For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

PREMPUR

STATION INFO

Address: National Highway 2 Uttar Pradesh

Station Code: PMPR)PREMPU

Station Name: PMPR)PREMPUR

Zone: NCR/North Central

Total Unique Trains: 4

Train Frequency Weekly: 25

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
64593FTP CNB MEMU08:1608:171M,TU,W,TH,F,SA,SUUNRESERVED
64591SFG CNB MEMU10:0510:061M,TU,W,TH,F,SA,SUUNRESERVED
64592CNB SFG MEMU15:2515:261M,TU,W,TH,F,SA,SUUNRESERVED
64594CNB FTP MEMU19:0919:101M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
10-12-2020
Focus on Safety and Mobility-North Central Railway completed many important works in November-2020

North Central Railway

Headquarter

Public Relations

Prayagraj

 

No. 11PR/12/2020                            Press ReleaseDate: 03.12.2020

 

Focus o­n Safety and Mobility-North Central Railway completed many important works in November-2020

 

Despite o­ngoing Covid-19 pandemic, North Central Railway achieved many milestones in November-2020. Besides surpassing last year originating freight loading and achieving highest interchange of 532 freight trains o­n 30.11.20, NCR also completed many important works of infrastructure development and safety related maintenance of assets during November-2020.

 

For safety of road users 04 RUBs o­ne each in Prayagraj- Kanpur, Shikohabad-Farukhabad, Mathura-Alwar and Dholpur-Agra sections were commissioned in Nov’20 and so far, 09 RUBs have been commissioned in the current financial year. Manned level crossing no.58 in Kanpur-Tundla section was closed during the month and total 28 manned level crossings have been closed in current financial year till November-2020. Provision of power lifting barriers at two level crossings, sliding booms at two level crossings and secured communication between station and gateman at 08 LCs are other important road user safety works completed in November-2020.

 

North central Railway operates more than 120 trains at 130 Kmph or higher speeds and its trunk routes carry very density freight and passenger traffic. This calls for impeccable maintenance of track and other assets. In November-2020, 38 kms track renewal was done with cumulative renewal of283 kms track in current financial year.To enhance safety and speed of trains over point and crossing zone, 08 nos. thick web switches have been provided in Nov’2020 and so far, 30 thick web switches have been commissioned in FY 2020-21.

 

46 routes electronic interlocking (EI) at Mauranipur station in Jhansi division commissioned in November 2020. With completion of this work all electro-mechanical signaling in Jhansi-Banda section have been replaced with latest electronic interlocking/ panel interlocking/ standard-IIIinterlocking. Similarly, commissioning of 45 routes EI at Malanpur station o­n 10.11.20 paved the way for replacement of electro-mechanical signaling in Gwalior-Bhind section. In November 11.88 km route between Prempur and Aung stations o­n Prayagraj division was equipped with automatic signaling which will enhance train handling capacity in this section.

 

In the field of rolling stock maintenance,intermediate overhauling (IOH) of 32coaches, shop schedule (SS-I) of25LHB coaches, periodic overhauling(POH) of 30 coaches, routine overhauling (ROH) of 288 wagons and periodicoverhauling (POH) of 751wagons were done by depots and workshops of NCR in November- 2020 to ensure safe and detention free train operations.

 

In view of foggy and cold weather, safety seminars o­n prevention of signal passing at danger (SPAD); safe train operation during foggy weather; precaution to taken during shunting operation; precautions for workman at worksite and cold weather patrolling and action to be taken in case of rail fracture etcwere organized at different stations, crew lobbies, yards etc. of Agra, Jhansi and Prayagraj division.

 





2
21-07-2020
Infrastructure works for mobility improvement over North Central Railway

North Central Railway

Headquarter

Public Relations

Prayagraj

 

No. 11PR/05/2020Press ReleaseDate: 20.07.20

 

Infrastructure works for mobility improvement over North Central Railway

 

Un-deterred by Covid-19 situation, these critical works are targeted for completion in FY 2020-21

 

Mobility of trains o­n North Central Railways plays most critical role in overall punctuality and average speed of trains from North to East, west and South. NCR carry more than10% of total Indian Railways’ traffic with just 5% of its asset and has been working continuously to identify and execute critical works for improvingmobility of trains.

 

In spite of Covid-19 situation, NCR has completed many important infrastructure works like Kanpur yard remodeling, replacement of 04 diamond crossing at Tundla, layout correction in Lalitpur& Khajuraho yard, commissioning of o­ne each ROB and RUB and closure of o­ne level crossing, platform raising at Mathura and Baad stations,automatic signalling in Sarsaul-Prempursection and Dankaur- Maripat third line, interlocking of 02 level crossings and provision of sliding boom o­n 09 level crossings , new passenger lifts at Kanpur and Gwaliorstations, 132 KV transmission line shifting work in national capital region for Gaziabad- Merrutrapid transit system, provision of split ACs in place of centralized ACs in divisional traffic control andshifting of section control boards in individual rooms for prevention of Covid-19 etc.

 

Moving ahead in this direction, North Central Railway is now working o­n additional infrastructure works for increasing mobility of trains targeted for completion in o­ngoing FY 2020-21. Critical track works ofthird line between Naini and PrayagrajChheoki, increasing speed of Churk- Lusa stretch from existing 60 to 100 kmph of in Chunar- Chopansection andprovision of longer loop lines for handling long-haul trains at Dabhoura and SikrodaKawnari stations are included in this list. For improvement of loading related infrastructure commissioning of Ultratech cement siding at Harduaganj and Bevara, Pragati power house siding improvement at Bevara and its connectivity with Sankargarh station, improvement in NTPC siding at Meja and electrification of ballast sidings in Jhansi division are included under critical infrastructure works. For improvement in yard and train handling facilities at stations conversion of Sri Ghasinagar station from existing D to B class and yard remodeling of Yamuna Bridge station for direct reception and dispatch facility to trains are targeted. Important signalling works for mobility improvement are replacement of mechanical signalling with Electronic Interlocking at loco B-cabin Kanpur and A and B cabins of Juhi, upgradation of signalling system at Ranipur Road, Mau Ranipur&Rora stations in Jhansi -Banda section, commissioning of intermediate block signal (IBS) in Govindpuri -Bhimsen section and commissioning of automatic signalling in third line between Dankaur- Khurja in Gaziabad- Aligarh section.

 

These works jointly identified by operations, construction, NCR project unit and divisions are critical to safe and efficient train operations and expected to yield long term benefits to mobility of trainsover North Central Railway.








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search