For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (SHR)SIHORA ROAD to (MJA)MEJA ROAD


Address: Madhya Pradesh 483225, India

Station Code: SHR

Station Name: SIHORA ROAD

Zone: WCR/West Central

Train Frequency Weekly: 249

Station Traffic: High

Address: Uttar Pradesh 212305, India

Station Code: MJA

Station Name: MEJA ROAD

Zone: NCR/North Central

Train Frequency Weekly: 95

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
13202LTT RJPB EXPSHR16:10MNF00:108:00M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13202 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
24-02-2023
होली पर्व के दौरान यात्रियों की सुविधा हेतु निम्न विशेष गाड़ियों का संचालन

 

रेल प्रशासन द्वारा होली पर्व के दौरान यात्रियों की सुविधा हेतुनिम्न विशेष गाड़ियों का संचालनकरने का निर्णय लिया गया है, जिसका विवरण निम्नवत है-   

1.  à¤—ाड़ी सं.  02191/02192  à¤œà¤¬à¤²à¤ªà¥à¤°-दानापुर -जबलपुरसुपरफास्ट होली विशेष गाड़ी

दिन

गाड़ी सं. 02191जबलपुरसे सोमवार को

गाड़ी सं. 02192दानापुर से मंगलवार को

अवधि

जबलपुरसे दिनांक  : 06.03.23 = 01 फेरा

दानापुर से दिनांक   : 07.03.23 = 01 फेरा

फेरा

2एसएलआर+ 2 सामान्य श्रणी +11स्लीपर श्रणी +6 एसी तृतीय श्रेणी +2 एसी द्वितीय श्रेणी + 1 एसी प्रथम श्रणी= 24 डिब्बे

          

समय एवं ठहराव-

गाड़ी सं . 02191

जबलपुर-दानापुर सुपर फास्ट विशेष

स्टेशन

गाड़ी सं . 02192

दानापुर -जबलपुरसुपर फास्ट विशेष

आगमन

प्रस्थान

आगमन

प्रस्थान

----

20.05

Jabalpur

00.10

---

20.38

20.40

Sihora road

23.24

23.26

21.20

21.25

Katni

22.40

22.45

22.10

22.12

Maihar

21.30

21.32

22.45

22.50

Satna

21.00

21.05

00.10

00.12

Manikpur

19.53

19.55

00.53

00.55

Shankargarh

18.13

18.15

01.50

01.55

Prayagrajchheoki

17.40

17.45

03.10

03.12

Mirzapur

16.18

16.20

05.10

05.20

Pt.Deendyaal Upadhyaya Jn.

15.05

15.15

06.30

06.32

Buxar

12.58

13.00

07.40

07.42

Ara

12.08

12.10

08.45

---

Danapur

--

11.30

 

2. गाड़ी सं. 02155/02156 रानी कमलापति -दानापुर -रानी कमलापति सुपरफास्ट होली विशेष गाड़ी

दिन

गाड़ी सं. 02155 रानी कमलापति से रविवार

गाड़ी सं. 02156दानापुर सेसोमवार

अवधि

रानी कमलापति रेलवे स्टेशन से दिनांक :  05.03.23 एवं12.03.23  = 02 फेरे

2

11-01-2022
NCR makes giant stride towards electrification

उत्‍तर मध्‍य रेलवे

जनसम्‍पर्क कार्यालय

उत्‍तर मध्‍य रेलवे,प्रयागराज

पत्रांक: 11पीआर/01/2022 प्रेस विज्ञप्तिदिनांक: 10.01.2022

NCR makes giant stride towards electrification

92% of NCR’s broad gauge network is now electrified

With the electrification of Shikohabad-Mainpuri section o­n 31st December, total electrified route km in NCR now stands at 2933

Electrification of 5 major routes completed in calendar year 2021.

Aggressively pursuing towards mission 100% electrification, NCR completed a total of 216 Route Kilometer & 314 Track Kilometer of electrification between April-December'2021.

Major routes which have been electrified during first three quarters of current financial year are:

Birlanagar-Udimor (101 km)

Mahoba-Khajuraho (64 km)

Shikohabad-Mainpuri (51 km)

In addition, newly laid double line between Chaunrah-Malasa (19 km), Nandkhas-Parauna (32 km) (both part of Bhimsen-Jhansi doubling project) and third line between Babina- Jhansi (24 km) are opened along with electrification.

At present, NCR has 2933 electrified Route Km and 6313 electrified track kilometers.

·Electrification works completed in NCR during calendar year 2021 are:

1.Bharatpur- Bandikui (97.5 km)

2.Bhandai- Etawah (114 km)

3.Mahoba-Khajuraho (64 km)

4.Birlanagar-Udimor (101 km)

5.Shikohabad-Manipuri (51km)

 

In addition to above major routes, electrification works of sidings like Chunar, Churk, Meja NTPC, Shankargarh have also been completed.

As a result of massive electrification, need for traction changing from AC engine to diesel engine is now done away at these places thereby reducing detentions and increasing mobility and punctuality.

With a total broad gauge network of 3222 route kilometers in NCR, electrified route km (2933) now stands at 91% of overall broad gauge network of NCR.

Electrification of remaining routes like Khajuraho-Udaipura, Barhan-Etah and Etawah-Mainpuri-Farrukhabad is targeted to be completed this year.

 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit