges and 24 Road Under Bridges are involved in this section. The project cost was Rs. 1,962 crs. Passing through the Bongaigaon and Goalpara districts of Assam, it will be beneficial for operating trains towards NE region.

Gauripur – Abhayapuri 86 km new line section is part of the New Mainaguri (in West Bengal) to Jogighopa (in Assam) 279 km long new Railway line project. It passes through 5 stations namely Alamganj, Bagribari, Bilasipara, Chapar and Bechimari. With the completion of this section, population of a huge area falling under the Dhubri and Bongaigaon districts of Assam got the benefit of Railway service for the very first time. Constructed at a cost of Rs. 1,267 cr, it involves construction of 30 Major Bridges, 305 Minor Bridges, 03 tunnels, 133 Road Under Bridges and 02 Road Over Bridges.

As part of the Indian Railways ambitious plan to become the largest “GREEN RAILWAYS” in the world, it plans to become a zero carbon emission network by 2030. Newly electrified 381 km Raninagar Jalpaiguri – Guwahati and 131 km Chaparmukh – Senchoa & Senchoa – Mairabari sections will lead to seamless connectivity of trains to and from Northeast to various metro cities like New Delhi, Chennai, Mumbai, Kolkata, Ahmedabad etc. Running of heavy hauled goods train towards Northeast became possible. Train operation cost also reduced significantly due to savings o­n fossil fuel consumption.



(Sabyasachi De)
CPRO/N.F.Railway




2
27609-09-2022
Maligaon
N. F. Railway General Manager conducts review meeting with MPs Various aspects of Railway Developmental plans in Tinsukia division highlighted

The General Manager of Northeast Frontier Railway Shri Anshul Gupta conducted a meeting with Hon’ble Members of Parliament covering the jurisdiction of Tinsukia division, at Tinsukia o­n 09thSeptember, 2022. Altogether three MPs and two representative of MPs were present at the meeting which included Shri Rameswar Teli, Hon’ble Union Minister of State in the Ministry of Petroleum and Natural Gas & Ministry of Labour and Employment, Hon’ble MP of Rajya Sabha Shri Kamakhya Prasad Tasa from Assam; Hon’ble MP of Lok Sabha Shri Pradan Baruah (Lakhimpur), Representative of Shri Sarbananda Sonowal, Hon’ble Union Minster of Ports, Shipping & Waterways and Ayush and Representative of Hon’ble MP of Rajya Sabha Shri Ajit Kumar Bhuyan from Assam. The Divisional Railway Manager of Tinsukia, Shri Bijaya Kr. Mishra along with senior railway officials of N. F. Railway’s Headquarters was also present.

The General Manager of N. F. Railway while welcoming all MPs gave a brief overview of operations and infrastructure works going o­n under its territory. He also highlighted the achievement of the entire NFR. He further informed the Hon’ble MP’s regarding implementation of o­ne station o­ne product at various stations over NFR to help the local entrepreneur to showcase and sell the products and crafts of local area. MPs were briefed about the status of o­ngoing doubling and new line projects of Northeast. The doubling work from Lumding to Dibrugarh via Simaluguri and Tinsukia has been approved and work is in under process.

The General Manager mentioned that N. F. Railway has given emphasis o­n faster adoption of PM Gati Shakti in NE states for handling of both outward and inward traffic. He also highlighted about the cabinets proposal to revise the Railway’s land policy to implement PM Gati Shakti framework. He further said that more and more Kisan Rails are being operated to export the local produces outside the state. The General Manager also informed the Hon’ble members present about the Intrusion Detection System to be introduced within NFR to avert possibility of train-elephant collision.

Hon’ble MPs were requested to extend help in removing illegal encroachments, closure of unauthorised crossing, closure of level crossings, etc. to further improve safety and undertaking various development works. Items pertaining to the requirement of public under the Tinsukia division like new train services, better station facilities, etc were also discussed. Deliberations in this meeting would immensely help the Railways in finalizing the Railway developmental plans for the people of this region. The suggestions and views expressed by the Hon’ble Members would be given due considerations while formulating the proposals, said the GM.



(Sabyasachi De)
CPRO/N.F.Railway





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit