For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

Sompur Road

STATION INFO

Address: Sompur Karnataka

Station Code: SOQ)Sompur Roa

Station Name: SOQ)Sompur Road

Zone: SWR/South Western

Total Unique Trains: 2

Train Frequency Weekly: 13

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
51412UBL BAY PASS09:5910:001M,TU,W,TH,F,SA,SUUNRESERVED
51411BAY DWR PASS17:1917:201M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 38728-10-2021
Hubballi
Press Release No. 387, I. EXTENSION OF OFHUBBALLI – BALLARI – HUBBALLI PASSENGERSPECIAL UP TO GUNTAKAL, II. CANCELLATION OF TRAINS.

              दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY                à¤ªà¥à¤°à¥‡à¤¸ à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 387 Dt: 26.10.2021

I.       EXTENSION OF OFHUBBALLI – BALLARI – HUBBALLI PASSENGERSPECIAL UP TO GUNTAKAL

It is decided to extend the services of Train No. 07337/ 07338SSS Hubballi–Ballari – SSS Hubballi Daily Passenger Special from Ballari to Guntakal for convenience of Passengers as detailed below:-

Train No.07337SSS Hubballi – Guntakal Daily Passenger Specialwith effect commencing journey from SSS Hubballi from 27.10.2021 to 30.11.2021

Stations

Train No.07338 Guntakal- SSS HubballiDaily Passenger Special with effect commencing journey from Guntakal from 27.10.2021 to 30.11.2021

Timings

Arr/Dep

Arr/Dep

Timings

07.45 AM

Dep

SSS Hubballi

Arr

09.10 PM

07.56/07.57 AM

A/D

Kusugal

A/D

08.02/08.03 PM

08.06/08.07 AM

A/D

Hebsur

A/D

07.50/07.51 PM

08.13/08.14 AM

A/D

Sisvinhalli

A/D

07.42/07.43 PM

08.24/08.25 AM

A/D

Annigeri

A/D

07.32/07.33 PM

08.34/08.35 AM

A/D

Hulkoti

A/D

07.21/07.22 PM

08.58/09.00 AM

A/D

Gadag

A/D

07.02/07.04 PM

09.09/09.10 AM

A/D

Kanginhal

A/D

06.50/06.51 PM

09.23/09.24 AM

A/D

Sompur Road

A/D

06.31/06.32 PM

09.32/09.33 AM

A/D

Banni Koppa

A/D

06.21/06.22 PM

09.45/09.46 AM

A/D

Bhanapur

A/D

06.10/06.11 PM

10.00/10.02 AM

A/D

Koppal 

A/D

05.58/06.00 PM

10.12/10.13 AM

A/D

Ginigera

A/D

05.44/05.45 PM

10.20/10.21 AM

A/D

Hitnal

A/D

05.37/05.38 PM

10.26/10.27 AM

A/D

Munirabad

A/D

05.30/05.31 PM

10.45/10.50 AM

A/D

Hosapete

A/D

05.15/05.20 PM

11.17/11.18 AM

A/D

Gadiganuru

A/D

04.45/04.46 PM

11.28/11.30 AM

A/D

Toranagallu

A/D

04.33/04.35 PM

11.40/11.41 AM

A/D

Duroji

A/D

04.22/04.23 PM

11.51/11.52 AM

A/D

Kudatini

A/D

04.11/04.12 PM

12.17/12.18 PM

A/D

Ballari Cantt

A/D

03.58/03.59 PM

12.45/12.50 PM

A/D

Ballari

A/D

03.45/03.50 PM

01.05/01.06 PM

A/D

2
Press Release No. 38913-02-2020
Hubballi
Press Release No. 389, BALLARI TO HUBBALLI TRACK DOUBLED

                                                                                                       

                                                                 SOUTH WESTERN RAILWAY

                                      Press Release No. 389  Dt. 12.02.2020

Ballari to Hubballi track doubled

Binkadakatti - Gadag – Kaninghal - Harlapur - important 23 km long section o­n either side of Gadag junction o­n Hubballi division has been commissioned with Double line o­n 12.02.2020.  The 23 Km section is part of the 352 Km doubling of Hosapete – Tinaighat – Vaso-da-gama Section project.  This has been doubled after inspection of Commissioner of Railway Safety o­n 11.01.2020.  Prior to this, 201 Km of doubling in the section has been commissioned. General Manager, South Western Railway Shri A K Singh said that "With this the section to the east of Hubballi Station upto Ballari has been doubled.  The doubling o­n this important section will give impetus to mobility of both passenger and goods trains. The work of electrification o­n this section is also being executed in full swing”.

At Gadag new Electronic Interlocking with 149 routes has been commissioned at 4.00 hrs.  This replaces end cabin system at Gadag. At Kanginhal Station new Electronic Interlocking was commissioned at 5.10 hrs.  This was a small 3 block section single line patch and with this, doubling is now through between Hosapete to Hubballi /Hubballi byepass which has tremendous operational benefits.

Shri P K Kshatriya, CPM, Shri Ramesh Kambli, GM/Projects, Smt Madhavi John, GGM/S&T and Shri Satish Kumar, JGM/S&T, RVNL officers have been instrumental in completing this section without any detention to trains. Officers of SWR mainly from Hubballi Division of Engineering, Operating, Signal & Telecommunication ensured timely execution of the doubling.  Officers of Hubballi Division have streamlined the traffic movements during Non Interlocking (NI) and facilitated the testing blocks which also had a major role for early commissioning.

Now the doubling apart from for the ghat section area in Karnataka from Tinaighat to Hosapete has been completed except for a small patch between Hubballi and Dharwad (20 Kms) which is targeted for completion by end of March 2020.

The details of sections commissioned during last 4 years is as below:-

Commissioned in 2016-17

1.

Harlapur – Sompur - Bannikoppa-Bhanapur

26.68

2.

Kambarganvi-Kasanhatti-Alnawar

11.32

Commissioned in 2017-18

1.

Shivthan-Londa-Tinaighat

16.47

2.

Bhanapur-Koppal

12.08

3.

Hebsur-Navalgund-Annigeri

16.33

Commissioned in 2018-19

1.

Devrayi-Shivthan

8.00

2.

Koppal-Munirabad-Hosapete

27.51

3.

Annigeri-Binkadkatti

17.43

Commissioned in 2019-20

1.

Alnawar-Devrayi

22.00

2.

Hubballi bye pass

20.60

3.

Binkadakatti - Gadag – Kaninghal - Harlapur

23.13

                                                                       


                                                     (E. Vijaya)

                                                          Chief Public Relations Office








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit