For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

SARAI RANI

STATION INFO

Address: Sarai Rani Railway Station, Rani Ki Sarai Uttar Pradesh

Station Code: RKS)SARAI RAN

Station Name: RKS)SARAI RANI

Zone: NER/North Eastern

Total Unique Trains: 6

Train Frequency Weekly: 37

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
55163SHG ARJ PASS00:5901:012M,TU,W,TH,F,SA,SUUNRESERVED
55164ARJ SHG SPL02:4602:482M,TU,W,TH,F,SA,SUUNRESERVED
55138SHG BUI PASS07:1307:152M,TU,W,TH,F,SA,SUUNRESERVED
55137BUI SHG PASS09:1009:122M,TU,W,TH,F,SA,SUUNRESERVED
55140SHG BUI PASS16:3216:342M,TU,W,TH,F,SA,SUUNRESERVED
55139BUI SHG PASS20:3120:332M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
0121-09-2021
Bhubaneswar
TRAIN RELATED IMPORTANT INFORMATION:




DIVERSION OF TRAINS –


In view of safety related modernization work between Kurichedu & Donakonda Stations in connection with commissioning of Doubling Work in Guntur-Guntakal Railway Section over South Central Railway jurisdiction, 08463/08464 Bhubaneswar-Bangalore-Bhubaneswar Prashanti Special from both the directions o­n 26th & 27th September’2021will be diverted.


This train will run via Guntur-PGDP-Kacheguda-Dhone Stations instead of Vijayawada-Guntur-Nandyal-Guntakal Stations bypassing Narasaraopet, Vinukonda, Markapur Road, Cumbum, Giddalur & Nandyal Stations o­n the above days.  


REVISED TIMINGS OF 3 TRAINS OVER SAMBALPUR DIVISION–



Timings of 02827 Puri-Surat Special from Puri w.e.f. 26th September’2021 will be revised at four Stations over Sambalpur Division. This train will arrive at Bargarh Road at 0239hrs and will leave at 0241hrs instead of its schedule arrival time at 0250hrs and departure at 0252hrs. Similarly, this train will leave Kantabanji at 0545hrs instead of earlier scheduled time at 0600hrs. The timings for this train at Balangir and Titilagarh have also been revised.


02880 Bhubaneswar-LTT Special from Bhubaneswar w.e.f. 27th September’2021 and 02866 Puri-LTT Special from Puri w.e.f. 28th September’2021 will arrive at Jharsuguda Road at 1330hrs and will leave at 1335hrs instead of earlier arrival timings at 1339hrs and departure at 1344hrs.


REVISED TIMINGS OF PURI-VALSAD SPECIAL AT SURAT & VALSAD


09210 Puri-Valsad Special from Puri w.e.f. 19th September’2021 will arrive at Surat at 1057hrs and will leave at 1102hrs instead of earlier arrival timings. Similarly, this train will arrive at Valsad at 1210hrs instead of earlier 1200hrs.


RESUMPTION OF BHUBANESWAR-BHADRAK SPECIAL


08412/08411 Bhubaneswar-Bhadrak-Bhubaneswar Special from both the directions w.e.f. 23rd September’2021 will be resumed its service and wiil run till further advice.




2
20-09-2021
PRESS RELEASE: FIRST RAKE FOR FERTILIZER OF ER LOADED FROM M/S. MATIX UREA MANUFACTURING UNIT, PANAGARH TODAY

  

FIRST RAKE FOR FERTILIZER OF ER LOADED FROM M/S. MATIX UREA MANUFACTURING UNIT, PANAGARH TODAY

Kolkata, September 19, 2021:

 

During the lockdown period when passenger & local train services are suspended, Eastern Railway continues to run freight trains to maintain the backend supply chain of the country.

 

Further, The Business Development Units (BDUs), as created both at the Headquarters level and at the Divisional levels, are operated throughout Eastern Railway and they are leaving no stone unturned for attracting new traffic and increasing the rail share in the existing stream of traffic. They are constantly interacting with the industries and facilitating them for carrying the consignment by rail. The interested industries are contacting the BDUs in their area to get o­ne stop solution for their transportation needs. Basic objective of all these is to bring ease in transportation of freight traffic through rail. Due to active endeavour andpersistent & proactive marketing, Eastern Railway has managed to load first rake for fertilizer from M/s. Matix Urea Manufacturing Unit, Panagarh.The 1st rake with the load of 1215 Tonnes of urea will be destined for Sasaram under East Central Railway. This is a historic day for Asansol Division in particular and Eastern Railway as a whole.

 

The plant at Panagarh is a Urea manufacturing unit of M/sMatix Fertilizers & Chemicals Pvt. Ltd. Co., which was established in 1.10.2017. The annual capacity of this plant at Panagarh is 1.27 million tonne per annum. The siding of this plant was notified This is a historic day for Asansol Division in particular and Eastern Railway as a whole production of ammonia started from 5.8.2021 and urea production from 9.9.2021.

 

 

 









COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search