For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (ALD)ALLAHABAD JN to (NBA)NABHA


Address: Allahabad Railway Station, Allahabad, Uttar Pradesh, India

Station Code: ALD

Station Name: ALLAHABAD JN

Zone: NCR/North Central

Train Frequency Weekly: 669

Station Traffic: High

Address: Railway Station Nabha, Nabha, Punjab 147201, India

Station Code: NBA

Station Name: NABHA

Zone: NR/Northern

Train Frequency Weekly: 117

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
13008U A TOOFAN EXPALD22:15NBA02:0620:09M,TU,W,TH,F,SA,SU3A,SL,GN,13008 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer




2
No.73/2023-2403-05-2023
Chennai
Bharat Gaurav Train between Kochuveli and Prayagraj

‘Divine Journey: Puniya Theertha Yathirai’

Train No. 06909/06910 Kochuveli – Prayagraj - Kochuveli Bharat Gaurav Trains:

Train No. 06909 Kochuveli – Prayagraj Jn Bharat Gaurav Train will leave Kochuveli at 22.00 hrs o­n 04th May, 2023 and reach Prayagraj Jn at 13.00 hrs o­n 13th May, 2023

Train No. 06910 Prayagraj Jn – Kochuveli Bharat Gaurav Train will leave Prayagraj Jn at 13.30 hrs o­n 13th May, 2023 and reach Kochuveli at 22.45 hrs o­n 15th May, 2023

Coach Composition4- AC Three Tier Coaches, 7- Sleeper Class Coaches, 1- Pantry Car & 2- Luggage cum Brake Vans

Itinerary details:

Kochuveli - Puri - Konark - Kolkata - Gaya - Varanasi - Ayodhya -  Allahabad - Kochuveli

The details of timings and stoppages of Train No. 06909/06910 Kochuveli – Prayagraj - Kochuveli Bharat Gaurav Train are as follows:

Date & Day

Station

Arrival

Departure

04.05.23

Thursday

Kochuveli

-

22.00

Kollam Jn

23.00

23.05

05.05.23

Friday

Sengottai Jn

03.50

04.00

Tenkasi Jn

04.15

04.20

Rajapalayam Jn

05.15

05.20

Sivakasi Jn

05.45

05.55

Virudhunagar Jn

06.15

06.20

Madurai Jn

07.00

07.40

Dindigul Jn

09.15

09.20

Tiruchchirappalli

10.25

10.35

Thanjavur Jn

11.25

11.30

Kumbakonam Jn

12.05

12.10

Mayiladuthurai Jn

13.05

13.10

Chidambaram

13.50

13.55

Tripadripuliyur

14.30

14.35

Villupuram Jn

15.25

15.35

Chengalpattu Jn

16.50

16.55

Tambaram

17.25

17.30

Chennai Egmore

18.10

18.30

06.05.23

Saturday

Vijayawada

02.55

03.05

Simhachalam North

09.35

09.40

Vizianagaram Jn.

10.30

10.40

Malatipatpur

17.30

-

07.05.23

Sunday

Malatipatpur

-

23.30

08.05.23

Monday

Khurda Road Jn

00.30

00.40

Kharagpur

06.35

06.40

Andul

08.15

08.20

Bhatta Nagar

09.00

Kolkata

11.00

23.30

09.05.23 Tuesday

Dhanbad Jn.

04.45

04.50

Gaya

08.00

23.45

10.05.23

Wednesday

Pt.Deen Dayal Upadhyaya jn.

02.45

02.55

Banaras

04.15

-

11.05.23 Thursday

Banaras

-

21.00

Lohta

-

21.15

12.05.23 Friday

Ayodhya

06.00

22.20

13.05.23 Saturday

Prayagraj Sangam

05.00

11.50

Prayagraj

12.10

12.40

Prayagraj Jn



COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit