For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








30 Trains from (SIHO)SIHO to (BCA)BACHWARA JN


Address: Siho Railway Station, Siho, Bihar 843119, India

Station Code: SIHO

Station Name: SIHO

Zone: ECR/East Central

Train Frequency Weekly: 79

Station Traffic: Medium

Address: Bihar 851111, India

Station Code: BCA

Station Name: BACHWARA JN

Zone: ECR/East Central

Train Frequency Weekly: 251

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
19709KAVI GURU EXPMFP03:15BJU05:452:30M2A,3A,SL,GN,19709 Status
15098AMARNATH EXPMFP03:15BJU05:202:05TU2A,3A,SL,GN,15098 Status
15654JAMMU GHY EXPRESMFP03:40BJU05:452:05F2A,3A,SL,GN,15654 Status
13508GKP ASN EXPRESSMFP04:03BJU05:551:52SA3A,SL,GN,13508 Status
13510GD ASN EXPRESSMFP04:06BJU05:581:52W3A,SL,GN,13510 Status
15204LJN BJU EXPDOL05:22BCA07:121:50M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15204 Status
15232GONDIA BJU EXPMFP05:25BJU08:303:05M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15232 Status
12204SHC GARIB RATHMFP05:35DSS06:521:17W,SA,SU3A,CC,12204 Status
15910AVADH ASSAM EXPMFP06:31DSS08:031:32M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,15910 Status
15228MFP YPR EXPMFP07:25BJU09:252:00M1A,2A,3A,SL,GN,15228 Status
53132MFP SDAH PASSDUBH08:27BCA10:081:41M,TU,W,TH,F,SA,SUUNRESERVED53132 Status
11124GWL BJU MAILDOL10:54DSS12:031:09M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11124 Status
18181TATA CPR EXPMFP12:40BJU08:254:15M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18181 Status
15708ASR KIR EXPRESSDOL12:58BJU15:152:17M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15708 Status
09451GIMB BGP SPECIALMFP13:45BJU15:401:55F2A,3A,SL,GN,09451 Status
13022MITHILA EXPRESSDUBH14:18BCA16:272:09M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13022 Status
13158TIRHUT EXPRESSMFP14:40DSS15:561:16W2A,3A,SL,GN,13158 Status
15028MAURYA EXPRESSDOL14:47BCA17:022:15M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15028 Status
12554VAISHALI EXPMFP14:55DSS16:181:23M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12554 Status
15272JANSADHARAN EXPMFP15:15BJU17:402:25TUUNRESERVED15272 Status
18182CPR TATA EXPDOL16:07BCA18:112:04M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18182 Status
15048PURVANCHAL EXPMFP17:10BJU19:202:10M,TU,F,SU2A,3A,SL,GN,15048 Status
15052GKP KOLKATA EXPMFP17:30BJU19:201:50TH2A,3A,SL,GN,15052 Status
13020BAGH EXPRESSDOL20:29BCA22:181:49M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13020 Status
12492MAUR DHAWAJ EXPMFP20:35BJU22:452:10F3A,SL,GN,12492 Status
12522RAPTISAGAR EXPMFP21:10BJU23:102:00F2A,3A,SL,GN,12522 Status
15530ANVT SHC JANSADHARANMFP21:55BJU00:102:15THUNRESERVED15530 Status
14524HARIHARNATH EXPMFP23:25BJU02:303:05TU,SA3A,SL,GN,14524 Status
13420JANSEWA EXPRESSDOL23:27BCA00:421:15M,TU,W,TH,F,SA,SUSL,GN,13420 Status
15904CDG DBRG EXPRESSMFP23:30BJU02:102:40W,SU2A,3A,SL,GN,15904 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
20/2023-24 11-04-2023
Chennai
CORE (Central Organisation for Railway Electrification) CREATES HISTORY - ELECTRIFIES 4767 RKM OF BG NETWORK IN FINANCIAL YEAR 2022-23



CORE (Central Organisation for Railway Electrification) CREATES HISTORY - ELECTRIFIES 4767 RKM OF BG NETWORK IN FINANCIAL YEAR 2022-23

CORE ended the financial year 2022-23 o­n a high note with an unbeatable record of highest ever electrification of 4767 RKM (Route Kilometre).


