For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

14724 KALINDI

Train Schedule & Fare
14724-KALINDI EXPRESS
Bhiwani to Kanpur central | Distance-605Kms | Travel Time 17:00Hrs | Avg Speed 35Km/Hr

Runs On- MON,TUE,WED,THU,FRI,SAT,SUN
Fare Approx
1AC2AC3ACCCFCSL2S3E
18801115780XX290XX


S.noCodeStn NameArr.Dep.HaltDisDay
1BNWBHIWANISource18:3501
2BNWCBHIWANI CITY18:3918:412:0061
3BMLLBAMLA18:5118:532:00141
4KHRKKHARAK19:0219:031:00221
5KLNKKALANAUR KALAN19:1219:142:00291
6LHLLLAHLI19:2219:242:00361
7ROKROHTAK JN19:5519:572:00501
8SPZSAMPLA20:1220:142:00721
9BGZBAHADURGARH20:2820:302:00901
10SSBSHAKURBASTI20:5420:562:001101
11DKZDELHI KISHANGNJ21:0921:112:001171
12DLIDELHI21:3021:5020:001201
13DSADELHI SHAHDARA22:0622:082:001261
14GZBGHAZIABAD22:3722:392:001401
15KRJKHURJA JN23:3023:322:002021
16ALJNALIGARH JN00:1000:155:002452
17TDLTUNDLA JN02:0002:055:003232
18FZDFIROZABAD02:2502:305:003402
19SKBSHIKOHABAD JN02:5503:005:003602
20MNQMAINPURI03:4503:505:004082
21BGQBHONGAON04:1004:122:004222
22FBDFARRUKHABAD07:0007:4040:004662
23FGRFATEHGARH07:5307:552:004712
24KLJKAMALGANJ08:0708:092:004842
25GHJGURSAHAIGANJ08:2508:272:005032
26KJNKANNAUJ08:4808:513:005252
27BLUBILHAUR09:0909:112:005502
28BJRBARRAJPUR09:3809:402:005702
29CPAKANPUR ANWRGANJ10:4810:5810:006032
30CNBKANPUR CENTRAL11:35Destination6052
Popular Station Combinations
30 results in 0.06 seconds

RECENT NEWS

1
Press Release No. 14724-06-2020
Hubballi
Press Release No. 147, HOSAPETE JUNCTION YARD REMODELING COMPLETED

प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿Press Release No. 147  Dt: 23.06.2020

HOSAPETE JUNCTION YARD REMODELING COMPLETED

Work of remodeling of Hosapete Junction, part of doubling of Railway track between Hosapete and Tinaighat has been completed today. The yard has now been modified to suit to Railway Electrification between Hosapete –Tinaighat - Vasco section.  After 5 Days of Pre-non interlocking and 4 Days of interlocking, the work has been commissioned today.  The commissioning of the yard is yet another major work undertaken by South Western Railway in lockdown period.  Turning adversity of lockdown into an opportunity, remodeling of the Yard was completed.  In normal course of normal train running, cancellation/regulation of both passenger and express trains would have to be resorted for this yard remodeling.  It would have necessitated cancellation/short termination   and rescheduling of many passenger train services, causing inconvenience to passengers.

Simultaneous reception and dispatch of trains from both directions would be possible now after yard remodeling.  This gives flexibility in train operations and hence trains need not wait when trains are being dispatched to the other end. Also with remodeling of the Yard, Hosapete Junction is now fit to deal both diesel and electric traction (trains).

This remodeling of Hosapete involved Civil Engineering, Signalling & Telecommunication and Electrical works. The same were completed at a cost of Rs.60 Cr. About 30 (total of officers and staff) worked around the clock for 9 days for completing the work duly taking precautionary measures in wake of COVID. Wearing of masks, frequent sanitization of hands and tools and social distancing were followed strictly.

The remodeling involved removal of yard congestion and provision of double line connectivity towards Gadag end to facilitate Up and Down movements simultaneously. Connectivity to Road 2, 3 and 4 of Ballari UP line and Road 5, 6 and 7 of Ballari Down line has now been provided.  To increase yard flexibility and simultaneous reception /dispatch of trains and shunting operations, two additional goods reception and dispatch lines, two additional shunting necks, 2 additional sidings were added. These additional lines and sidings will go a long way in increasing importance of Hosapete yard further.

New Station master building has been constructed under this work.  Electronic Interlocking system of distributed architecture and dual VDU (Visual Display Unit) operation to control the entire yard operation were provided. Eliminating the existing electro mechanical working from 4 Cabins (East, West, Centre and Bye pass), all operations are now centralized from Station Master's panel room.

