For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

BHIND

STATION INFO

Address: Bhind Railway Station, Bhind, Madhya Pradesh 477001, India

Station Code: BIX)BHIN

Station Name: BIX)BHIND

Zone: NCR/North Central

Total Unique Trains: 12

Train Frequency Weekly: 63

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
11802ETW JHS LINK EXP05:5205:542M,TU,W,TH,F,SAUNRESERVED
59823GWL BIX PASS08:50Des--M,TU,W,TH,F,SA,SUUNRESERVED
21125INDORE BHIND EXP09:50Des--TU,F,SA2A,3A,SL,GN
59821KOTA BIX PASS14:40Des--M,TU,W,TH,F,SA,SUSL,GN
59825GWL BIX PASS16:55Des--M,TU,W,TH,F,SA,SUUNRESERVED
59828BHIND PASS18:30Des--M,TU,W,TH,F,SA,SUSL,GN
11801JHS ETW EXPRESS20:4320:452M,TU,W,TH,F,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure
21126BIX RTM EXPSrc17:00--W,SA,SU2A,3A,SL,GN
59827ETAWAH PASSSrc15:00--M,TU,W,TH,F,SA,SUSL,GN
59822BIX KOTA PASSSrc18:10--M,TU,W,TH,F,SA,SUSL,GN
59824BIX GWL PASSSrc09:55--M,TU,W,TH,F,SA,SUUNRESERVED
59826BIX GWL PASSSrc18:50--M,TU,W,TH,F,SA,SUUNRESERVED



RECENT NEWS

1
12-08-2021
Shri Ashutosh joins as DRM, Jhansi

उत्‍तर मध्‍य रेलवे

जनसम्‍पर्क कार्यालय

उत्‍तर मध्‍य रेलवे

प्रयागराज

पत्रांक:11पीआर/08/2021              प्रेसविज्ञप्ति                दिनांक: 10.08.2021

Shri Ashutosh joins as DRM, Jhansi

On 10.08.2021, Shri Ashutosh, an officer of the Indian Railway Engineering Service has, assumed the charge of DRM, Jhansi (NCR). Shri Ashutosh has worked as Chief Engineer (Construction) and Principle Chief Engineer, Railway Electrification in Prayagraj.

 

Shri Ashutosh is an alumni of IIT/Kanpur from where he did his BTech in 1989. Shri Ashutosh has worked as Senior Divisional Engineer/Coordination in Agra Division and as ADRM in Ahmedabad Division of Western Railway. Mr. Ashutosh is well acquainted with Jhansi Division. He has worked here as Deputy Chief Engineer/Bridge from 2009 to 2011. During this period he undertook various projects like construction of Foot Over Bridges (FOBs) at stations like Madraha, Bhind, Chitrakoot etc. Apart from this, Pedestrian Pathway o­n the bridges of Sindh and Chambal situated o­n Jhansi-Agra section and inspection pathway o­n two bridges of Yamuna o­n Jhansi-Kanpur, Khairar Bhimsen sections were also constructed during his tenure.

Shri Ashutosh, while working as Chief Engineer (Construction), executed the works of Jhansi-Bina third line, Gwalior Sheopur Kalan gauge conversion (gauge conversion) and Jhansi Manikpur line doubling. Apart from this, yard remodelling and Goods Shed in Rayaru, Road Over Bridges (ROB) at Gwalior, Datia, Sipri etc., renovation of Chirula station and construction of many Road Over Bridges (RUBs) has also been credited to his name.

During the tenure of Mr. Ashutosh's Senior Divisional Engineer/Coordination Agra, Palwal-Bhuteshwar third line, stretchy bridge regirdring in Agra, Agra Cantt yard remodeling, Tundla flyover and road bridges were constructed at many places. New records were set up in rail renewal by PQRS method o­n Agra-Mathura section. He got appreciation by Member Engineering, Railway Board for significant improvement in track maintenance and significant increase in Track Geometry Index (TGI).

During the tenure of Shri Ashutosh as ADRM in Ahmadabad Division of Western Railway, new line, doubling, gauge conversions by various executive agencies like Western DFC, RVNL, Western Railway/Construction, Metro Rail (MEGA), Rail Electrification, RITES, IRSDC gauge conversion, rail electrification, metro rail and Gandhinagar station redevelopment works were executed. Shri Ashutosh established better coordination with all the above executive agencies so that unprecedented progress could be made in the works of rail infrastructure.

Shri Ashutosh, during his tenure as Chief Engineer/Construction, got the infrastructure works done in Prayagraj Mahakumbh 2019 like 4 huge passenger sheds in the station premises, Skywalk to connect FOB, Multi-storey building and many road overhead bridges in a time bound manner so that Mahakumbh was organized successfully. Shri Ashutosh also has experience in concrete sleeper production and overhauling of track machines. Shri Ashutosh has been awarded by the Railway Minister Rajbhasha Puraskar in 2017.