Government of India has set a target to electrify the entire BG route by December 2023, taking into consideration inherent advantages of electric traction. CORE under the guidance of its General Manager, Shri Pramod Kumar scaled new heights by electrifying 4767 RKM in financial year 2022-23 surpassing its previous record of 4283 RKM in financial year 2021-22. To achieve this national mission, Central Organisation for Railway Electrification (CORE) is playing a pivotal role and working as a dedicated team, towards making the nation self-reliant by developing a safe, energy efficient, eco-friendly and economical rail transport system through its nine project units.


Other Public Sector Organisations and Zonal Railways are also involved in Railway Electrification. However, CORE has done the lion’s share of commissioning which is approximately 74% of overall electrification works carried out in the financial year 2022-23.


Secunderabad unit of CORE contributed 1050 RKM which is the highest ever electrification in the history of any project unit. This was followed by Bangalore unit which commissioned 713 RKM followed by Ahmedabad unit with 669 RKM. Jaipur contributed 670 RKM, New Jalpaigudi commissioned 580 RKM, Ambala commissioned 453 RKM, Chennai did 406 RKM, Lucknow contributed 194 RKM and Kolkata commissioned 31 RKM during the financial year 2022-23.


Apart from electrification of sections under the jurisdiction of various railways and in various States, CORE has been relentlessly targeting the commissioning of Traction Substations for strengthening the power supply system and ensuring smooth and safe train operations.  In the financial year 2022-23, a total of 61 Traction Substations (TSS) have been commissioned by CORE which a significant jump of 80 % compared to last financial year. Project units Secunderabad tops the list with 12 TSS. In other project units Bangalore commissioned 6 TSS, Ahmedabad commissioned 4 TSS, Jaipur commissioned 10 TSS, Ambala commissioned 6 TSS, Chennai commissioned 5 TSS, Lucknow commissioned 6 TSS, New Jalpaigudi commissioned 1 TSS and Kolkata commissioned 11 TSS. In the month of March alone, a total of 21 Traction Sub-Stations were commissioned in different railways which is a record for TSS commissioning o­n a monthly basis. Earlier, 11 Sub-Stations were commissioned in the month of January 2023.  This shows the importance CORE has attached to commissioning of Sub-Stations for smooth train operations.


 Similarly, in this financial year a total of 50 Tower Wagon Sheds have been commissioned which is a quantum jump of 212 % compared to the last financial year.  Tower Wagon sheds are an indispensable part of traction maintenance works and CORE is taking all out efforts to commission the balance tower wagon sheds at the earliest.


            In the financial year 2022-23, CORE has electrified many important sections, which will not o­nly increase the sectional capacity and operational speed but also provide impetus to the socio-economic development of the adjoining regions.


            An important electrified route from Prayagraj to Bhopal has been achieved with the electrification of Ishanagar-Udaipura section (75 RKM) apart from North Central Railway becoming 100% electrified.  With the electrification of the Sikar-Churu section (87 RKM), entire Shekhawati region, which is a major business and tourism hub, is now directly connection to Delhi o­n electric traction.


With the electrification of Shohratgarh-Pachpherwa-Subhagpur section (118 RKM) the entire alternative stretch from Gonda via Balrampur-Anand Nagar to Gorakhpur has been fully electrified.  At the same time entire State of Uttar Pradesh as well as NER have been fully electrified.


With the electrification of Pangri-Latur Road section (129 RKM), the entire stretch from Pune to Secunderabad via Kurduwadi, Latur Road and Vikarabad has been fully electrified. This will provide an alternative route to Pune-Wadi-Secunderabad section along with Central Railway being fully electrified.

            The entire main line connecting Bengaluru and Hubballi has been fully electrified resulting in seamless end to end connectivity for running of Vande Bharat express with the electrification of Nittur-Arsikere-Birur-Hosdurga & Chikjajur-Devarguda-Karajagi-Hubballi sections (244 RKM).  Trains from New Delhi to Bikaner can now run o­n fully electrified route with the electrification of Benisar-Napasar-Bikaner section (61 RKM). Meghalaya has been connected with the rest of India o­n electrified route with the electrification of Dudhnoi-Mendipathar (20 RKM) route which is a major achievement.


            Other important sections which were electrified include HoleAlur-Badami-Guledagudda (41 RKM), Bangarpet-Kolar-Chikkaballapur-Yelahanka (103 RKM), Dindigul-Palani (56 RKM), Karaikkudi-Manamadurai (61 RKM), Tiruchendur-Tirunelveli-Tenkasi (133 RKM), Virudhunagar-Tenkasi-Sengottai-Bhagwatipuram (136 RKM), Parbhani-Parli-Vaijnath (62 RKM), Kalikiri-Thummanamgutta (50 RKM), Purnea-Jogbani (79 RKM), Chheharta-Atari (18 RKM), Samakhiali-Bachau, Bachua-Adipur via Gandhidham upto New Bhuj (115 RKM), Sihor-Bhavnagar Terminus (21 RKM) and Wankaner-Maliyamiyana (97 RKM).

General Manager Shri Pramod Kumar while addressing officers and staff at CORE/HQ said that this outstanding achievement is a result of tireless efforts, immaculate planning and precise coordination with the Zonal Railways. This shows the inherent strength of the Railway system in general and CORE in particular which is willing to accept challenges and deliver results. He congratulated the entire team CORE o­n such a stupendous feat and expressed happiness that CORE has played a leading role in electrification works will take Indian Railway to newer heights.

Courtesy: CORE


Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer




2
WR Press Release No. 2023/03 04-03-2023
MUMBAI
WESTERN RAILWAY TO RUN WEEKLY SUMMER SPECIAL TRAINS ON SPECIAL FARE FOR VARIOUS DESTINATIONS

WESTERN RAILWAY TO RUN WEEKLY SUMMER SPECIAL TRAINS o­n SPECIAL FARE FOR VARIOUS DESTINATIONS

EXTENSION OF TRIPS OF SUPERFAST SPECIAL TRAIN BETWEEN

BANDRA TERMINUS AND JABALPUR

For the convenience of passengers and with a view to meet the travel demand, Western Railway has decided to run four summer special trains o­n Special fare for various destinations and o­ne Holi Special train between Bandra Terminus & Bhavnagar. The trips of Bandra Terminus – Jabalpur is also being extended.

According to a press release issued by Shri Sumit Thakur – Chief Public Relations Officer of Western Railway, the details of these train are as under:

1.Train No. 09075/09076 Mumbai Central - Kathgodam (Weekly) Superfast Special [34 TRIPS]

Train No. 09075 Mumbai Central - Kathgodam Superfast Special will depart from Mumbai Central every Wednesday at 11.00 hrs. & will reach Kathgodam at 14.30 hrs., the next day. This train will run from 08th March, 2023 till 28th June, 2023. Similarly, Train No. 09076 Kathgodam – Mumbai Central Superfast Special will depart from Kathgodam every Thursday at 17.30 hrs. & will arrive Mumbai Central at 20.55 hrs., the next day. This train will run from 09thMarch, 2023 till 29th June, 2023.

Enroute this train will halt at Borivali, Vapi, Valsad, Surat, Vadodara, Ratlam, Kota, Gangapur City, Hindaun City, Bharatpur, Achhnera, Mathura, Hathras City, Kasganj, Badaun, Bareilly Jn., Bareilly City, Izzatnagar Jn., Baheri, Kichha, Lalkua Jn. and Haldwani Stations in both directions.

This train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class, and General Second-Class coaches.

2.Train No. 09185/09186 Mumbai Central – Kanpur Anwarganj Superfast Special (Weekly) [32 Trips]

Train No. 09185 Mumbai Central – Kanpur Anwarganj Superfast Special will depart from Mumbai Central every Saturday at 11.05 hrs. & will reach Kanpur Anwarganj at 15.35 hrs., the next day. This train will run from 11th March, 2023 till 24th June, 2023. Similarly, Train No. 09186 Kanpur Anwarganj - Mumbai Central Superfast Specialwill depart from Kanpur Anwarganj every Sunday at 18.40 hrs. & will arrive Mumbai Central at 22.30 hrs., the next day. This train will run from 12th March, 2023 till 25th June, 2023.