Electronic Interlocking (EI) System with hot standby facility was commissioned and same controls the whole station with o­ne Central Interlocking Unit and 24 Object Controllers distributed in 3 locations. Station Master will control the complete yard with click of button/mouse.All the sub systems of EI are connected through OFC (Optical Fibre Cable) in redundant path, to ensure failure free working. 

14 Reception and Dispatch  (R&D) Lines, Bye pass line connecting Gadag and Yeswanthnagar lines, Rail Grinding machine(RGM) siding, Tower wagon siding, sleeper siding, washing cum pit lines, ROH shed lines, short shunting necks, long shunting neck etc.  Reception and dispatch of trains towards Bellary line can now be done and parallely shunting also can be done.  All tracks have been completely track circuited improving safety in operation of trains.

Remodeled Hosapete Jn. is the station with highest number of routes   so far in South Western Railway. It has 415 routes, followed by Yesvantpur with 262 routes, Bengaluru with 215 routes and Hubballi 229 routes.

This commissioning further enables up and down train movements simultaneously o­n Gadag and Ballari sides of Hosapete Yard. This reduces the detention of trains while  ensuring 100% safety.  96 point machines, 127 track circuits, 48 main signals, 34 calling o­n signals, 32 shunt signals, 31 post type shunt signals have been provided.

10 LC gates are interlocked with 20 road warning signals.  To work the operations in failure of power condition, six 20 KVA DG sets (2 each at 3 Object Controller huts) have been provided.

Data logger at each OC huts and 24 OCs have been installed. 13 locally operated Non interlocked points/key lock points have now been replaced by motor operation and instead of manual shunting being done till now, shunt signals have been provided which will  speed up the shunting operations ensuring safety.

Teams of various departments worked diligently under the guidance of Shri Vijay Agrawal, PCE, Shri Ajay Kumar, PCSTE, Shri B. G. Mallya, PCEE and Shri Arvind Malkhede, DRM/ Hubballi for completing this major work.

The Civil Engineering and Electrical works were done by Hubballi Division and Signalling work taken up by Construction Projects Organization.  Electrification works from Ballari to Hosapete were done by RVNL.

Shri A.K. Singh, General Manager/SWR said that this was a long pending work which has been completed with team work and this will be mile stone in running electric trains from Guntakal to Hosapete now and further to Hubballi.

                   


                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi





2
19062019 / 14724-06-2019
Maligaon
RECORD TICKET CHECKING EARNINGS BY NFR IN A MONTH

During the month of May, 2019 N.F. Railway has recovered Rs. 6.74 crs as fare and penalty from offenders which is 33.74% higher than the last year’s earnings of Rs. 5.04 crs for the corresponding month. This is the highest ever earnings in a single month in the history of this railway from ticket checking. During May, 2019 this railway detected 96599 cases against 74150 cases during the corresponding month of last year which is also an increase of 30.28%.

Ticket checking is always the endeavor of this railway not o­nly to sustain growth but also to ensure that the passengers are travelling with proper ticket and in proper class. This also helps the genuine passenger to have a hassle free travel experience. Maximum stress has been given to discourage ticketless travel by conducting regular checking at vulnerable sections. This is an area where there is always scope of improvement, so maximum effort has been given to ensure that target against this head is achieved. N.F. Railway is operating trains in difficult terrain and remote areas to sustain growth and also for Socio-Economic development. Prevention of ticketless travel is a challenging job with limited number of staff.

N.F. Railway officials have been conducting surprise ticket checking drive in Mail / Express and passenger Trains. As per section 137, of the Indian Railway Act of 1989, travelling without ticket, improper ticket or un-booked luggage in an offence punishable by imprisonment or fine or both. Substantial growth in earning against Ticket Checking activity during the month of May’19 was possible due to proper mobilization of the Ticket Checking staff in vulnerable sections and with constant monitoring by Divisions and HQ unit. To sustain future growth in this head, proper planning and yearly targets has already been fixed.

To discourage ticketless travelling, Northeast Frontier Railway has put systems in place whereby surprise ticket checking drive is conducted by Flying Ticket Checking Squads of Divisions as well as HQ. Fortress checks are also conducted in stations. For this officers are nominated at HQ and Divisional levels from different department who are accompanied by security personal from Railway Protection Force and Govt. Railway Police.



(Pranav Jyoti Sharma)
CPRO/N.F.Railway





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search