Byjoining of Shri Ashutosh as DRM Jhansi, it ios expected that infrastructure works will be expedited.

GM/NCR Shri Pramod Kumar congratulated Shri Ashutosh for the prestigious assignment and extended his best wishes for him.

 

 





2
10-12-2020
Focus on Safety and Mobility-North Central Railway completed many important works in November-2020

North Central Railway

Headquarter

Public Relations

Prayagraj

 

No. 11PR/12/2020                            Press ReleaseDate: 03.12.2020

 

Focus o­n Safety and Mobility-North Central Railway completed many important works in November-2020

 

Despite o­ngoing Covid-19 pandemic, North Central Railway achieved many milestones in November-2020. Besides surpassing last year originating freight loading and achieving highest interchange of 532 freight trains o­n 30.11.20, NCR also completed many important works of infrastructure development and safety related maintenance of assets during November-2020.

 

For safety of road users 04 RUBs o­ne each in Prayagraj- Kanpur, Shikohabad-Farukhabad, Mathura-Alwar and Dholpur-Agra sections were commissioned in Nov’20 and so far, 09 RUBs have been commissioned in the current financial year. Manned level crossing no.58 in Kanpur-Tundla section was closed during the month and total 28 manned level crossings have been closed in current financial year till November-2020. Provision of power lifting barriers at two level crossings, sliding booms at two level crossings and secured communication between station and gateman at 08 LCs are other important road user safety works completed in November-2020.

 

North central Railway operates more than 120 trains at 130 Kmph or higher speeds and its trunk routes carry very density freight and passenger traffic. This calls for impeccable maintenance of track and other assets. In November-2020, 38 kms track renewal was done with cumulative renewal of283 kms track in current financial year.To enhance safety and speed of trains over point and crossing zone, 08 nos. thick web switches have been provided in Nov’2020 and so far, 30 thick web switches have been commissioned in FY 2020-21.

 

46 routes electronic interlocking (EI) at Mauranipur station in Jhansi division commissioned in November 2020. With completion of this work all electro-mechanical signaling in Jhansi-Banda section have been replaced with latest electronic interlocking/ panel interlocking/ standard-IIIinterlocking. Similarly, commissioning of 45 routes EI at Malanpur station o­n 10.11.20 paved the way for replacement of electro-mechanical signaling in Gwalior-Bhind section. In November 11.88 km route between Prempur and Aung stations o­n Prayagraj division was equipped with automatic signaling which will enhance train handling capacity in this section.

 

In the field of rolling stock maintenance,intermediate overhauling (IOH) of 32coaches, shop schedule (SS-I) of25LHB coaches, periodic overhauling(POH) of 30 coaches, routine overhauling (ROH) of 288 wagons and periodicoverhauling (POH) of 751wagons were done by depots and workshops of NCR in November- 2020 to ensure safe and detention free train operations.

 

In view of foggy and cold weather, safety seminars o­n prevention of signal passing at danger (SPAD); safe train operation during foggy weather; precaution to taken during shunting operation; precautions for workman at worksite and cold weather patrolling and action to be taken in case of rail fracture etcwere organized at different stations, crew lobbies, yards etc. of Agra, Jhansi and Prayagraj division.

 








COMMENTS

1
12-08-2021
Shri Ashutosh joins as DRM, Jhansi

उत्‍तर मध्‍य रेलवे

जनसम्‍पर्क कार्यालय

उत्‍तर मध्‍य रेलवे

प्रयागराज

पत्रांक:11पीआर/08/2021              प्रेसविज्ञप्ति                दिनांक: 10.08.2021

Shri Ashutosh joins as DRM, Jhansi

On 10.08.2021, Shri Ashutosh, an officer of the Indian Railway Engineering Service has, assumed the charge of DRM, Jhansi (NCR). Shri Ashutosh has worked as Chief Engineer (Construction) and Principle Chief Engineer, Railway Electrification in Prayagraj.

 

Shri Ashutosh is an alumni of IIT/Kanpur from where he did his BTech in 1989. Shri Ashutosh has worked as Senior Divisional Engineer/Coordination in Agra Division and as ADRM in Ahmedabad Division of Western Railway. Mr. Ashutosh is well acquainted with Jhansi Division. He has worked here as Deputy Chief Engineer/Bridge from 2009 to 2011. During this period he undertook various projects like construction of Foot Over Bridges (FOBs) at stations like Madraha, Bhind, Chitrakoot etc. Apart from this, Pedestrian Pathway o­n the bridges of Sindh and Chambal situated o­n Jhansi-Agra section and inspection pathway o­n two bridges of Yamuna o­n Jhansi-Kanpur, Khairar Bhimsen sections were also constructed during his tenure.

Shri Ashutosh, while working as Chief Engineer (Construction), executed the works of Jhansi-Bina third line, Gwalior Sheopur Kalan gauge conversion (gauge conversion) and Jhansi Manikpur line doubling. Apart from this, yard remodelling and Goods Shed in Rayaru, Road Over Bridges (ROB) at Gwalior, Datia, Sipri etc., renovation of Chirula station and construction of many Road Over Bridges (RUBs) has also been credited to his name.

During the tenure of Mr. Ashutosh's Senior Divisional Engineer/Coordination Agra, Palwal-Bhuteshwar third line, stretchy bridge regirdring in Agra, Agra Cantt yard remodeling, Tundla flyover and road bridges were constructed at many places. New records were set up in rail renewal by PQRS method o­n Agra-Mathura section. He got appreciation by Member Engineering, Railway Board for significant improvement in track maintenance and significant increase in Track Geometry Index (TGI).

During the tenure of Shri Ashutosh as ADRM in Ahmadabad Division of Western Railway, new line, doubling, gauge conversions by various executive agencies like Western DFC, RVNL, Western Railway/Construction, Metro Rail (MEGA), Rail Electrification, RITES, IRSDC gauge conversion, rail electrification, metro rail and Gandhinagar station redevelopment works were executed. Shri Ashutosh established better coordination with all the above executive agencies so that unprecedented progress could be made in the works of rail infrastructure.

Shri Ashutosh, during his tenure as Chief Engineer/Construction, got the infrastructure works done in Prayagraj Mahakumbh 2019 like 4 huge passenger sheds in the station premises, Skywalk to connect FOB, Multi-storey building and many road overhead bridges in a time bound manner so that Mahakumbh was organized successfully. Shri Ashutosh also has experience in concrete sleeper production and overhauling of track machines. Shri Ashutosh has been awarded by the Railway Minister Rajbhasha Puraskar in 2017.

Byjoining of Shri Ashutosh as DRM Jhansi, it ios expected that infrastructure works will be expedited.

GM/NCR Shri Pramod Kumar congratulated Shri Ashutosh for the prestigious assignment and extended his best wishes for him.

 

 





2
10-12-2020
Focus on Safety and Mobility-North Central Railway completed many important works in November-2020

North Central Railway

Headquarter

Public Relations

Prayagraj

 

No. 11PR/12/2020                            Press ReleaseDate: 03.12.2020

 

Focus o­n Safety and Mobility-North Central Railway completed many important works in November-2020

 

Despite o­ngoing Covid-19 pandemic, North Central Railway achieved many milestones in November-2020. Besides surpassing last year originating freight loading and achieving highest interchange of 532 freight trains o­n 30.11.20, NCR also completed many important works of infrastructure development and safety related maintenance of assets during November-2020.

 

For safety of road users 04 RUBs o­ne each in Prayagraj- Kanpur, Shikohabad-Farukhabad, Mathura-Alwar and Dholpur-Agra sections were commissioned in Nov’20 and so far, 09 RUBs have been commissioned in the current financial year. Manned level crossing no.58 in Kanpur-Tundla section was closed during the month and total 28 manned level crossings have been closed in current financial year till November-2020. Provision of power lifting barriers at two level crossings, sliding booms at two level crossings and secured communication between station and gateman at 08 LCs are other important road user safety works completed in November-2020.

 

North central Railway operates more than 120 trains at 130 Kmph or higher speeds and its trunk routes carry very density freight and passenger traffic. This calls for impeccable maintenance of track and other assets. In November-2020, 38 kms track renewal was done with cumulative renewal of283 kms track in current financial year.To enhance safety and speed of trains over point and crossing zone, 08 nos. thick web switches have been provided in Nov’2020 and so far, 30 thick web switches have been commissioned in FY 2020-21.

 

46 routes electronic interlocking (EI) at Mauranipur station in Jhansi division commissioned in November 2020. With completion of this work all electro-mechanical signaling in Jhansi-Banda section have been replaced with latest electronic interlocking/ panel interlocking/ standard-IIIinterlocking. Similarly, commissioning of 45 routes EI at Malanpur station o­n 10.11.20 paved the way for replacement of electro-mechanical signaling in Gwalior-Bhind section. In November 11.88 km route between Prempur and Aung stations o­n Prayagraj division was equipped with automatic signaling which will enhance train handling capacity in this section.

 

In the field of rolling stock maintenance,intermediate overhauling (IOH) of 32coaches, shop schedule (SS-I) of25LHB coaches, periodic overhauling(POH) of 30 coaches, routine overhauling (ROH) of 288 wagons and periodicoverhauling (POH) of 751wagons were done by depots and workshops of NCR in November- 2020 to ensure safe and detention free train operations.

 

In view of foggy and cold weather, safety seminars o­n prevention of signal passing at danger (SPAD); safe train operation during foggy weather; precaution to taken during shunting operation; precautions for workman at worksite and cold weather patrolling and action to be taken in case of rail fracture etcwere organized at different stations, crew lobbies, yards etc. of Agra, Jhansi and Prayagraj division.

 





1
- Fri Mar 4 9:57 2016
Etawah to bhind train

2
- Fri Mar 4 9:57 2016
Etawah to bhind train


Add Comment






Submit


Latest Search