For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








64 Trains from (KJT)KARJAT to (TNA)THANE


Address: Karjat, Maharashtra 410201, India

Station Code: KJT

Station Name: KARJAT

Zone: CR/Central

Train Frequency Weekly: 269

Station Traffic: High

Address: Thane Junction, Station Road, Kopri, Thane East, Thane, Maharashtra 400601, India

Station Code: TNA

Station Name: THANE

Zone: CR/Central

Train Frequency Weekly: 648

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
11028MUMBAI MAILLNL00:45TNA02:441:59M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11028 Status
11020KONARK EXPRESSLNL00:55TNA02:572:02M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11020 Status
51034CSMT FAST PASSKAD01:20TNA03:181:58M,TU,W,TH,F,SA,SU3A,SL,GN,51034 Status
51030BJP BB FAST PASKAD01:20TNA03:171:57M,TU,W,THSL,GN,51030 Status
51028FAST PASSENGERKAD01:20TNA03:171:57F,SA,SUSL,GN,51028 Status
16382CAPE MUMBAI EXPLNL01:50TNA03:441:54M,TU,W,TH,F,SA,SU2A,3A,SL,GN,16382 Status
11140GDG CSMT EXPLNL02:25KYN03:581:33M,TU,W,TH,SA,SU1A,2A,3A,SL,GN,11140 Status
11044LOKAMANYA TT EXPLNL03:07TNA05:021:55SA2A,3A,SL,GN,11044 Status
19201SC PBR EXPLNL03:07KYN04:371:30W2A,3A,SL,GN,19201 Status
17204COA BVC EXPRESSLNL03:07KYN04:371:30TH2A,3A,SL,GN,17204 Status
17018RAJKOT EXPRESSLNL03:07KYN04:371:30M,TU,SA2A,3A,SL,GN,17018 Status
16614RAJKOT EXPRESSLNL03:07KYN04:371:30TH2A,3A,SL,GN,16614 Status
11036SHARAVATI EXPLNL03:20KYN04:471:27SU2A,3A,SL,GN,11036 Status
11022CHALUKYA EXPLNL03:20KYN04:491:29M,TH,F2A,3A,SL,GN,11022 Status
11006CHALUKYA EXPLNL03:20KYN04:471:27TU,W,SU2A,3A,SL,GN,11006 Status
12164CHENNAI EXPLNL03:30KYN04:571:27M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12164 Status
12116SIDDHESWAR EXPKAD04:00TNA05:321:32M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12116 Status
17317LOKAMANYA TT EXPLNL04:20TNA06:332:13M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17317 Status
17412MAHALAXMI EXPKAD04:40TNA06:271:47M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,17412 Status
22144BIDR CSTM SF EXPLNL05:15TNA07:041:49TH,SA,SU1A,2A,3A,SL,GN,22144 Status
22108LATUR CSMT EXPLNL05:15TNA07:041:49M,TU,W,F1A,2A,3A,SL,GN,22108 Status
16587YPR BKN EXPLNL06:10KYN07:471:37F,SU2A,3A,SL,GN,16587 Status
19567VIVEK EXPLNL06:10KYN07:471:37SU2A,3A,SL,GN,19567 Status
12493DARSHAN EXPRESSLNL06:10KYN07:471:37SU1A,2A,3A,12493 Status
61010ROHA DIVA MEMUSMNE06:43TPND07:150:32M,TU,W,TH,F,SA,SUUNRESERVED61010 Status
11010SINHAGAD EXPKAD07:20KYN08:451:25M,TU,W,TH,F,SA,SUCC,2S,GN,11010 Status
61016PEN DIVA MEMU TRAINSMNE08:10TPND08:430:33M,TU,W,TH,FUNRESERVED61016 Status
12126PRAGATI EXPRESSLNL08:40TNA10:281:48M,TU,W,TH,F,SA,SUCC,2S,GN,12126 Status
