For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








66 Trains from (SVJR)SHIVAJINAGAR to (TNA)THANE


Address: Shivajinagar Railway Station, Narveer Tanaji Wadi, Shivaji Nagar, Pune, Maharashtra 411005, India

Station Code: SVJR

Station Name: SHIVAJINAGAR

Zone: CR/Central

Train Frequency Weekly: 111

Station Traffic: Medium

Address: Thane Junction, Station Road, Kopri, Thane East, Thane, Maharashtra 400601, India

Station Code: TNA

Station Name: THANE

Zone: CR/Central

Train Frequency Weekly: 648

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
16382CAPE MUMBAI EXPPUNE00:50TNA03:442:54M,TU,W,TH,F,SA,SU2A,3A,SL,GN,16382 Status
18519VSKP LTT EXPRESSPUNE01:00LTT04:403:40M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,18519 Status
12702HUSSAINSAGAR EXPUNE01:15KYN03:402:25M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12702 Status
11140GDG CSMT EXPPUNE01:30KYN03:582:28M,TU,W,TH,SA,SU1A,2A,3A,SL,GN,11140 Status
11044LOKAMANYA TT EXPPUNE02:05TNA05:022:57SA2A,3A,SL,GN,11044 Status
19201SC PBR EXPPUNE02:05KYN04:372:32W2A,3A,SL,GN,19201 Status
17204COA BVC EXPRESSPUNE02:05KYN04:372:32TH2A,3A,SL,GN,17204 Status
16614RAJKOT EXPRESSPUNE02:05KYN04:372:32TH2A,3A,SL,GN,16614 Status
17018RAJKOT EXPRESSPUNE02:05KYN04:372:32M,TU,SA2A,3A,SL,GN,17018 Status
11036SHARAVATI EXPPUNE02:20KYN04:472:27SU2A,3A,SL,GN,11036 Status
11022CHALUKYA EXPPUNE02:20KYN04:492:29M,TH,F2A,3A,SL,GN,11022 Status
11006CHALUKYA EXPPUNE02:20KYN04:472:27TU,W,SU2A,3A,SL,GN,11006 Status
12164CHENNAI EXPPUNE02:30KYN04:572:27M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12164 Status
12116SIDDHESWAR EXPPUNE02:55TNA05:322:37M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12116 Status
17317LOKAMANYA TT EXPPUNE03:05TNA06:333:28M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17317 Status
17412MAHALAXMI EXPPUNE03:35TNA06:272:52M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,17412 Status
22144BIDR CSTM SF EXPPUNE04:15TNA07:042:49TH,SA,SU1A,2A,3A,SL,GN,22144 Status
22108LATUR CSMT EXPPUNE04:15TNA07:042:49M,TU,W,F1A,2A,3A,SL,GN,22108 Status
16587YPR BKN EXPPUNE05:05KYN07:472:42F,SU2A,3A,SL,GN,16587 Status
19567VIVEK EXPPUNE05:05KYN07:472:42SU2A,3A,SL,GN,19567 Status
12493DARSHAN EXPRESSPUNE05:15KYN07:472:32SU1A,2A,3A,12493 Status
11010SINHAGAD EXPCCH06:35KYN08:452:10M,TU,W,TH,F,SA,SUCC,2S,GN,11010 Status
11024SAHYADRI EXPPMP07:40TNA11:123:32M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11024 Status
12126PRAGATI EXPRESSPUNE07:50TNA10:282:38M,TU,W,TH,F,SA,SUCC,2S,GN,12126 Status
17221COA LTT EXPRESSPUNE07:55LTT11:053:10W,SA2A,3A,SL,GN,17221 Status
12220DURONTO AC EXPPUNE07:55LTT11:053:10TU,F1A,2A,3A,12220 Status
14805BARMER AC EXPPUNE08:20KYN11:002:40M1A,2A,3A,14805 Status
22498SGNR HUMSAFAR SFPUNE08:20KYN11:002:40F3A22498 Status
17032MUMBAI EXPPUNE09:10KYN11:472:37M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,17032 Status
