|
||||||||||||||||||||||||||||||||||||||||||||
RECENT NEWS
1
www.swr.indianrailways.gov.in- 2021-03-01
दकà¥à¤·à¤¿à¤£ पशà¥à¤šà¤¿à¤® रेलवे/ SOUTH WESTERN RAILWAY पà¥à¤°à¥‡à¤¸ विजà¥à¤žà¤ªà¥à¤¤à¤¿/ Press Release No. 397 Dt: 28.02.2021 LAUNCHING OF FOUR LIMITED HEIGHT SUBWAYS (LHS) AND TWO ROAD UNDER BRIDGES (RUBS) oÂn SWR TRACK IN BETWEEN KALEM TO MADGAON SECTION IN GOA Rail Vikas Nigam Limited has Launched Four Limited Height Subways and two Road Under Bridges between Kalem and Madagaon. As the existing railway track was laid more than 100 years ago, many towns have developed oÂn both sides of Railway track, especially between Kulem and Madgaon railway stations. Residents of these areas were facing lot of inconvenience in crossing of railway tack and had to travel many kilometres for level crossings. Keeping this aspect in view, as suggested by Shri A.K. Singh, GM/SWR during an inspection, four Limited Height Subways (211B, 220A, 209A & 227A) and two Road Under Bridges (206A & 207A) in between Kalem- Sanvordem- Chandergao- Madgaon Section was carried out under Londa-Vasco Da Gama doubling project. The RCC Box of double line portion of Br. No. 220A to 211B, 227A was casted in situ and the running line portion was also fabricated at site. However, the work could not be executed due to outbreak of Corona virus and the subsequent nationwide lockdown as everything was almost oÂn a grinding halt from March 2020 to September 2020. Later, RVNL executed the launching work beginning from 03.02.21 to 23.02.21. Within these twenty days four LHS and two RUBs were completed well within the 05 Hrs allotted block smoothly and safely, which is a record feat in the launching track record of South Western Railways. These works were carried out under the guidance of Shri P.K. Kshatriya, Chief Project Manager/RVNL & Shri Sashibhusan Sahoo, GM/RVNL. 1. The first LHS was constructed at Curchorem oÂn 03.02.2021, in view of LC no. 16. The LHS links to two Village roads oÂn either sides and would facilitate smooth passage to a population of around three thousand people. 2. The second LHS constructed was at Guirdolim-Chandor crossing in lieu of LC No. 18 oÂn 06.02.2021. This crossing being oÂne of the busy crossing points, would stand to benefit large number of people using this axis as main throughfare. 3. On 10.02.2021, an important LHS was launched at Kamral Village connecting a portion of the Village which was landlocked between a river and a Railway track. The landlocked Village having about 60-70 houses have now been connected after decades of isolation wherein they couldn’t have access to the Village road, except by passing through the Railway track. 4. On 14.02.2021 and 18.02.2021, two important Road Under Bridges were constructed to connecting Madel, Mirabaag and Costim Villages with Curchorem-Collem road. These two RUBs will provide smooth crossing of the Railway line with all types of vehicles and would facilitate a population of about five thousand people. 5.The last and final LHS was constructed at Sao Jose De Areal oÂn 23.02.2021. This LHS would provide great relief to the Villagers oÂn either side who require to cross the Railway line either for cultivation as well as access to the Church. The LHS was in fulfilment of long-standing desire by the Villagers for having smooth and safe passage to cross the Railway line. The list of LHS & RUBs launched are furnished below:
Chief Public Relations Officer 2
www.swr.indianrailways.gov.in- 2020-09-22
दकà¥à¤·à¤¿à¤£ पशà¥à¤šà¤¿à¤® रेलवे/ SOUTH WESTERN RAILWAY पà¥à¤°à¥‡à¤¸ विजà¥à¤žà¤ªà¥à¤¤à¤¿/ Press Release No. 224 Dt: 16.09.2020 CLONE TRAINS FROM SOUTH WESTERN RAILWAY As per railway Board’s instructions following clone trains will be run by South Western Railway to meet high demand by passengers for trains which are already running in these routes. - 1. Train No.06509/06510 KSR Bengaluru – Danapur – KSR Bengaluru special Weekly Express:- Train No.06509 KSR Bengaluru – Danapur Express Special departs from KSR Bengaluru at 08.00 hrs oÂn Mondays to reach Danapur at 08.00 hrs oÂn Wednesdays. The first service of the train from KSR Bengaluru starts oÂn 21.09.2020. In the return direction, Train No.06510 Danapur – KSR Bengaluru Express Special departs from Danapur at 18.10 hrs oÂn Wednesdays to reach KSR Bengaluru at 18.20 hrs oÂn Fridays. The First Service of the train from Danapur starts oÂn 23.09.2020. The train will have stoppages at Jolarpettai, Katpadi, Chennai, Vijayawada, Warangal, Balharshah, Nagpur, Itarsi, Jabalpur, Satna, Prayagraj Cheoki, Deendayal Upadhyaya Jn and Ara in both directions. 2. Train No.06523/06524 Yesvantpur – H. Nizamuddin – Yesantpur Special Bi-weekly Express:- Train No.06523 Yesvantpur – H. Nizamuddin Bi-weekly Express Special Departs from Yesvantpur at 13.55 hrs oÂn Wednesdays and Saturdays to reach H. Nizamuddin at 13.20 hrs oÂn Fridays and Mondays. The first service of the train starts from Yesvantpur oÂn 23.09.2020. In the return direction, Train No.06524 H. Nizamuddin – Yesvantpur Bi-weekly Express departs from H. Nizamuddin at 07.00 hrs oÂn Saturdays and Tuesdays to reach Yesvantpur at 04.20 Hrs oÂn Mondays and Thursdays. The first service of the train from H. Nizamuddin starts oÂn 26.09.2020. The train will have stoppages at Arsikere, Hubballi, Belagavi, Miraj, Pune, Manmad, Bhusaval, Bhopal and Jhansi in both diections. The above clones are fully reserved trains which will have a composition of 12 Three Tier AC Coaches 4 Three Tier Second Class Sleeper Coaches and Two Break Luggage and Generator Cars (Total: 18 LHB Coaches) These trains will be in addition to special trains which are already running. Humsafar Rakes are utilized to run these trains. The fare will be charged as Humsafar Express. The ARP (Advanced Reservation Period) will be 10 days. 3. Train No.07379/07380 Vasco-da-Gama – H. Nizamuddin – Vascodagama Special Weekly Express: - Train No.07370 Vasco-da-Gama – H. Nizamuddin Weekly Express Special departs from Vasco-da-Gama at 12.30 hrs oÂn Fridays to reach H. Nizauddin at 04.20 hrs oÂn Sundays. The first service of the train starts from Vasco-da-Gama oÂn 25.09.2020 In the return direction, Train No.07380 H. Nizamuddin – Vasco-da-gama Weekly Express Special departs from H. Nizamuddin at 13.00 hrs oÂn Sundays and arrives at Vasco-da-Gama at 04.45 hrs oÂn Tuesdays. The first service of the train starts from H. Nizamuddin starts oÂn 27.09.2020 The train will have stoppages at Madagaon, Londa, Belagavi, Miraj, Pune, manmad, Bhusaval, Itarsi, Bhopal, Jhansi and Agra Cantt in both directions.
Chief Public Relations Officer
COMMENTS
NO Comments. Be the first to Comment...
|