2 Trains from (KTU)KUTTIPPURAM to (BQI)BOMMIDI
Address: Kuttipuram Railway Station, Kuttippuram, Kerala 679571, India
Station Code: KTU
Station Name: KUTTIPPURAM
Zone: SR/Southern
Train Frequency Weekly: 223
Station Traffic: High
Address: Bommudi Pappiredipatti Road, Bommidi, Tamil Nadu 635301, India
Station Code: BQI
Station Name: BOMMIDI
Zone: SR/Southern
Train Frequency Weekly: 101
Station Traffic: Medium
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.sr.indianrailways.gov.in- 2023-04-21
To clear extra rush of passengers during Summer Season, following special trains will be operated as follows: Train No. 06083/06084 Kochuveli – SMVT Bengaluru – Kochuveli Special Fare Summer Specials: Train No. 06083 Kochuveli – SMVT Bengaluru Special Fare Summer Special will leave Kochuveli at 18.05 hrs on 25th April, 02nd, 09th, 16th, 23rd, 30th May, 06th, 13th, 20th, 27th June, 2023 (Tuesday) and reach SMVT Bengaluru at 10.55 hrs, the next day (10 Services) In return direction Train No. 06084 SMVT Bengaluru - Kochuveli Special Fare Summer Special will leave SMVT Bengaluru at 12.45 hrs on 26th April, 03rd, 10th, 17th, 24th, 31st May, 07th, 14th, 21st, 28th June, 2023 (Wednesday) and reach Kochuveli at 06.00 hrs, the next day (10 Services) Coach Composition: 16- AC Three Tier Coaches, 2- Sleeper Class Coaches & 2- Luggage cum Brake Vans The details of timings and stoppages of Train No. 06083/06084 Kochuveli – SMVT Bengaluru – Kochuveli Special Fare Summer Specials are as follows:
2. Train No. 06041/06042 Tambaram – Mangaluru Jn – Tambaram Special Fare Summer Specials: Train No. 06041 Tambaram – Mangaluru Jn Special Fare Summer Special will leave Tambaram at 13.30 hrs on 25th April, 02nd, 09th, 16th, 23rd, 30th May, 06th, 13th, 20th, 27th June, 2023 (Tuesday) and reach Mangaluru Jn at 06.45 hrs, the next day Train No. 06042 Mangaluru Jn - Tambaram Special Fare Summer Special will leave Mangaluru Jn at 10.00 hrs on 26th April, 03rd, 10th, 17th, 24th, 31st May, 07th, 14th, 21st, 28th June, 2023 (Wednesday) and reach Tambaram at 04.45 hrs, the next day Coach Composition: 2- AC Two Tier Coaches, 2- AC Three Tier Coaches, 12- Sleeper Class Coaches, 2- General Second Class Coaches & 2- Second Class (Divyangjan Friendly) 2 www.sr.indianrailways.gov.in- 2022-09-22
General Manager of Southern Railway conducts annual Inspection of Jolarpettai – Erode section in Salem Division Shri B. G. Mallya, General Manager, Southern Railway conducted the statutory annual inspection of Jolarpettai - Erode Section in Salem Division today, 21st September, 2022. Shri A. G. Srinivas, Divisional Railway Manager of Salem Division, Principal Heads of Departments, Officers and Senior Supervisors from HQRS and Salem Division accompanied the General Manager during the annual inspection. The inspection started from Tirupattur station where General Manager inspected station working and surrounding area. At Tiruppattur Railway Station, a new advertisement branding of Locomotive was unveiled as part of product promotion in the division. Loco Branding has become a popular mode of Advertisement in Indian Railways in recent times. During the inspection, a speed trial was conducted between Tirupattur - Morappur stations (48 km stretch). The inspection special clocked a speed of 121 kmph which was a testimony to the good condition of track, signaling and other parameters. On the way to Salem Shri B. G. Mallya inspected Morappur, Bommidi, Lokkur stations. He inspected a lift, the newly developed garden Junior Engineer/Permanent Way offices, Gang Rest Rooms, newly erected Solar Panels, Inspection of Level crossing gates, Traction substations, Rain water harvesting etc. He inspected the various engineering works undertaken in the section for strengthening of tracks and appreciated the efforts of the various departments especially the technical staffs for their meritorious work. Moving further, General Manager and Officers team inspected a major bridge No.206 at Km 308/30-32 and minor bridges, curves and points in the section. He also interacted with the Gang Staffs and enquired about their welfare and solicited their cooperation in safe running of trains. On reaching Salem Station, a thorough inspection of various passenger amenities, Crew lobby, running rooms, inauguration of Automatic Ticket Vending Machine (ATVM) and Electronic Leak Detection testing/training centre. Various Utilities such as BMI Kiosk, Station App, and Gang rest room, New Senior Sectional Engineer/Permanent Way office etc were commissioned during the inspection. He also visited the Salem Railway colony and Annex building at Salem Divisional office and inspected the works review module developed by the Accounts department. Later General Manager also released Booklets on Operating, Accounts, Personnel and Safety posters. Later during the day, Shri B. G. Mallya along with the team of officers conducted a speed trial from Salem to Sankaridurg (38 km stretch) and on his way to Erode inspected the major ongoing track renewal works in the section. He inspected the major bridge No.322 at Km 376/22-24 and minor bridges, LC gates, in the Anangur- Kaveri - Erode Stretch. After reaching Erode station General Manager inspected the Railway Hospital, dedicated/inaugurated new facilities and interacted with the Doctors and Paramedical staffs. A working model of Centre Buffer Coupling and Failure Indication and Brake Application system and its application in LHB coaches were commissioned at Multi Disciplinary Divisional Training Institute, Erode. He visited Diesel loco shed, electric loco shed at Erode and its various capabilities and commmissioned newly inducted machineries in the shed. Shri B. G. Mallya also interacted with Elected representatives, Passenger Associations, Commuters and Press and Media at various railway stations enroute and received their representations. General Manager appreciated the works done by various departments, staffs and gave cash awards to outstanding employees for their dedicated and sincere service during the inspection.
Follow us (D. Om Prakash Narayan) Sr.PRO
COMMENTS
NO Comments. Be the first to Comment...
|