For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








22 Trains from (TUNG)TUNG to (SAD)SONADA


Address: West Bengal 734224, India

Station Code: TUNG

Station Name: TUNG

Zone: NFR/Northeast Frontier

Train Frequency Weekly: 37

Station Traffic: Low

Address: Sonada, West Bengal 734209, India

Station Code: SAD

Station Name: SONADA

Zone: NFR/Northeast Frontier

Train Frequency Weekly: 37

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
52587KGN DJ NG TRAINKGN06:30SAD07:461:16M,TU,W,TH,F,SA,SUFC,2S,GN,52587 Status
52540DJ NJP PASSENGERGHUM08:35SAD09:150:40M,TU,W,TH,F,SA,SUFC,CC,GN,52540 Status
52570RED PANDADJ09:15KGN12:303:15TU,TH,SUFC,GN,52570 Status
52543NJP KGN PASS N GSN09:23RTG09:540:31M,TU,W,TH,F,SA,SUUNRESERVED52543 Status
52593JOYRIDE STEAMDJ09:40GHUM10:300:50M,TU,W,TH,F,SA,SUFC52593 Status
52594JOYRIDE STEAMDJ10:00GHUM10:500:50M,TU,W,TH,F,SA,SUFC52594 Status
52591JOYRIDE DIESELDJ10:10GHUM10:550:45M,TU,W,TH,F,SA,SUFC52591 Status
52544DJ KGN NG TRAINGHUM10:50SAD11:350:45M,TU,W,TH,F,SA,SUUNRESERVED52544 Status
52574JOYRIDE DIESELDJ11:00GHUM11:450:45M,TU,W,TH,F,SA,SUFC,GN,52574 Status
52559JUNGLE SAFARISN11:20RTG11:500:30SA,SUFC,GN,52559 Status
52595JOYRIDE STEAMDJ12:10GHUM13:000:50M,TU,W,TH,F,SA,SUFC52595 Status
52596JOYRIDE STEAMDJ12:20GHUM13:100:50M,TU,W,TH,F,SA,SUFC52596 Status
52597JOYRIDE DIESELDJ12:45GHUM13:250:40M,TU,W,TH,F,SA,SUFC52597 Status
52541NJP DJ PASSENGERKGN12:56SAD14:041:08M,TU,W,TH,F,SA,SUFC,CC,GN,52541 Status
52575JOYRIDE DIESELDJ13:30GHUM14:150:45M,TU,W,TH,F,SA,SUFC,GN,52575 Status
52571RED PANDAKGN14:00DJ17:453:45TU,TH,SAFC,GN,52571 Status
52542KGN NJP PASS N GKGN14:30MHN15:000:30M,TU,W,TH,F,SA,SUUNRESERVED52542 Status
52545KGN DJ NG TRAINKGN15:00SAD16:181:18M,TU,W,TH,F,SA,SUUNRESERVED52545 Status
52598JOYRIDE STEAMDJ16:05GHUM16:550:50M,TU,W,TH,F,SA,SUFC52598 Status
52592JOYRIDE STEAMDJ16:10GHUM17:000:50M,TU,W,TH,F,SA,SUFC52592 Status
52599JOYRIDE DIESELDJ16:20GHUM17:000:40M,TU,W,TH,F,SA,SUFC52599 Status
52588DJ KGN NG TRAINGHUM16:35SAD17:150:40M,TU,W,TH,F,SA,SUFC,2S,GN,52588 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer




2
2023/05/2019-05-2023
Mega Block on 21.05.2023


Mega Block o­n 21.05.2023

Central Railway, Mumbai Division will operate Mega Block o­n its suburban sections carrying out various engineering and maintenance works o­n 21.05.2023 as under:
 
Matunga-Mulund Up and Dn fast lines from 11.05 am to 3.55 pm
 
Dn fast line services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 am to 3.35 pm will be diverted o­n Dn slow line between Matunga and Mulund stations halting as per their respective scheduled halts and fast trains beyond Thane will be re-diverted o­n Dn fast line and will arrive destination 15 minutes behind schedule.
 
Up fast line services leaving Thane from 10.50 am to 3.46 pm will be diverted o­n Up slow line between Mulund and Matunga halting as per their scheduled halts and will be re-diverted o­n Up fast line and will arrive destination 15 minutes behind schedule.

Panvel- Vashi Up and Dn harbour lines from 11.05 am to 4.05 pm
(Excluding Belapur/Nerul-Kharkopar line)

 
Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel from 10.33 am to 3.49 pm and Dn Harbour line services to Panvel/Belapur leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 9.45 am to 3.12 pm will remain cancelled.
 
Up Transharbour line services towards Thane leaving Panvel from 11.02 am to 3.53 pm and Dn Transharbour line services towards Panvel leaving Thane from 10.01 am to 3.20 pm will remain cancelled.
 
Special suburban trains will run o­n Chhatrapati Shivaji Maharaj Terminus Mumbai – Vashi section during the block period.
 
Transharbour line services will be available between Thane-Vashi/Nerul stations during the block period.
 
Suburban services between Belapur - Kharkopar and Nerul – Kharkopar will run as per schedule during the block period.
 
Passengers are requested to bear with the Railway Administration for the inconvenience caused due to this maintenance block.
--- ---
Date: May 19, 2023
PR No.2023/05/20
This press release is issued by the Public Relations department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai
--------------------------







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit