For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

MALANPUR

STATION INFO

Address: Madhya Pradesh 476444, India

Station Code: MLAR)MALANPU

Station Name: MLAR)MALANPUR

Zone: NCR/North Central

Total Unique Trains: 10

Train Frequency Weekly: 51

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
11802ETW JHS LINK EXP06:4606:471M,TU,W,TH,F,SAUNRESERVED
59823GWL BIX PASS07:0907:112M,TU,W,TH,F,SA,SUUNRESERVED
21125INDORE BHIND EXP08:2908:301TU,F,SA2A,3A,SL,GN
59824BIX GWL PASS11:1411:162M,TU,W,TH,F,SA,SUUNRESERVED
59821KOTA BIX PASS12:4812:502M,TU,W,TH,F,SA,SUSL,GN
59825GWL BIX PASS15:1015:122M,TU,W,TH,F,SA,SUUNRESERVED
21126BIX RTM EXP17:5918:012W,SA,SU2A,3A,SL,GN
59822BIX KOTA PASS19:3019:322M,TU,W,TH,F,SA,SUSL,GN
11801JHS ETW EXPRESS19:4319:452M,TU,W,TH,F,SUUNRESERVED
59826BIX GWL PASS20:0920:112M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
02-06-2021
North Central Railway registers 43% growth in freight revenue in April-May 56% increase in loaded tonnage ,despite Covid

उत्‍तरमध्‍य रेलवे

जनसम्‍पर्क कार्यालय            

                  उत्‍तरमध्‍य रेलवे,प्रयागराज

पत्रांक: 11पीआर/06/2021                                               प्रेस विज्ञप्ति                                                दिनांक:01.06.2021

NCR registers 43% growth in freight revenue in Apri-May

56% growth in tonnage loaded, despite COVID

 

As the financial year 2021-22 sets in, the nation was caught in the grip of second wave of COVID, posing a stiff challenge to the pace of o­ngoing economic activities.

North Central Railways, besides responding to the pandemic through its medical infrastructure, sets new benchmark by recording a 56% increase in freight loading in April-May as compared to the corresponding period of previous year.

Chief Commercial Manager/Freight Marketing, NCR Smt Anu Mani Tripathi while sharing the data told that the Railway strived hard to ensure loading of essential commodities and other freight mix should not get hampered o­n account of the pandemic. All COVID related protocols were strictly implemented at all the goods shed and sidings where handling of consignments take place.

"Our officers in the field are leading from the front and maintaining close liason with the industry to cater it's demand", said Anu Mani Tripathi.

In terms of tonnage loaded, NCR showed an increase of 56% in April-May 2021 as compared to this period in 2020, while in terms of revenue earned, NCR shows an increase of 43% over previous year.

Cumulative earnings this year stood at Rs 286.44 crores as against Rs. 200.75 crores in April-May 2020.

Among the commodities registering an upward growth were Petroleum loading from Rasulpur (near Kanpur, Jhansi Division), Cement loading from Chunar and Parichha and DOC loading from Ramgarh (Agra Division) and Morena(Jhansi Division). However, the main trigger in the growth is attributed to container loading from various depots like Dadri, Kanpur (both Prayag raj Division) and Malanpur( Jhansi Division).

"As a result of aggressive freight marketing measures undertaken in the form of offering discounts under 'Station to Station concession scheme' , we are able to attract incremental traffic of foodgrains from places like Etah, Datia, Dabra, Morena, Hodal and Harpalpur", informed CCM FM.

"While foodgrain loading stood at 67 (number of rakes) in April-May 2020, this year 94 rakes of food grains have been loaded in this period" informed Shri P.K.Ojha, Chief Freight Traffic Manager(CFTM)/NCR, head of Business Development Unit(BDU), NCR. "In addition to it, number of rakes of ballast loaded in NCR has also registered an increase from 26 to 37 rakes in these opening two months of the financial year as compared to previous year", he added.

Upon achieving the milestone, GM NCR Shri V.K. Tripathi says that although a positive trend is palpable in first two months still we have to go a long way and have to maintain the pace throughout the financial years. Shri Tripathi also said that an analysis should be done regarding commodities which have shown a dip in loading and all out efforts should be made by BDUs to revive it.

 





2
10-12-2020
Focus on Safety and Mobility-North Central Railway completed many important works in November-2020

North Central Railway

Headquarter

Public Relations

Prayagraj

 

No. 11PR/12/2020                            Press ReleaseDate: 03.12.2020

 

Focus o­n Safety and Mobility-North Central Railway completed many important works in November-2020

 

Despite o­ngoing Covid-19 pandemic, North Central Railway achieved many milestones in November-2020. Besides surpassing last year originating freight loading and achieving highest interchange of 532 freight trains o­n 30.11.20, NCR also completed many important works of infrastructure development and safety related maintenance of assets during November-2020.

 

For safety of road users 04 RUBs o­ne each in Prayagraj- Kanpur, Shikohabad-Farukhabad, Mathura-Alwar and Dholpur-Agra sections were commissioned in Nov’20 and so far, 09 RUBs have been commissioned in the current financial year. Manned level crossing no.58 in Kanpur-Tundla section was closed during the month and total 28 manned level crossings have been closed in current financial year till November-2020. Provision of power lifting barriers at two level crossings, sliding booms at two level crossings and secured communication between station and gateman at 08 LCs are other important road user safety works completed in November-2020.

 

North central Railway operates more than 120 trains at 130 Kmph or higher speeds and its trunk routes carry very density freight and passenger traffic. This calls for impeccable maintenance of track and other assets. In November-2020, 38 kms track renewal was done with cumulative renewal of283 kms track in current financial year.To enhance safety and speed of trains over point and crossing zone, 08 nos. thick web switches have been provided in Nov’2020 and so far, 30 thick web switches have been commissioned in FY 2020-21.

 

46 routes electronic interlocking (EI) at Mauranipur station in Jhansi division commissioned in November 2020. With completion of this work all electro-mechanical signaling in Jhansi-Banda section have been replaced with latest electronic interlocking/ panel interlocking/ standard-IIIinterlocking. Similarly, commissioning of 45 routes EI at Malanpur station o­n 10.11.20 paved the way for replacement of electro-mechanical signaling in Gwalior-Bhind section. In November 11.88 km route between Prempur and Aung stations o­n Prayagraj division was equipped with automatic signaling which will enhance train handling capacity in this section.

 

In the field of rolling stock maintenance,intermediate overhauling (IOH) of 32coaches, shop schedule (SS-I) of25LHB coaches, periodic overhauling(POH) of 30 coaches, routine overhauling (ROH) of 288 wagons and periodicoverhauling (POH) of 751wagons were done by depots and workshops of NCR in November- 2020 to ensure safe and detention free train operations.

 

In view of foggy and cold weather, safety seminars o­n prevention of signal passing at danger (SPAD); safe train operation during foggy weather; precaution to taken during shunting operation; precautions for workman at worksite and cold weather patrolling and action to be taken in case of rail fracture etcwere organized at different stations, crew lobbies, yards etc. of Agra, Jhansi and Prayagraj division.

 








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search