11042MUMBAI EXPRESSKK09:45TNA12:392:54M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11042 Status
20821SRC HUMSAFARPUNE10:30KYN13:573:27M3A20821 Status
11014LOKMANYA TT EXPPUNE10:45TNA13:382:53M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11014 Status
11026PUNE BSL EXPCCH12:00KYN15:123:12M,TU,W,TH,F,SA,SUCC,SL,2S,GN,11026 Status
11074CHENNAI LTT EXPPUNE12:00KYN15:023:02TU2A,3A,SL,GN,11074 Status
17321UBL LTT EXPPUNE12:00TNA16:134:13SA2A,3A,SL,GN,17321 Status
01447PUNE KRMI SPLPUNE12:10KYN14:472:37F3A,SL,GN,01447 Status
11008DECCAN EXPRESSKK15:30TNA18:282:58M,TU,W,TH,F,SA,SUCC,2S,GN,11008 Status
12939PUNE JAIPUR EXPPUNE15:30KYN18:202:50W,SU2A,3A,SL,GN,12939 Status
22943PUNE INDORE EXPCCH15:50KYN18:202:30M,TU,TH,F,SA2A,3A,SL,GN,22943 Status
11302UDYAN EXPPUNE16:00KYN18:522:52M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11302 Status
11030KOYNA EXPRESSCCH16:15TNA19:122:57M,TU,W,TH,F,SA,SUCC,2S,GN,11030 Status
16352NCJ MUMBAI EXPPUNE16:45TNA19:493:04TH,SU2A,3A,SL,GN,16352 Status
16340MUMBAI EXPRESSPUNE16:45TNA19:473:02M,TU,W,F2A,3A,SL,GN,16340 Status
16332MUMBAI EXPRESSPUNE16:45TNA19:473:02SA2A,3A,SL,GN,16332 Status
06051MAS ADI EXPPUNE17:20KYN21:103:50SA2A,3A,SL,GN,06051 Status
19311PUNE INDORE EXPCCH17:50BIRD21:283:38W,SU2A,3A,SL,GN,19311 Status
12128INTERCITY EXPPUNE18:25TNA20:241:59M,TU,W,TH,F,SA,SUCC,2S,GN,12128 Status
22106INDRAYANI EXPPUNE18:35TNA21:082:33M,TU,W,TH,F,SA,SUCC,2S,GN,22106 Status
16210AJMER EXPRESSPUNE18:50KYN21:272:37TU,TH2A,3A,SL,GN,16210 Status
16506GANDHIDHAM EXPPUNE18:50KYN21:272:37SA2A,3A,SL,GN,16506 Status
16508JODHPUR EXPRESSPUNE18:50KYN21:272:37M,W1A,2A,3A,SL,GN,16508 Status
16532GARIB NAWAZ EXPPUNE18:50KYN21:272:37F2A,3A,SL,GN,16532 Status
16534SBC JODHPUR EXPPUNE18:50KYN21:272:37SU2A,3A,SL,GN,16534 Status
11096AHIMSA EXPRESSPUNE19:50KYN22:172:27W1A,2A,3A,SL,GN,11096 Status
11092PUNE BHUJ EXPPUNE19:50KYN22:172:27M1A,2A,3A,SL,GN,11092 Status
11090PUNE BGKT EXPPUNE19:50KYN22:172:27SU1A,2A,3A,SL,GN,11090 Status
11088PUNE VERAVAL EXPPUNE19:50KYN22:172:27TH1A,2A,3A,SL,GN,11088 Status
11050AHMEDABAD EXPPUNE19:50KYN22:172:27SA2A,3A,SL,GN,11050 Status
11012NED LTT EXPRESSPUNE19:55TNA22:532:58TH2A,3A,SL,GN,11012 Status
11076BIDR LTT EXPPUNE19:55TNA22:532:58W2A,3A,SL,GN,11076 Status
11018KIK LTT EXPRESSPUNE19:55TNA22:532:58M2A,3A,SL,GN,11018 Status
51034CSMT FAST PASSCCH23:40TNA03:183:38M,TU,W,TH,F,SA,SU3A,SL,GN,51034 Status
51028FAST PASSENGERCCH23:40TNA03:173:37F,SA,SUSL,GN,51028 Status
51030BJP BB FAST PASCCH23:40TNA03:173:37M,TU,W,THSL,GN,51030 Status
11028MUMBAI MAILKK23:45TNA02:442:59M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11028 Status
11020KONARK EXPRESSPUNE23:50TNA02:573:07M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11020 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit