For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








11 Trains from (BDC)BANDEL JN to (KWAE)KATWA

Check Vice Versa

Address: Bandel, West Bengal, India

Station Code: BDC

Station Name: BANDEL JN

Zone: ER/Eastern

Train Frequency Weekly: 360

Station Traffic: High

Address: Katwa, Station Bazar To Kachari Road, Katwa, West Bengal 713130, India

Station Code: KWAE

Station Name: KATWA

Zone: ER/Eastern

Train Frequency Weekly: 85

Station Traffic: Medium


Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
15643PURI KYQ EXPRESBDC08:32KWAE11:002:28SU3A,SL,15643 Status
13063HWH BLGT EXPBDC08:47KWAE10:522:05M,TU13063 Status
13141TESTA TORSA EXPBDC 14:57KWAE16:551:58M,TU,W,TH,F,SA,SU2A,3A,SL,13141 Status
13465INTERCITY EXPBDC16:02KWAE18:032:01M,TU,W,TH,F,SA,SUCC,2S,13465 Status
15959KAMRUP EXPRESSBDC18:30KWAE20:592:29M,TU,W,TH,F,SA,SU2A,3A,SL,15959 Status
13145RADHIKAPUR EXPBDC21:00KWAE22:531:53M,TU,W,TH,F,SA,SU2A,3A,SL,13145 Status
13163HATE BAZARE EXPBDC21:28KWAE23:292:01M,TU,W,TH,F,SA,SU2A,3A,SL,13163 Status
12517GHY GARIB RATHBDC22:54KWAE00:291:35TH,SU3A12517 Status
15711HWH KIR EXPRESSBDC22:54KWAE00:291:35TU2A,3A,SL,15711 Status
12525KOAA DBRG EXPBDC22:54KWAE00:291:35W2A,3A,SL,12525 Status
15721PAHARIA EXPRESSBDC22:54KWAE00:291:35SA1A,3A,SL,15721 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains


PINCODES.INFO




RECENT NEWS

1
09-06-2015
Press Release : HON’BLE MINISTER FOR RAILWAYS INAUGURATED A NUMBER OF PASSENGER AMENITY PROJECTS, DEDICATED DOUBLING PROJECTS AT DR. B C ROY AUDITORIUM, SEALDAH, KOLKATA

                            


HON’BLE MINISTER FOR RAILWAYS INAUGURATED A NUMBER OF PASSENGER AMENITY PROJECTS, DEDICATED DOUBLING PROJECTS

AT DR. B C ROY AUDITORIUM, SEALDAH, KOLKATA

Kolkata, June 6, 2015 

          Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways inaugurated a number of passenger amenity projects, dedicated doubling projects, laid the foundation stone of some important projects of eastern & south eastern railway and flagged off new train services at Dr. B C Roy Auditorium, Sealdah, Kolkata. 

          This morning Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways inaugurated PRS & UTS pre-printed ticket printing machine at Howrah Printing Press, a Sports Complex at Kanchrapara, True Colour Display for passenger information system at Sealdah Main station and Wi-Fi facility at Howrah station of Eastern Railway and Hijli station building of South Eastern Railway. 

          He also dedicated Dakshin Barasat – Mathurapur, Dainhat – Purbasthali, Dhatrigram – Ambika Kalna, Dhatrigram – Purbasthali, Nalhati – Moregram, Phulia – Kalinarayanpur, Bhagwangola – Jiaganj, Krishnanagar – Plassey, Poradanga – Monigram, Tinpahar – Maharajpur & Sahibganj – Pirpainti double lines a total of 219.43 kms o­n Eastern Railway and  3rd line between Shyamchak and Kharaghpur and Tamluk & Basulyasutahata doubling, a total of 33.9 km o­n South Eastern Railway. 

          He laid the foundation stone of Kharaghpur – Narayangarh 3rd line and Andul – Baltikuri doubling o­n South Eastern Railway. 

          o­n the same occasion, the Hon’ble Minister also flagged off four new EMU services viz. Sonarpur – Mathurapur Road, Mathurapur Road – Baruipur, Baruipur – Diamond Harbour and Diamond Harbour – Sonarpur of Sealdah Division. 

          All these programmes were done through remote from the Dr. B C Roy Auditorium, Sealdah. Later, Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways addressed the press and media persons of Kolkata. He briefed the press o­n the progress of 129 o­ngoing Railway projects in West Bengal covering a total length of 3282 kms at a cost of Rs.26381 crores. Out of these, 30 projects have already been commissioned covering a length of 860 kms at a cost of Rs.2177 crores. Out of total of 69 new line construction projects covering 1809 kms at a cost of Rs.13213 crores, 5 projects have been commissioned covering a total length of 260 kms at a cost of Rs.1086 crores. In gauge conversion also out of 6 projects, 2 projects have been commissioned covering a length of 136 kms at a cost of Rs.524 crores. In doubling, out of 54 projects, 23 projects have been commissioned with a total length of 464 kms at a cost of Rs.567 crores. Allotment of fund has been enhanced this considerably in comparison to previous year. 165 kms of double line projects have been completed in West Bengal last year. The entire section from Bandel to Katwa (105 kms) has been doubled. An important link between Rampurhat & Dumka has been commissioned o­n 4th June, 2015 linking Bengal’s holy place of Tarapith with the holy place of Deoghar by shortening the distance by 96 kms.         

          Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways said that all projects in West Bengal will be taken up in consultation with the State Government o­n prioritizing the projects with the availability of funds. He sought cooperation from the State Government for improving the Railway services in the state of West Bengal. 

          Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways also informed the press about the development and achievements of the Govt. of India in respect of various activities which covers ensuring dignity of labour, mainstreaming the deprived, pride of farmers welfare projects, financial security for the poor i.e. Pradhan Mantri Jan Dhan Yojna, social security for the poor etc. He informed that the work taken up by various ministries under the leadership of Hon’ble Prime Minister for the last o­ne year. The ‘Make in India’ & ‘Swachh Bharat Mission’ will take the country forward for a better tomorrow. 

          In the afternoon, Shri Suresh Prabhakar Prabhu, Hon’ble Minister for Railways also had discussions with the members of Merchant Chamber of Commerce about the Railway facilities available in West Bengal. He sought cooperation from the Chamber and appealed them to contribute towards the Corporate Social Responsibility (CSR) projects of Railways. He asked the Chamber to adopt some stations and enhance the passenger amenities for the benefit of rail users.






2
09-06-2015
Press Release: GM/ER FLAGGED OFF STATE-OF-THE-ART NEW 12-COACH EMU RAKE AT HOWRAH STATION


                                    


GM/ER FLAGGED OFF STATE-OF-THE-ART

NEW 12-COACH EMU RAKE AT HOWRAH STATION

Kolkata, June 8, 2015:

Shri R. K. Gupta, General Manager, Eastern Railway flagged off state-of-the-art new 12-coach EMU rake of Howrah – Bandel local at Howrah station this morning.

The salient features of this state-of-the-art new 12-coach EMU rake is as follows:

·Ergonomically designed injection molded poly carbonate fire retardant seats for better ambience & passenger comfort.

·Extensive use of Fiber Reinforced Plastic (FRP) panels in interiors to give pleasant ambience for the passengers.

·Electronic Head Code for display of Train No. & Destination.

·Public announcement system available.

·65W, 450 mm. sweep fans for better air flow.

·Light diffusers used inside the coach light to give improved lighting & pleasant experience.

·14 luggage racks in Motor coach and 18 luggage racks in Trailer coaches.

·Bigger window of size 1770 mm. x 870 mm.

·Air spring in secondary suspension for better riding quality. ·

·Skid proof chequered sheet flooring.

·Stainless steel grab handles & Grab poles.

DRIVING CREW CONVENIENCE:

·Driver desk area has been ergonomically designed to minimize driver’s fatigue.

·24” wide sunvisor has been provided o­n Guard & Driver side for sun light protection.

DESIGN AND SAFETY FEATURES:

·Side wall skin with special dull finish stainless steel sheet to avoid periodic paintings of side wall exterior.

·Aero dynamically designed FRP cab and cab skirt in motor coach which provides modern aesthetic appeal to the coach. ·

·Maximum use of Fire retardant FRP panels.

·Seating Capacity of 1228 passengers for 12 car rake.

·Max permissible speed 100 Kmph.

With the introduction of this rake, the journey of the local passengers will improve further in respect of comfort and safety. The design and the safety features have been done with most significantly to help the passengers to get more comfort.







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search