For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

Lodhi Colony

STATION INFO

Address: Najaf Khan Rd, Block 23, BK Dutt Colony, New Delhi, Delhi 110003 Delhi NCT

Station Code: LDCY)Lodhi Colon

Station Name: LDCY)Lodhi Colony

Zone: NR/Northern

Total Unique Trains: 5

Train Frequency Weekly: 27

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
64094SSB NZM SSB EMU09:0009:011M,TU,W,TH,F,SA,SUUNRESERVED
64093NZM SSB EMU09:5609:571M,TU,W,TH,F,SA,SUUNRESERVED
64095NDLS SSB EMU10:2210:231M,TU,W,TH,FUNRESERVED
64096SSB NZM EMU11:2811:291M,TU,W,TH,FUNRESERVED
64098SSB NZM SSB EMU18:3018:311M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
27-01-2022
SOUTH EASTERN RAILWAY CELEBRATES 73rd REPUBLIC DAY

दक्षिणपूर्वरेलवे

SOUTH EASTERN RAILWAY

प्रेसविज्ञप्ति

PRESS RELEASE

SOUTH EASTERN RAILWAY CELEBRATES 73rd REPUBLIC DAY

Kolkata, 26th January, 2022:

The 73rd Republic Day was celebrated at South Eastern Railway’s Headquarters, Garden Reach with due solemnity. The whole programme was organized with strict compliance of COVID-19 Health Protocols.

 

 

Ms. Archana Joshi, General Manager, South Eastern Railway unfurled the National Tri-colour and took salute at the ceremonial parade presented by the contingents of Railway Protection Force, Civil Defence and St John Ambulance.

 

Addressing the staff and officers of SER, Ms. Archana Joshi said that railway employees have been rendering commendable service during the Covid 19 pandemic. Keeping in view the nation-wide crisis during the COVID pandemic, SER arranged to run 281 Oxygen Special Trains to fulfill its social commitments and responsibilities. Moreover, to ensure uninterrupted supply of oxygen at SER Central Hospital, Garden Reach, an Oxygen Tank of 13,000 liters capacity along with central medical gas pipeline have been installed. 

General Manager stated that SER’s Freight Loading performance in 2020-21 had been spectacular and this railway loaded 175.8 million tonnes of freight which was the highest ever loading after trifurcation of this railway. In the current financial year, S E Railway has loaded 143.31 million tonnes of freight upto December, 2021 which is about 15% more than the loading achieved during the corresponding period of last financial year.

 

In the year 2020-21, SER further expanded its network with 102.3 km Doubling/tripling of railway tracks. During the current financial year i.e. 2021-22, Bisra-Bondamunda third line work and Balsiring-Lodhma double line work have been completed. General Manager added that with the electrification of Tatanagar-Badampahar section, SE Railway has completed electrification work of 98.8% of its Railway Track.

With a view to provide more amenities to the passengers, during the last financial year (2020-21) and till the month of December, 2021 of the current financial year, platforms have been raised at 25 stations and extended at 5 stations. Apart from this, 24 new Foot Over Bridges have been constructed including the modern 6 metre wide FOB at Santragachi and Kharagpur stations.

 

 

 

In addition, the circulating area at 11 stations has been improved. Moreover, as a part of Digital India Mission, high speed Wi-Fi connectivity has been provided at 247 stations.

 

General Manager stated that safety and security of the travelling passengers is of paramount importance. Keeping in view the safety and comfort of the passengers, 54 rakes of 42 long distance trains have been replaced with LHB coaches. Moreover, during the current financial year altogether 27 Manned Level Crossings have been eliminated by constructing Limited Height Subways(LHS), Road Over Bridges(ROB) and through diversion of road traffic.

 

South Eastern Railway has installed 1781 CCTV cameras at 53 stations to keep close vigil in and around stations. In addition, “My Saheli” and “Nanhe Farishte” security initiatives have proved to be of immense benefit for the security of women and children. Moreover, special emphasis has been laid o­n escorting of night trains and ladies coaches.

A cultural programme o­n patriotic theme was organised o­n the occasion. The programme was presented by the Personnel Department and members of SER Bharat Scouts and Guides. Republic Day was also celebrated at the Divisional Offices at Kharagpur, Adra, Chakradharpur and Ranchi.

 

…….





2
16-06-2021
SER LAYS EMPHASIS ON MODERNISATION OF SIGNALLING SYSTEM

दक्षिणपूर्वरेलवे

SOUTH EASTERN RAILWAY

प्रेसविज्ञप्तिPRESS RELEASE

SER LAYS EMPHASIS o­n MODERNISATION OF SIGNALLING SYSTEM

 

Kolkata, 16th June, 2021:

 

South Eastern Railway has been constantly laying emphasis o­n modernisation of signalling system to enhance safety and capacity in train operations. Up-gradation of signalling system is a continuous process and helps to facilitate train operations at higher speed and even in inclement weather. A modernised signalling system not o­nly ensures safety in train operations but also helps to provide seamless operation.

 

SER has been laying stress o­n modernisation and up-gradation with Electronic Interlocking, Route Relay Interlocking and Panel Interlocking works to make train operations safer and more efficient.

[

Keeping in view the advantages of modern signalling system, South Eastern Railway during the year 2020-21 has commissioned/modified/replaced the following signalling systems within its jurisdiction:

·New Interlocking System has been commissioned at 26 stations viz. Rajkharswan, Bahalda Road, Joychandipahar etc.

·Old Relay Interlocking Systems have been replaced by New Interlocking Systems at 9 stations viz. Ghatsila, Amta etc.

·Mechanical Lever Frame Interlocking Systems have been replaced by Electronic Interlocking Systems at 12 stations viz. Garbeta, Talgoria, Bokaro, Lodhma etc.

 

In the financial year 2021-22, SER has also planned the following signal up-gradation works to be completed:

·Route Relay Interlocking with Electronic Interlocking will be completed at Adra staion.

·Panel Interlocking is targeted to be completed at Haludpukur and Aunlajhori stations.

·Electronic Interlocking Work is targeted to be completed at Bondamunda, Muradih, Domjur, Bargachia, Birarajpur and Adra Stations.

 

In addition, CTC (Centralised Traffic Control) has also been planned in Howrah-Kharagpur Section for faster movement of train service. All these modernisation works will make this railway future ready in train operation and safety aspect.








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search