Enroute this train will halt at Borivali, Vapi, Surat, Vadodara, Ratlam, Kota, Gangapur City, Bharatpur, Achhnera, Mathura, Mathura Cant, Hathras City, Kasganj, Farrukhabad, Kannauj and Bilhaur Stations in both directions.

This train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class and General Second-Class coaches.

3.Train No. 09091/09092 Udhna – Hisar (Weekly)[34 TRIPS]

Train No. 09091 Udhna – Hisar Superfast Special will depart from Udhna every Wednesday at 01.10 hrs and reach Hisar at 22.25 hrs, the same day. This train will run from 8thMarch, 2023 till 28th June, 2023.Similarly, Train No. 09092 Hisar – Udhna Special will depart from Hisar every Thursday at 00.15 hrs and reach Udhna at 00.05 hrs, the next day. This train will run from 9th March, 2023 till 29th June, 2023.

Enroute this train will halt at Surat, Bharuch, Vadodara, Dahod, Ratlam, Kota, Sawai Madhopur, Durgapura, Jaipur, Chomun Samod, Ringas, Shri Madhopur, Nim Ka Thana, Narnaul, Rewari, Charkhi Dadri, Bhiwani and Hansi Stations in both directions.

This train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class, and General Second-Class coaches.

4.Train No. 09117/09118 Surat - Subedarganj Special (Weekly) [34 Trips]

Train No. 09117 Surat - Subedarganj Special will leave Surat every Friday at 06.00 hrs & will reach Subedarganj at 08.40 hrs the next day. This train will run from 10thMarch, 2023 till 30th June, 2023. Similarly, Train No. 09118 Subedarganj - Surat Superfast Special will depart from Subedarganj every Saturday at 19.25 hrs & will arrive Surat at 20.00 hrs the next day. This train will run from 11th March, 2023 till 01st July, 2023.

Enroute this train will halt at Bharuch Jn, Vadodara Jn, Dahod, Ratlam Jn, Ujjain Jn, Maksi Jn, Shajapur, Pachor Road, Biyavra Rajgarh, Ruthiyai, Guna, Badarwas, Shivpuri, Gwalior, Malanpur, Soni, Bhind, Etawah, Govindpuri and Fatehpur stations in both directions.

This train comprises of AC 3-Tier and Sleeper Class coaches.

 

5. Train No. 09203/09204 Bandra Terminus – Bhavnagar Terminus Special [2 trips]

Train No. 09203 Bandra Terminus – Bhavnagar Special will depart from Bandra Terminus o­n Wednesday, 8th March, 2023 at 14.50 hrs and reach Bhavnagar Terminus at 06.15 hrs, the next day. Similarly, Train No. 09204 Bhavnagar – Bandra Terminus Special will depart from Bhavnagar on Tuesday, 7th March, 2023 at 21.30 hrs and arrive Bandra Terminus at 11.15 hrs, the next day.

Enroute this train will halt Borivali, Vapi, Surat, Vadodara Jn, Ahmedabad, Botad, Songadh and Sihor (Gujarat) stations in both directions.

This train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class and General Second Class coaches.

Extension of trips of Train No. 02133/02134 Bandra Terminus – Jabalpur Superfast Special

Train No. 02133 Bandra Terminus – Jabalpur Special which was earlier notified up to 29th April,2023 has now been extended up to 1st July,2023.

Likewise, Train No. 02134 Jabalpur – Bandra Terminus Special which was earlier notified up to 28thApril,2023 has now been extended up to 30th June,2023.

Enroute, this train will halt at Borivali, Vapi, Surat, Vadodara, Ratlam, Ujjain, Sant Hirdaram Nagar, Bhopal, Narmadapuram, Itarsi, Pipariya, and Narsinghpur stations in both directions.

The train comprises of AC 2-Tier, AC 3-Tier, Sleeper Class and General Second Class coaches. 

The booking for Train No. 09075, 09185, 09091, 09117, 09203 & 09204 and for the extended trips of Train No. 02133 will open from 05.03.2023 at all PRS Counters and o­n IRCTC website. The above trains will run as special train o­n special fare. For detailed information regarding timings of halts and composition, passengers may please visit www.enquiry.indianrail.gov.in.

 

*********






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit