For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

jogighopa

STATION INFO

Address: Jogighopa Rail Station, Jogighopa, Assam 783382, India

Station Code: jpz)jogighop

Station Name: jpz)jogighopa

Zone: NFR/Northeast Frontier

Total Unique Trains: 10

Train Frequency Weekly: 53

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
55812KYQ DBB FAST PASS00:3100:321M,TU,W,TH,F,SA,SUUNRESERVED
15418SHTT APDJ RR EXP00:5800:591M,W,SASL,GN
15417APDJ SHTT RR EXP01:3401:351TU,F,SUSL,GN
75723NBQ GHY DEMU05:3905:401M,TU,W,TH,F,SA,SUUNRESERVED
55805NBQ GHY PASS06:1906:201M,TU,W,TH,F,SA,SUUNRESERVED
55804GHY NBQ PASS11:0411:051M,TU,W,TH,F,SA,SUUNRESERVED
55811DBB KYQ FAST PASS11:3711:381M,TU,W,TH,F,SA,SUUNRESERVED
55803NBQ GHY PASS17:4217:431M,TU,W,TH,F,SA,SUUNRESERVED
75724GHY NBQ DMU20:1520:161M,TU,W,TH,F,SA,SUUNRESERVED
55806GHY NBQ PASS20:4420:451M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
11027-04-2023
Maligaon
Hon’ble Prime Minister Shri Narendra Modi dedicated to the Nation; Railway projects worth more than 6,000 cr in Assam

Maligaon, 14th April, 2023:

On this auspicious day of Bohag Bihu, Hon’ble Prime Minister Shri Narendra Modi dedicated 249 kms of Double line, 86 km of New Line and 512 kms of Electrified railway track of Assam to the Nation during a programme held at Guwahati o­n 14th April, 2023. Shri Gulab Chand Kataria, Hon’ble Governor of Assam; Dr. Himanta Biswa Sarma, Hon’ble Chief Minister of Assam; Shri Sarbananda Sonowal, Hon’ble Union Minister of Ports, Shipping & Waterways and Ayush; Shri Rameswar Teli, Hon’ble Union Minister of State for Petroleum and Natural Gas and Labour & Employment and Shri Bimal Borah, Hon’ble Minister, Govt. of Assam were also present o­n the occasion.

Speaking o­n the occasion Hon’ble Prime Minister mentioned that there was always the issue of lack of physical connectivity in the Northeast, which is being addressed by the present government by laying emphasis o­n road, rail and air connectivity. During last 9 years broad gauge trains reached Manipur, Mizoram, Meghalaya, Arunachal Pradesh and Tripura. New rail lines are being laid in the Northeast three times faster than before, and the doubling of rail lines taking place at almost 10 times faster than earlier. The Prime Minister highlighted that 5 railway projects that have been inaugurated today worth more than 6,000 crore rupees will accelerate the development of a large part of the region including Assam. The Prime Minister further added that rail has reached a large part of Assam for the first time and the doubling of rail lines will provide easy connectivity to Assam as well as Manipur, Mizoram, Tripura and Nagaland. He also noted that traveling to places of faith and tourism will now become easy.

These newly constructed lines will change the rail transportation scenario o­n this area. More and more trains including trains carrying essential commodities will be able to reach the Northeastern states in a much lesser time from production centers spreading all over the country. The Digaru to Lumding 147 km long double line section was constructed at a cost of Rs. 2,538 crs. Construction of 17 Major Bridges, 106 Minor Bridges and 07 Road Over Bridges are involved. This section passes through the Kamrup (Metro), Marigaon and Nagaon districts of Assam. It helped in reducing the operational constraints of the route which is responsible for all train movements towards states like Nagaland, Mizoram, Manipur, Tripura apart from South and Upper Assam areas.

The New Bongaigaon – Dhupdhara 102 km long section was constructed as part of the o­ngoing New Bongaigaon – Goalpara-Kamakhya 176 km long doubling project. Construction of 35 Major Bridges, 228 Minor Bridges and 24 Road Under Bridges are involved in this section. The project cost was Rs. 1,962 crs. Passing through the Bongaigaon and Goalpara districts of Assam, it will be beneficial for operating trains towards NE region.

Gauripur – Abhayapuri 86 km new line section is part of the New Mainaguri (in West Bengal) to Jogighopa (in Assam) 279 km long new Railway line project. It passes through 5 stations namely Alamganj, Bagribari, Bilasipara, Chapar and Bechimari. With the completion of this section, population of a huge area falling under the Dhubri and Bongaigaon districts of Assam got the benefit of Railway service for the very first time. Constructed at a cost of Rs. 1,267 cr, it involves construction of 30 Major Bridges, 305 Minor Bridges, 03 tunnels, 133 Road Under Bridges and 02 Road Over Bridges.

As part of the Indian Railways ambitious plan to become the largest “GREEN RAILWAYS” in the world, it plans to become a zero carbon emission network by 2030. Newly electrified 381 km Raninagar Jalpaiguri – Guwahati and 131 km Chaparmukh – Senchoa & Senchoa – Mairabari sections will lead to seamless connectivity of trains to and from Northeast to various metro cities like New Delhi, Chennai, Mumbai, Kolkata, Ahmedabad etc. Running of heavy hauled goods train towards Northeast became possible. Train operation cost also reduced significantly due to savings o­n fossil fuel consumption.



(Sabyasachi De)
CPRO/N.F.Railway




2
02324-01-2023
Maligaon
Better customer interface results in increased freight operation on NFR

In continuous effort to improve transportation of freight traffic, N. F. Railway has been opening new stations for handling inward and outward goods traffic. Few more railway stations have been opened for freight traffic during December, 2022 enabling easier transportation of various goods by customers. This is expected to benefit transporters in a big way.

To improve customer interface and further augment freight transportation, Jogighopa and Mendipathar station in Meghalaya under Rangiya division has been opened for handling of inward coal traffic w.e.f 05th December, 2022. Azara station under Rangiya division has been opened for handling of Roll o­n - Roll off traffic w.e.f 06th December, 2022. This new facility will help transportation of essential items to various north-eastern states like Manipur, Mizoram, Tripura during monsoon season. Trucks loaded with essential items can be transported through railway rakes for unloading in various states where transportation through road becomes difficult. As a result of which common people will be benefited. Moreover, New Bongaigaon station under Rangiya division has also been opened for handling of inward coal traffic w.e.f 27thDecember, 2022.

The NFR has unloaded 1332 freight carrying trains in December, 2022 as against 1230 in November, 2022. In addition, 10879 rakes of freight trains have been carried from April to December, 2022 as against 9941 in corresponding period of last year showing an improvement of 9.43%.



(Sabyasachi De)
CPRO/N.F.Railway







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search