17221COA LTT EXPRESSLNL08:50LTT11:052:15W,SA2A,3A,SL,GN,17221 Status
11024SAHYADRI EXPKAD09:00TNA11:122:12M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11024 Status
22498SGNR HUMSAFAR SFLNL09:35KYN11:001:25F3A22498 Status
14805BARMER AC EXPLNL09:35KYN11:001:25M1A,2A,3A,14805 Status
17032MUMBAI EXPLNL10:15KYN11:471:32M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,17032 Status
11042MUMBAI EXPRESSLNL10:45TNA12:391:54M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11042 Status
50104RN DADAR PASSSMNE12:05TNA13:271:22M,TU,W,TH,F,SA,SU2S,GN,50104 Status
01447PUNE KRMI SPLLNL13:13KYN14:471:34F3A,SL,GN,01447 Status
11026PUNE BSL EXPCKHS14:10KYN15:121:02M,TU,W,TH,F,SA,SUCC,SL,2S,GN,11026 Status
61020PEN DIVA MEMU TRAINSMNE14:35TPND15:040:29M,TU,W,TH,FUNRESERVED61020 Status
22943PUNE INDORE EXPLNL16:40KYN18:201:40M,TU,TH,F,SA2A,3A,SL,GN,22943 Status
11008DECCAN EXPRESSKAD16:40TNA18:281:48M,TU,W,TH,F,SA,SUCC,2S,GN,11008 Status
11030KOYNA EXPRESSKAD17:10TNA19:122:02M,TU,W,TH,F,SA,SUCC,2S,GN,11030 Status
11302UDYAN EXPLNL17:15KYN18:521:37M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,11302 Status
61012ROHA DIVA MEMUSMNE17:41TPND18:120:31M,TU,W,TH,F,SA,SUUNRESERVED61012 Status
16332MUMBAI EXPRESSLNL18:00TNA19:471:47SA2A,3A,SL,GN,16332 Status
16352NCJ MUMBAI EXPLNL18:00TNA19:491:49TH,SU2A,3A,SL,GN,16352 Status
16340MUMBAI EXPRESSLNL18:00TNA19:471:47M,TU,W,F2A,3A,SL,GN,16340 Status
50106SWV DIVA PASSSMNE18:52TPND19:260:34M,TU,W,TH,F,SA,SU2S,GN,50106 Status
19311PUNE INDORE EXPLNL19:00BIRD21:282:28W,SU2A,3A,SL,GN,19311 Status
12128INTERCITY EXPLNL19:05TNA20:241:19M,TU,W,TH,F,SA,SUCC,2S,GN,12128 Status
06051MAS ADI EXPLNL19:20KYN21:101:50SA2A,3A,SL,GN,06051 Status
22106INDRAYANI EXPLNL19:25TNA21:081:43M,TU,W,TH,F,SA,SUCC,2S,GN,22106 Status
16532GARIB NAWAZ EXPLNL20:00KYN21:271:27F2A,3A,SL,GN,16532 Status
16534SBC JODHPUR EXPLNL20:00KYN21:271:27SU2A,3A,SL,GN,16534 Status
16508JODHPUR EXPRESSLNL20:00KYN21:271:27M,W1A,2A,3A,SL,GN,16508 Status
16506GANDHIDHAM EXPLNL20:00KYN21:271:27SA2A,3A,SL,GN,16506 Status
16210AJMER EXPRESSLNL20:00KYN21:271:27TU,TH2A,3A,SL,GN,16210 Status
11092PUNE BHUJ EXPLNL20:45KYN22:171:32M1A,2A,3A,SL,GN,11092 Status
11096AHIMSA EXPRESSLNL20:45KYN22:171:32W1A,2A,3A,SL,GN,11096 Status
11088PUNE VERAVAL EXPLNL20:45KYN22:171:32TH1A,2A,3A,SL,GN,11088 Status
11090PUNE BGKT EXPLNL20:45KYN22:171:32SU1A,2A,3A,SL,GN,11090 Status
11050AHMEDABAD EXPLNL20:45KYN22:171:32SA2A,3A,SL,GN,11050 Status
11076BIDR LTT EXPLNL20:55TNA22:531:58W2A,3A,SL,GN,11076 Status
11012NED LTT EXPRESSLNL20:55TNA22:531:58TH2A,3A,SL,GN,11012 Status
11018KIK LTT EXPRESSLNL20:55TNA22:531:58M2A,3A,SL,GN,11018 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit